Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.2 LAccepted-AOC GHUMI LASKARPARA NEW TOWN N 24 PGS KOLKATA 700157 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700157 | ₹29.2 L | L1 | Accepted-AOC Lowest offer given by ROYAL DEVELOPERS |
| 2 | L2₹29.2 LRejected-Finance | ₹29.2 L | L2 | Rejected-Finance Higher offer given |
| 3 | L3₹29.3 LRejected-Finance NAWABPUR RAJARHAT KOLKATA 700135 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700135 | ₹29.3 L | L3 | Rejected-Finance Higher offer given |
| 4 | Not Admitted-Fee/PreQual/Technical NAWABPUR RAJARHAT NEW TOWN KOLKATA 00135 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700135 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹29.3 L
EMD Value
₹58,566
Closing Date
26 Feb 2026, 6:00 pmClosed
Addl. General Manager (Engg)-IV
HIDCO BHABAN
Construction of G.I chain link fencing along the Periphery of the Plot No - IIE/68, 61, 58, 58/1, and 8 near Bondher More in New town, Kolkata. Total Length 2700.0 Mtr.
2026_HIDCO_1013115_1
HIDCO/AGM(E)IV/FN/NIT152/25-26
Open Tender
CIVIL WORKS
Percentage
30 days
NEW TOWN
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹58,566
11 Mar 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
Supplying, fitting, fixing G.I chain link fencing 75 mm x 75 mm mesh 12 g wire to the R.C.C or wooden posts with galvanised hooks or staples etc. complete as per direction.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15% of weight for finished structal members weighing less than 22.5 Kg. /m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sandpapering etc.
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white)
Add CGST @9% of total amount to Rs.24,60,774.73
Add SGST @9% of total amount to Rs.24,60,774.73
Add Construction Cess @1% of total amount to Rs.24,60,774.73
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
2911_FORM.pdf
Tender Documents • 0.16 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.59 MB
BOQ_2488615.xls
BOQ • 0.34 MB
SPECIALTERMSANDCONDITION2.pdf
Tender Documents • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].