Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
15 Jan 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
Servicing of Relief Valves, NRVs and assistance for testing of boiler system in SA Plant during ATA-2026
2025_FACT_891909_1
4097/2025-2026/E32756
Limited
Miscellaneous Works
Item Rate
30 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹2,000
Yes
16 Jan 2026
31 Dec 2025
16 Jan 2026
31 Dec 2025
15 Jan 2026
31 Dec 2025
Servicing of Relief Valves, NRVs and assistance for testing of boiler system in SA Plant during ATA-2026
Dismantling and Refixing of Valves Dismantling of the following valves from position, transport the valves to the workshop, fixing back in the system with new gasket, bolt-nuts etc.The number of valves dismantled will be as per the request from process department duly forwarded through mechanical maintenance department. 1. Startup steam NRV 200 NB - 1 No. 2. Super heater NRV - 1 No. 3. Steam vent line Isolation valve 200 NB - 2 Nos. 4. Start up I/V 200 NB - 1 No. 5. Boiler feed water NRV and Isolation valve each 80 NB- 2 Nos. (Temporary blinds shall be provided wherever necessary)
Dismantling and Refixing of Relief Valves and Steam Valves. Dismantling relief / safety valves of various vessels from position, transport the valves to work shop for reconditioning / testing and transport back, fixing in position with new gaskets, bolts nuts / studs etc. The number of valves dismantled will be as per the request from process department duly forwarded through mechanical maintenance department. List of valves : HP:- W4outlet-2, W6 outlet-1/2, Steam drum-2, Rv-6 Ph-1 Header- 1, super heater outlet- 2 MP:- RV1 8ATA header-1, RV3 8ATA melter –1, RV2 NPK 5 ATA-1, LP:-De-aerator –1, MAB exhaust –2, BFW turbine exhaust –1, 4ATA melter-1
Testing of Boiler Systems: After getting clearence open the steam drum for cleaning and box up with proper gaskets after cleaning/ inspection.Transport hydro testing pump from the storage location, blind the required numbers of flanges,remove the required number of valves from the system,line up the pump with the boiler system, provide man power assistance for testing the system, remove the blinds after testing, refix the valves with proper gaskets / bolts and nuts, box up the flanges, dismantle and transport the testing pump to the storage location.
HASSAN MM (BID ID -3350577)
finance_937484.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tenderdocuments.pdf
Tender Documents • 1.28 MB
Compliance.pdf
Tender Documents • 0.10 MB
SpecialConditions.pdf
Tender Documents • 0.07 MB
BOQ_937484.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .