Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-Finance | L1 | Accepted-Finance III | |
| 2 | L2₹25.3 L+₹59,455 (2.41%)Accepted-Finance CC 1 BOOTH NO 8 JANTA BHAWAN ROAD SIRSA SIRSA HARYANA 125055 | SIRSA | HARYANA | 125055 | L2 | Accepted-Finance I | |
| 3 | L3₹25.3 L+₹59,702 (2.42%)Accepted-Finance NEAR EAST WEST PUBLIC SCHOOL SHAHABAD GATE RAMPUR U P | L3 | Accepted-Finance II |
Tender Value
₹24.6 L
EMD Value
₹52,000
Closing Date
20 Jan 2020, 3:00 pmClosed
SE,EDC,Rudrapur
Electricity Distribution circle, Rudrapur.
Replacement of LT bare conductor by LT AB CABLE UNDER 33/11kv S/S, Pantnagar.
2019_UPCL3_21803_1
EDC(USN)37/2019-20
Open Tender
Electrical Works
Item Rate
180 days
Kichha/Rudrapur
Pl. refer tender documents.
3 documents required · 3 mandatory
₹2,360
SE EDC Rudrapur
₹52,000
30 Jan 2020
26 Dec 2019
21 Jan 2020
26 Dec 2019
20 Jan 2020
26 Dec 2019
Amount
Laying of A.B. cabler (Supply)
Supply of Share head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size120sq.mm95sq.mm ( Tyco/ RPG/3M. make) ( As per drawing attached )
Supply of Share head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size95 sq.mm70sq.mm ( Tyco/ RPG/3M. make) ( As per drawing attached )
Supply of SMC Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer ( Sintex make or other ISI mark reputed company ) with Panel Lock with key) ( As per drawing attached )Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete
Supply of Dead End Clamps with I Hook. ( As per drawing attached ) & as per UPCL specification.
Supply of Suspension Clamp with I hook. ( As per drawing attached )& as per UPCL specification.
Supply of L.T. Bare Neutral connectors P.G. clamp, made of Aluminium 95sq.mm. to 95 sq.mm double bolt( For line toD.Box.) ( As per drawing attached )& as per UPCL specification.
Supply of L.T. Bare Neutral connectors P.G. clamp, made of Aluminium 95sq.mm. to 95 sq.mm double bolt( For line to line ) ( As per drawing attached )& as per UPCL specification.
Supply of Aluminium Lugs ‘O’ type size 25mm.( For connecting Cable PVC 4x25)& 4x16mm.
Supply of M.S. Clamp made of M.S. flate for PCC Pole size 50x6mm. with 3 Nos. Nut & Bolts ( size 65x16mm)without cracks & burrs for Dead End Clamps assemble.painted by primers.
Supply of M.S. half clamp made of M.S. Flat for P.C.C. Poe size 35x5mm. with 2 Nos. Nut & Bolts ( size 65x16mm)without cracks & burrsWith suitable Nut Bolt for Distribution Box duly painted by red oxide primer.
Supply of M.S. Clamp for SP-33 pole made of M.S. Flat size 50x6mm. With 3nos. Nuts boltwithout cracks & burrsWith suitable Nut Bolt for suspension clamp duly painted by red oxide prmer.
Supply of M.S. Clamp for SP-33 . pole made of M.S. Flat size 50x6mm. With 3nos. Nuts boltwithout cracks & burrsWith suitable Nut Bolt for dead end clamp duly painted by red oxide prmer.
Supply of M.S. Clamp for P.C.C.. pole made of M.S. Flat size 50x6mm. With 3nos. Nuts boltwithout cracks & burrsWith suitable Nut Bolt for suspension clamp duly painted by red oxide prmer.
Supply of M.S. Clamp made of M.S. Flat size 50x6mm. With 3nos. Nuts boltwithout cracks & burrs With suitable Nut Bolt forstay clamp duly painted by red oxide prmer.
Saluminium Lug size 240mm. For T/F.
Saluminium Lug size 120mm. For T/F.
Laying of AB Cable (Works.)
Head load cartage of following poles road to work site(Up to 0-1KM ) P.C.C. pole.
Head load cartage of following poles road to work site(Up to 0-1KM) SP-33 Pole.
Head load cartage of following poles road to work site(Up to 0-1KM) ABC size (3x120+1x95)& other small material.
Cartage of Small material including ABC Cable & XLPE Cable & conducor including Loading / Unloading of Small material from store centre at Haldwani approximate distance 05-20 KM.
Cartage of S.P.-33Long. including Loading / Unloading from store centre at Haldwani approximate distance 05-20KM.
Cartage of P.C.C. Pole 8.5 Mtr. Long. including Loading / Unloading from store centre at Haldwani approximate distance 05-20 KM.
Dismantling of old ACSR Conductor( L.T. Line) including Re- rolling back its conductor, wire, clamp, insulator etc .including stacking and transportation of material to the UPCL stores : 3phase 4 wire.
Dismantling of old ACSR Conductor( L.T. Line) including Re- rolling back its conductor, wire, clamp, insulator etc .including stacking and transportation of material to the UPCL stores :2hase 3wire.
Dismantling of old ACSR Conductor( L.T. Line) including Re- rolling back its conductor, wire, clamp, insulator etc .including stacking and transportation of material to the UPCL stores :1hase 2wire.
Erection & grouting of P.C.C. Pole8.5 Mtr. Long ( 180 kg. W/L )for reducing span of LT, ABC line including digging of pits 0.6x0.9x2.15 Mtr.grouting stone pad and making kiciking block in E&B And with fitting of all accessories & back filling with soil & boulder earthing complete work as per RESPO specification & as per direction of Engineer in charge : Single Pole
Errection & grouting of SP-33 pole by way of digging of pit size 900x75x650mm. Complete in all respect as per direction of Engineer In charge.
Erection of M.S. Earthing Rod 20x2500 by way of digging of pit size 50x750x990mm deep of earth electrode in to 1000mm. below, found level fixeing and connection Connecting it with support by means of G.I. wire No7/16 SWG with Bolt & Nuts etc ( Earthing Rod & Earth wire will be provided by UPCL)
Erection of stay set 16x1800mm. pit size 0.6x0.9x1.2 Mtr. as per specifications including 7/16SWG stay wire, binding, nozzling of stay with bcking filling of pit with CC 1:4:8 in bottom to pit in size 0.60.complete work stay set will be provided by UPCL.
Laying & Fixing Insulated Cable 4x16 sq.mm. insulated Lead(Cable Supplied by UPCL)
Laying, Sagging of AB Cable size 3x120+1x95+1x16sqmm2 including fixing of dead & clamp, suspention clamps with I Hook in all complete work as per instruction of Engineer-In-charge .
Laying, Sagging of AB Cable size31x95+1x70sqmm2 including fixing of dead & clamp, suspention clamps with I Hook in all complete work as per instruction of Engineer-In-charge .
Installation & Fixing of L.T.Distribution Box & Connection of L.T. consumer including all complete work.
Installation & Fixing of Alluminium Lug for AB Cable at existing transformer.
Removal of previous connection & Re-connection of single phase L.T. consumer service connection. & shifting meter from consumer premises inside to outside premises.
Removal of previous connection & Re-connection of Three phase L.T. consumer service connection. & shifting meter from consumer premises inside to outside premises.
Straighting of existing tilled PCC/rail pole/s.t. pole by digging earth.
Loppint & Chopping of tree of branches in line
ASHOK KUMAR AND CO
TNK Electricals
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .