Office of the Executive Engineer (Mech.), PIU Porbandar, Gujarat Maritime Board, GMB Office Complex, 1st Floor, Nr.S.T.Bus Station, Chowpati Road, Porbandar – 360575 (Gujarat) India
Maintenance and Repairing of High Mast lighting towers of various area at GMB Porbandar Port for 24 months.
321176
04 (Sr. No. 03) of 2026-27
Open
Electrical - All
Porbandar
2 documents required · 1 mandatory · 1 optional
₹1,770
The Port Officer GMB Porbandar Non-PLD ACCOUNT Payable at Porbandar
₹29,900
6 Jul 2026
6 Jul 2026
6 Jul 2026
20 Jul 2026
6 Jul 2026
Name of work: Maintenance and Repairing of High Mast lighting
towers of various area at GMB Porbandar Port for
Amount put to Tender: - Rs.
Office of the Executive Engineer (Mech.) D’cell
Gujarat Maritime Board
GMB Office Complex,
1 Floor, Nr.S.T.Bus Station,
Porbandar – 360575 (Gujarat) India
E-mail – [email protected]
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Name of work: Maintenance and Repairing of High Mast lighting towers
of various area at GMB Porbandar Port for 24 months.
Chapter No. Chapter Name Page No.
- Title Page 00 to
01 Notice Inviting Tender 02 to
02 General Information 05 to
03 Instruction to bidder 08 to
04 PQ FORM LIST- I TO VI 17 to
05 Tender Form for Electrical Work 24 to
06 Scope of work 98 to
07 Item specification 99 to
GENERAL CONDITION OF HIGH MAST
09 Commercial condition 114 to
10 General Conditions 115 to
11 Work Conditions 117 to
12 Special Condition For Wireman 120 to
Schedule for Amount Deduction of scrap
14 Annexure A 125 to
15 Price bid 129 to
Please read as:-
(1) GUJARAT MARITIME BOARD instead of GUJARAT STATE.
(2) Vice Chairman and Chief Executive Officer, GMB instead of Governor
(3) EXECUTIVE ENGINEER (MECH.) instead of EXECUTIVE ENGINEER.
Signature of Executive Engineer (M),D’cell
Contractor. GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
NOTICE INVITING TENDER (NIT)
On behalf of the Chairman-Gujarat Maritime Board, The Executive Engineer (Mech.),
D’cell, Office of the PIU Gujarat Maritime Board, GMB Office Complex, 1st Floor, Nr. S.T.
Bus Station, Chowpati Road, Porbandar – 360575 (Gujarat) India from reputed agencies
having sound background and experience in such type of similar work.
Department Name : Gujarat Maritime Board
Superintending Engineer (Mech.),
5th Floor, Sagar Bhavan, Sector 10A, CHH Road
Gujarat Meritime Board,
PPU-Gandhinagar -382010
Executive Engineer (Mech.),D’cell
Gujarat Maritime Board, PIU-Porbandar,
IFB No. : Tender Notice No.04 (Sr. No. 03) of 2026-27
Maintenance and Repairing of High Mast lighting
Name of Project : towers of various area at GMB Porbandar Port for
Location : At Various area of GMB Porbandar Port.
Maintenance and Repairing of High Mast lighting
Name of Work : towers of various area at GMB Porbandar Port for
Estimated Contract Value : Rs.
Period of Completion : 24 (twenty-four) Month
Bidding Type : Open
Bid Call (Nos.) : 01 (One)
Tender Currency Type : Single
Tender Currency Settings : Indian Rupee (INR)
Joint Venture : Not Applicable
Bid Document Fee : Rs. 1770.00 In form of D.D. (Non-refundable)
The Port Officer, GMB, Porbandar Non-PLD A/C
Bid Document Fee Payable To :
Payable at Porbandar.
Minimum of Rs. 29,900.00 in form of FDR
Bid Security / EMD (INR) :
With minimum 06 (Six) months validity.
Bid Security / EMD in favour Executive Engineer (Mech.),D’cell
of Gujarat Maritime Board, PIU-Porbandar,
Bid Document Downloading
Bid Document Downloading
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Last Date & Time for Receipt
(Submission) of Bids
Bid Validity Period : 120 days after opening of price bid
Bidder has to submit all the necessary documents
through Online in electronic format through online
scanning and data entry in required Annexures.
Also, all above documents along with Letter of
Application has to be submit in physical form in a
sealed envelope through RPAD/Speed Post only,
upto Dt:29/07/2026 up to office hrs. at The
Executive Engineer (Mech.), D’cell, Gujarat
Maritime Board, PIU-Porbandar, GMB Office
Complex,1st Floor, Nr.S.T.Bus Station, Chowpati
Road, Porbandar – 360575, mentioning the “Name
of work on the sealed Envelope”.
Submission of Documents etc. : 1) Tender fee of Rs. 1770.00(Non-refundable).
2) Earnest Money Deposit of Rs. 29900.00 in form
3) Photocopy of PAN Card.
4) GST Registration Certificate.
5) Valid Electrical Contractor License.
6) Valid Certificate of Registration as approved
contractor in E-1 Category or above issued by
R&B department, Gujarat.
7) Bank Solvency of Rs. 5,06,700.00 or above from
any Nationalized/Schedule bank for tendering
purpose, issued on or after 1st January
8) PQ Forms – I to VI.
Note: - No condition will be acceptable in letter of
Bidders shall submit their bid/offer in electronic
format on website, after digitally signing the same.
Bid offer, which are not digitally signed will not be
Remarks : accepted.
No price-bid offer in physical form will be accepted
and any such offer, if received by GMB will be
outright rejected.
Contact Information : Email ID : [email protected]
Dt: 30/07/2026 from 12.00 Hrs. Onwards…
In the office The Executive Engineer (Mech.)D’cell,
Online bid Opening Date :
PIU-Porbandar, Gujarat Maritime Board, GMB Office
Complex,1st Floor, Nr. S.T.Bus Station, Chowpati
Road, Porbandar –
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Executive Engineer (Mech.),D’cell
Officer Inviting Bids :
Gujarat Maritime Board, PIU-Porbandar.
Superintending Engineer (Mech.),
Bid Opening Authority :
Gujarat Maritime Board, PPU-Gandhinagar-382010.
Superintending Engineer (Mech.),
5th Floor, Sagar Bhavan, Sector 10A, CHH Road
Gujarat Meritime Board,
PPU-Gandhinagar -382010
General Terms and Conditions:-
(1) Bidders can download the tender document free of cost from the website.
(2) Bidders have to submit Price bid in Electronic form only on n-procure website till
the Last Date & time for submission.
(3) Offers in physical form will not be accepted in any case.
(4) Free vendor training camp will be organized every Saturday between 4.00 to
P.M. at (n) code solutions-A Division of GNFC Ltd. Bidders are requisite take benefit
(5) Government of Gujarat & Governor Shall be Rear as GUJARAT MARITIME BOARD
&Vice Chairman and Chief Executive Officer-GMB, respectively.
Bidders who wish to participate in online tenders will have to procure / should have
legally valid Digital Certificate as per Information Technology Act-2000 using it they can
sign their electronic bids. Bidders can procure the same from any of license certifying
Authority of India or can contract (n) code solutions- A division GNFC Ltd, who are
licensed Certifying Authority by Govt. of India.
All bids should be digitally signed, for details regarding digital signature certificate
related training involved the below mentioned address should be contacted:
(n) Code Solutions
A division of GNFC
301, GNFC Info tower, Bodakdev,
Ahmedabad – 380 054 (India)
E-mail: [email protected], Web-site: www.nprocure.com
Toll Free: 1800-233-1010(Ext. 321)
Other Terms & Conditions as per detailed tender documents.
Signature of Executive Engineer (M),D’cell
Contractor. GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
GENERAL INFORMATION
The Gujarat Maritime Board (GMB) was set up on 4thApril 1982 under Gujarat
Maritime Board Act, 1981 (Gujarat Act No. 30) in order to develop, administer,
operate and regulate the state’s port sector. In 1998/99 GMB constructed the
building of its Head Office as a cornerstone for controlling and coordinating various
port activities.
On behalf of the Gujarat Maritime Board, the Executive Engineer (Mech.), D’cell,
GMB, PIU-Porbandar invites tenders from reputed agencies having sound
background and experience in Electrical work for “Maintenance and Repairing of
High Mast lighting towers of various area at GMB Porbandar Port for 24 months.”
2.2 Site Information
The contractor has to carry out the said work at Porbandar Port. Contractor is
strongly advised to visit the site and acquainted himself with the site condition its
surrounding etc. in view of performing the scope of tender.
GMB is in a plan to Maintenance and Repairing of High Mast lighting towers of
various area at GMB Porbandar Port for 24 months.
Latitude : 21.63610 N
Longitude : 69.60800 E
The port is well connected with the State Highway and broad-gauge railway line.
Nearest international airport is Rajkot.
Contractor is advised to visit the site and acquainted himself with the site condition
it surrounding etc. in view of performing the scope of tender.
2.3 Definitions:
In the contract as hereinafter defined, the following words and expressions shall
have the meaning hereby assigned to them except where the context otherwise
⮚ The Expression “Board” means Gujarat Maritime Board constituted under the
Gujarat Maritime Board Act
⮚ The expression “Work” where used in this document shall, unless there be
something in the subject or contest repugnant to such construction, be
constructed to mean the work or the work contracted and to be executed under
or in virtue of the contract, whether temporary or permanent and whether
originally or altered, substituted or additional. It shall include all extra or excess
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
works and variations and be subject to all commissions ordered in accordance
with these conditions.
⮚ “Site” means the land, jetty, dry-dock and/or other places on, stacking area,
under, in or through which works are to be executed or carried out and services
to be rendered any other lands or places provided by Gujarat Maritime Board
for the purpose of the contract together with such other places that may be
specifically designated in the contract as forming part of the site.
⮚ “Contract “means the notice inviting tenders, general conditions of contract,
terms and conditions of contract, specifications, price bid, tender and contract
agreement made at the time of awarding the work and also the mutual
agreement made jointly during contract period.
⮚ "Contract Price" means the sum named in the tender subject to such additions
thereto or deductions there from during negotiation as may be under the
provisions hereinafter contained.
⮚ “Contract Period” means total time limit allowed for this work from the date of
issue of work order by the Executive Engineer (Mech.), D’cell, GMB, PIU
Porbandar for this tendered work.
⮚ “Bidder”/” Contractor”/” Agency” shall mean the person or persons, firm,
company or corporation who’s tender has been accepted by the GMB and
includes Bidder’s/ Contractor’s personal representative, successors and
permitted assignees or joint Bidders who shall be deemed to be bound jointly
and separately.
⮚ “Requirement” means total quantity or numbers of system required as per
tender requirement and accordingly order has placed by the Executive
Engineer (Mech.) D’cell, GMB, PIU Porbandar or his authorized representative.
The requirement may be increased or decreased as mentioned in the tender
document which approved by the Competent authority.
⮚ “Engineer-in-charge” (EIC) shall mean the Executive Engineer (Mech.), D’cell,
GMB, PIU-Porbandar or his authorized representative i.e. the Deputy Executive
Engineer (Elect.), - Porbandar, who shall exercise only such authority on behalf
of the Executive Engineer (Mech.) as may have been delegated to him from time
to time by the Executive Engineer (Mech.) and powers delegated to him by the
Government/GMB Rules.
⮚ “Approved” means approval given in writing including verbal approval for
which subsequent written confirmation is given and “approval” means approval
in writing including as aforesaid.
⮚ “Competent authority” Officer or officers of the Gujarat Maritime Board
competent to exercise the powers conferred upon him/them by the
GMB/Government.
⮚ “Drawings” means the drawings referred to in the specifications and attached
with the agreement and any modifications of such drawings approved in
writing by the classification society / EIC or such other drawings as may, from
time to time be furnished or approved in writing by the EIC.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
2.4 Abbreviations:
GMB / Board - Gujarat Maritime Board.
EIC - Engineer-In-Charge.
BOQ - Bill of Quantities.
BIS - Bureau of Indian Standard.
SE (Mech) - Superintending Engineer (Mechanical)
XEN - Executive Engineer (Mech.),
DEE (Elect) - Deputy Executive Engineer (Elect)
GoI - Government of India
GoG - Government of Gujarat
IRS - Indian Register of Shipping
NIT - Notice Inviting Tender
Signature of Executive Engineer (M),D’cell
Contractor. GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
INSTRUCTION TO BIDDER
On behalf of the Gujarat Maritime Board, the Executive Engineer (Mech.), PIU, GMB-
Porbandar invites tenders from reputed agencies having sound background and
experience in Electrical repairing work .
3.1 BID SUBMISSION:
a) The bid should be uploaded (submitted) through the official web site
www.tender.nprocure.com“As per NIT”.
b) The physical documents shall be submitted through RPAD/Speed Post only “As
per NIT”. Beyond the last date physical submission will not be accepted/
considered in any case and it will be returned back to the bidder. The envelope
must be super-scribed with name of work. GMB is not responsible for the tender
process, if on the cover name of tender work is not mentioned.
c) The Board does not assume any responsibility for the supporting tender
documents being torn/ damaged during the postal transit. It is the responsibility
of the Bidder to see that the supporting tender documents reach this office
before due date as fixed and notified in the tender notice for the purpose of
receipt of the tender.
3.2 TENDER FEE (NON-REFUNDABLE):
Tender Document can be download from GMB website www.tender.nprocure.com
and the tenderer have to pay tender fee in form of Demand Draft (DD) “As per NIT".
Scanned copy of the same must be uploaded online as well as physical submission
Tender without Tender fees, will be rejected outright.
3.3 EARNEST MONEY DEPOSIT (EMD) :
a) The Bidder shall submit Earnest Money “As per NIT” in form of Fixed Deposit
Receipt (FDR) with the tender, failing which the tender will not be considered.
b) The Earnest Money shall be submitted in the form of FDR of any scheduled/
nationalized bank as “Mentioned in NIT”. Cheque/D.D. will not be accepted
towards the Earnest Money Deposit.
c) The Earnest Money deposited by the unsuccessful Bidders will be refunded after
the finalization of tender. E.M.D. shall not bear any interest.
d) The Earnest Money deposited by the successful Bidder will be refunded on
receipt of Security Deposit and Performance Security.
e) If any party backs out after GMB has accepted his bid, it will be considered
default and, in such case, necessary action against bidder will be taken by GMB
i. Forfeiting of EMD
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
ii. Black listing the agency for three years, etc.
3.4 SECURITY DEPOSIT (SD):
The successful Bidder has to furnish a Security Deposit (SD) by FDR with the
Gujarat Maritime Board.
a) The successful Bidder will be required to furnish a Security Deposit (SD) of sum
of “10% of the Contract value + Applicable GST”, in the form of Fixed Deposit
Receipt (FDR) with the Gujarat Maritime Board having validity of 26 months in
favour of The Executive Engineer (M), PIU, Porbandar.
b) If the security deposit is not furnished within 15 days on issuing acceptance
letter or such extended period as may be permitted by the Executive Engineer
(Mech.), GMB, PIU Porbandar in writing, the Earnest Money deposit is liable to
be forfeited and the tender will be considered as cancelled. The board shall take
penal action up to black listing the agency for period of 03 years.
c) In the event of the Bidder, after the issue of the Acceptance Letter (AL) by the
GMB, fails/refuse to execute the agreement as hereinafter provided, the Bidder
shall be deemed to have abandoned the contract and such an act shall amount to
be construed as wilful breach of contract. In such case the Board shall have full
right to claim damages incurred in addition to the forfeiture of earnest money
d) The GMB may at their option forfeit the Security deposit, if the TPI fails to affect
perform the services or observe the conditions of contract. The Board will also
be at liberty to deduct any sum that may be due to the GMB from the Security
Deposit or from any sums of money due or that may become due under any
other contract from the bidder. This is without prejudice to the rights of the
Board under the terms of the contract.
e) The said Security deposit shall not in any way be construed as a limitation of the
Contractor’s responsibility or liability pertaining to his obligations and/or
guarantees under the contract and shall be without prejudice and in addition to
any other remedies available to the Board in terms of the contract and/or the
laws of the land.
f) The security deposit will be released only on satisfactory completion of scope of
work as required and as counterploted in the contract.
3.5 TIME SCHEDULE:
The time allowed for the Completion of the work “Maintenance and Repairing of
High Mast lighting towers of various area at GMB Porbandar Port for 24 months.” is
considered as 24 (Twenty Four) Month from the date of start/commencement.
3.6 RIGHT OF THE BOARD TO ACCEPT OR REJECT THE TENDER:
a) The Board does not bind itself to accept the lowest tender and reserves the right
to reject any or all tenders received without assigning any reason, whatsoever.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
b) Tenders in which any of the particulars and prescribed information is
inadequate or incomplete in any respect and/or the prescribed conditions are
not fulfilled are liable to be rejected.
c) The Gujarat Maritime Board reserves the right to drop the entire tendering
process without assigning any reasons thereof.
d) The Gujarat Maritime Board reserves the right to reject any bidder on the basis
of past experience OR previous history of bidder under any contract of GMB.
3.7 PRE-CUM TECHNICAL QUALIFICATION:
The bidder’s qualification shall be decided on the basis of information submitted in
the prescribed Annexures & qualification criteria mentioned in this tender
document i.e. experience, financial position, etc. as well as other documents
mentioned in NIT and hence all bidders are requested to fill the information strictly
correct in prescribed Performa only with full knowledge and supporting documents
otherwise they will be disqualified for the work.
The information for financial data and project costs by the bidder should be
submitted in Indian Rupees only.
The competent authority of the Gujarat Maritime Board shall evaluate the pre-
qualification documents.
3.8 MINIMUM QUALIFICATION CRITERIA AND EVALUATION PROCEDURE :
PQ cum technical bid will be evaluated on the basis of documents submitted as per
NIT and following main criteria as per details provided by the bidders in requisite
Performa i.e. Annexures, along with prescribed application form given in this bid,
without which tender/application will not be considered for evaluation and
opening of price bid. Bidders who fulfil the minimum criteria will be qualified for
opening of price bid.
Main criteria of evaluation are as following:
A. General Criteria: Required documents as per NIT.
B. Financial Criteria:
Solvency Certificate: Bank Solvency of Rs. 5,06,700.00 or above from any
Nationalized/Schedule bank for tendering purpose, issued on or after 1st
C. Experience Criteria:
Work Completion certificate for similar work, which shall be completed during
the last 05 financial years, w.e.f 01.04.2021 whose costing/value/amount should
not less than Rs. 10,13,500.00.
*Similar work means: experience of successfully completion of any
electrical work. During last 05 financial years.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
3.9 BID OPENING:
a) The On-line tender for Pre-Qualification cum Technical bid shall be opened “As
b) The Technical bid shall be opened online of those Bidders who are pre-qualified.
The date and time of opening of the Technical Bid will be notified to the
qualified Bidders in advance of opening.
c) During the process of Bid evaluation GMB may call the bidders for discussion
/clarification and also can ask for requisite support documents.
d) The Price bid shall be opened online for those Bidders who are pre-qualified and
technically qualified.
e) Tenders submitted by Bidders shall remain valid for acceptance for a period of
120 days from the date of opening of the price bid. The Bidder will not be
allowed during the declared period of validity to revoke or cancel his tender or
to vary any term thereof.
f) If any Bidder withdraws his tender before the date of validity as declared, the
earnest money deposited by the Bidder, shall be outright forfeited. There shall
be considered as breach of contract and action against bidder shall be taken
according to norms.
g) The work will be awarded to the lowest techno-commercial offer after approval
obtained from the competent authority.
h) Only the authorized representatives of the bidders will be allowed to be present
during bid openings.
3.10 COLLECTION OF DATA - BIDDER'S RESPONSIBILITY:
The Bidder shall visit the site and acquaint himself fully with the site and local
conditions and no claims whatsoever will be entertained on the plea of ignorance of
difficulties for execution of the work.
Before submitting the tender, the Bidder shall be deemed to have clearly
understood and satisfied himself regarding the work and services, all conditions
liable to be encountered during the execution thereof and that prices, rates and/or
compensation quoted in the offer are adequate and all-inclusive with respect to all
factors, circumstances and conditions likely to be incidental, both direct and
indirect, to the work and services
Contractor is strongly advised to visit the site and acquainted himself with the site
condition its surrounding etc. in view of performing the “Scope of Work”.
In general, Collection of DATA is Bidders responsibility.
3.11 ADDENDA / CORRIGENDA:
The Executive Engineer (Mech.), GMB, PIU Porbandar shall have the right to revise
or to amend the contract documents prior to the date of receipt and opening of the
tender aforesaid such revision or amendments or extensions, if any, shall be
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
communicated to all concerned in the form of a letter or by notice in the press, as
may be considered necessary.
Addenda/Corrigenda to the tender documents may be published by the Executive
Engineer (Mech.), D’cell, GMB, PIU Porbandar prior to the date of opening of the
tenders, to clarify or reflect modifications in the contract terms and conditions. Any
Addendum/ Corrigendum will become part of Tender document.
3.12 AMBIGUITY:
In case of there be any ambiguity or doubt as to the meaning of any of the tender
clauses/conditions or, if any further information is required, the matter should
immediately be referred to The Executive Engineer (Mech.), D’cell, Gujarat Maritime
Board, PIU Porbandar in writing, whose interpretation shall be final and binding to
the contractor.
3.13 TERMINATION
Gujarat Maritime Board shall be entitled to terminate this contract at no cost due to:
a) In the event bidder is adjudicated or found bankrupt of insolvent or any order is
made or resolution passed for the winding up, liquidation of dissolution of
b) This CONTRACT shall be deemed to have been automatically terminated on the
completion of guarantee/defect liability period.
c) If, GMB considers that the performance of the contractor is unsatisfactory or, not
up to the expected standard, the GMB shall notify the contractor in writing and
specify in detail the cause of such dissatisfaction. The GMB shall have right to
terminate this CONTRACT by giving 30 days’ notice in writing to the contractor,
if, contractor fails to comply with the requisitions contained in the said written
notice issued by the GMB.
d) If, contractor abandons this Contract or if he fails to perform or observe any of
the obligations OR its part to be performed and observed hereunder and refuses
to take steps to remedy the same within 7 (seven) days of written notice from
GMB Or for any other reason by giving 10 days written notice, stating the
reasons for termination.
e) Termination of this Contract shall be without prejudice to any rights or
remedies accrued to either Party prior to such termination.
f) No further payment shall become due to the contractor in respect of any period
after termination of this Contract with the exception only on any payment
previously accrued and due for payment to contactor for satisfactory service
under the terms of this Contract.
3.14 PERMITS, LAWS AND REGULATIONS
The Contractor shall carry out the work bound by all applicable laws of Indian
Electricity Act& Gujarat Maritime Board (GMB) and hereby undertakes to comply
and to ensure compliance with all laws, ordinances, rules, regulations, bye-laws,
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
decrees and orders whether of GMB/GOG/GOI or other authority for Obtaining
Contractor shall be responsible for obtaining and maintaining all licenses, permits,
clearances, certifications and authorizations necessary for the performance of his
obligation under this Contract at his own cost.
3.15 SAFETY& INSURANCE
The Contractor shall at his own expense arrange for all the safety provisions
normally called for by the nature of on-shore electrical asset repairing work and as
ordered by the competent Authority/EIC OR his authorized Representative in
respect of all personnel directly or indirectly employed for this contract.
The contractor shall be responsible to arrange insurance of all labourers, skilled
and unskilled, workers, supervisors, etc. employed by him for this work, as per
labour regulation of the State at his own cost & there will be no liability comes on
GMB in case of any accident/loss of life or goods during this entire contract.
The Contractor shall be responsible for the safety of their Labours, Supervisor, own
equipment/material during this Contract. The Contractor shall also take such
additional precautions as may be indicated from time to time by the EIC or his
authorized Representative with a view to prevent any losses like theft, fire hazards,
act of god, etc.
Without limiting his obligation and responsibilities under various clauses &
conditions in this contract, the contractor must insure “Workman Compensation
Policy with Medical Extension” for all labourers, skilled and unskilled, workers,
supervisors, etc. deployed for said work. The cost of tender includes all medical
compensation that is to be extended to the workers employed by the contractor in
case of any sort of medical requirement that may arise to the workers and GMB
would not be liable for the same.
Any accident/death of person/theft occurs during execution of this work, the GMB
has no liability for the same. It will be solely contractor’s responsibility.
3.16 LAWS GOVERNING THE CONTRACT
This Contract shall be subjected to the laws and regulation governed by the GMB &
Government of Gujarat that may be in force during the Contractual period.
3.17 JURISDICTION:
The award of contract is subject to the Porbandar PIU (Gujarat State) jurisdiction.
3.18 SIGNING THE CONTRACT:
The successful Bidder shall be required to execute an Agreement on stamp paper of
the required value within 15 days from the date of issue of the notice of Letter of
Intent with submission of Security Deposit as per above stated clause. In the event
of failure on the part of the successful Bidder to execute the agreement within the
above stipulated period, or the period agreed by the GMB, the Earnest Money
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
deposited by him will be forfeited and apart from that the GMB being in such
circumstances entitled to treat the successful Bidder as in breach of contract and
proceed accordingly.
3.19 INSTRUCTIONS TO BIDDERS TO FORM PART OF THE AGREEMENT :
All these instructions, conditions, special conditions, if any, Technical specifications
contained in the tender document and any correspondence related to this Contract
shall form part of the agreement.
1) Letter of Application shall be submitted in proper format. Incomplete offers shall
2) The bidder shall satisfy himself with regard to the nature of work to be carried
out, its scope, the conditions of the contract, etc. included in the bid document.
3) The cost associated with the preparation and submission of bid shall be borne by
the bidder and GMB shall in no case be responsible or liable for such costs.
4) The language for submission of bid should be in English.
5) The enclosed schedules should be filled in completely and all questions should be
answered. If any particular query is not relevant, it should be stated as "NOT
6) Financial Data, Projects Costs, value of work etc. should be given in Indian rupees
7) For any clarification, for site visit and information regarding relevant data will be
available at office of The Executive Engineer (Mech.) ,PIU, Gujarat Maritime
Board, GMB Office Complex, Nr.S.T.Bus Station, Chowpati Road, Porbandar –
8) If a proprietary firm makes the application, it shall be signed by the proprietor
above his full name and the full name of his firm with its current address.
9) If the application is made by a firm in partnership, it shall be signed by all the
partners of the firm, above their full names and current addresses or by a partner
holding the power of attorney of the firm by signing of the application in which
case a certified copy of the power of attorney shall accompany the application A
certified copy of the partnership dead, current address of the firm and the full
names, and current of all the partners of the firm shall also accompany the
10) If limited company or a limited corporation makes the application, a duly
authorized person holding the power of attorney for signing the application in
which case a certified copy of the power of attorney shall accompany the
application shall sign it. Such limited company or Corporation will be required to
furnish satisfactory evidence of its existence before the contract is awarded.
11) Information furnished must be sufficient to show that the applicant is a capable
in all respects to successfully complete the envisaged contract works strictly on
the basis of the applicant, having already carried out satisfactorily works of
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
similar size, nature and complexity.
12) While submitting the schedules, duly filled in, the applicant shall enclose the
latest copies of brochures and technical documentation giving more information
about the firm and all the members.
13) The Gujarat Maritime Board reserves the right to reject any or all bids without
assigning any reasons and the Gujarat Maritime Board decision shall be final and
14) No costs incurred by bidder in making this offer like providing clarification or
attending discussions, conferences or site visits will be reimbursed by the
Gujarat Maritime Board.
15) Bidder shall enclose list of similar nature of jobs under taken during last five
years. Copies of certificates/documents in support shall be attached.
16) Details of the litigation, if any, during last three years shall be furnished.
17) During the tenure of profession, details of awards, if any and such additional
information shall be furnished.
18) The PQ cum Technical Bid should contain all other documents except the price
bid, like specifications, general conditions, etc. and Bidder’s letter regarding
deviations to the general terms & conditions, if any. It should be very clearly
understood that the PQ & Technical Bid should be restricted to only "Technical
Matters” and the tender quoted price must not be discussed in the PQ cum
Technical Bid. Conditions in "PQ cum Technical Bid" should be specific so as to
evaluate them correctly and to arrive at the correct financial effect.
19) The bidders will understand clearly that the rates quoted are for complete works
and include all costs due to POL, labour, plants & equipment’s, transportation,
supervision of GMB officials including lodging & boarding, various other services
like water, power, materials and all matters and things necessary for satisfactory
completion of the work and no claim for additional payment beyond the
offered/accepted rates will be entertained and the bidder will not be entitle
subsequently to make any claim on the ground of misrepresentations or on the
ground that he was supplied with wrong information given by any person
(whether the person is the employee of GMB or not). Any failure on the part of
Bidder to obtain all necessary and correct information for the purposes of filling
his Bid and prices / rates therein shall not relieve him from any risks or liabilities
arising out of consequence upon the submission of the Bid.
20) The price bid should contain only rate and amount of the work. Any condition in
the price bid shall be liable for rejection of offer of that bidder.
21) No contract will be awarded except to the qualified and responsible bidders
capable of performing the classes of work contemplate.
22) No Bid shall be deemed fit for consideration unless, it is completed in all respect.
23) No conditional tender will be accepted.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
24) No change or supplementary information (unless & until asked by GMB) in
respect of the offer shall be accepted after its submission. The bidder shall not
make any alteration in the bid documents.
25) The successful bidder shall have to enter in to an agreement with the Gujarat
Maritime Board in the prescribed format. The cost of stamp papers etc. for the
agreement shall be borne by the bidder.
26) All document submitted will be the property of GMB and GMB reserves the right
to use these documents without any prejudice.
27) Contract period shall be extendable up to 6 Month after completion of contract period (If
required) subject to approval from concern competent authority of GMB.
Signature of Executive Engineer (M),D’cell
Contractor. GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
P.Q. Forms List
QUALIFICATION DATA SHEET TO BE FILLED UP BY THE BIDDER.
The qualification questionnaire contains the following forms:
P.Q. FORM-I : Letter of Application
P.Q. FORM -II : Document Fees & EMD Details
P.Q. FORM III : General Details
P.Q. FORM–IV : Details of experience- A
P.Q. FORM -V : History of Litigation
P.Q. FORM -VI : Minimum wage undertaking
Executive Engineer (M),D’cell
GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
LETTER OF APPLICATION
The Executive Engineer (Mech.) D’cell,
Gujarat Maritime Board,
1st Floor, GMB Office Complex,
Nr.S.T.Bus Station,
PIU Porbandar –
Having examined the Bid documents including scope of works and time frame of the
aforesaid work, I/we hereby submit all necessary information and relevant documents
The application is made by us on behalf of M/s. (Bidder) duly authorized to submit the
The necessary evidence admissible in law in respects of authority assigned to us on
behalf of the firms for applying and for completion of the contract document is attached
It is certified that the information furnished in this document is correct & authentic.
I/We confirm that we have not been barred & blacklisted by any Government
organization OR Major Port Trust OR Minor Port Board in India for any such works in
last Three Years.
I/We shall make available to the GMB any additional information it may find necessary
or require for this tender purpose.
I/We promise that we will abide by all rules & regulation as laid down by G.M.B. time to
time for execution of any contract as may arise during this contract period
I/We have examined and have no reservation to these tender documents with any
addendum issued by GMB.
I/We undersigned accept that GMB reserves the rights to reject any or all tender for this
work without assigning any reason.
Signature of the applicant
(Name in bracket)
Encl: As per NIT
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Document Fees & EMD Details
Document Fees Detail
D.D./Banker’s cheque No.& date
Bank Name & Address
Bank Name & Address
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
GENERAL INFORMATION
All individual firms applying for pre-qualification must complete the information in
1. Name of firm:
2. Head office address:
3. Local office address (if any):
4. Telephone: Contact:
5. Facsimile: E-Mail & Website:
6. Place of incorporation / registration: Year of incorporation / registration:
9. Main lines of business:
10. Details of office set up with Key staff
name, designation, & other detail
11. Other information ( if any)
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Bidders should provide information showing their experience for similar works as
mentioned in the table below.
Experience of successfully completed works during last 05 financial years i.e. from 01-
04-2021 to last date of online submission of bid for the proposed work as per relevant
clause of PQ bid shall be taken in to consideration.
A. Experience in Contracts of works completed:
Sr. Name Owner Address Contact Value of Detail Order Successfully
No of / with phone person name contract (copy Completion
work Client / Fax No. & Mobile no. Attached) Certificate of
1. The above information should be filled in the table and supporting
documents in soft copies should be submitted inclusive of work order
and Completion certificate etc. in e-tender.
2. If Bidder will submit Government experience work then they should
submit Form-3A for that particular work duly signed by the authority for
3. If bidder will submit Non-Government work experience cert OR
4. Subletting work experience cert then they have to furnish following
- Self-attested copy of Work order, completion certificate.
- Self-attested copy of letter of permission/approval given by the
employer for subletting the work.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
History of Black Listing and Barring / Litigation
Non judicial Stamp paper of Rs.300/- or Above
We here by undertakes and confirms that our agency
M/s.__________________(Bidder)________________ have been neither black listed nor banned
for tender participation or execution of the works by any Govt./PSU Authority in last
Yours faithfully,
(Name of Authorized signatory)
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Bidder under taking (on Rs. 300 Non Judicial stamp paper)
We undertake that we shall make payment to the Wiremen & electrical helper as
mentioned on Sr. 01 & 02 as required in this work, a minimum prevailing wages
prescribed by the Government, irrespective of, whatever to be quoted amount by our
agency in Price Bid.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Roads & Building Department
Government of Gujarat
Division:_ “Mechanical Division – PIU Porbandar___
ELECTRICAL WORK
Maintenance and Repairing of High Mast lighting towers of various area at
Name of work :- GMB Porbandar Port for 24 months.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Tender Booklet contains 55 Pages
C Instructions to tenderers
Form of tender for electrical work (induplicate) with schedule of
E General Conditions
F Data Sheet for E-tendering
G General Condition of contract for electrical works
J Specification for electric works
K List of approved Electrical Products
(i) Amount put to tender Rs.
(ii) Tender fee Rs. As per NIT & Tender
(iii) Earnest Money Rs……………………….. Documents
(iv) Security Deposit Rs…………………… Performance Bond Rs….………....
Last Date of Receipt of Tenders by R.P.A.D. Dt. ____/____/_________
Downloading of tender documents From date ____/____/________
Start End Date Up to date ____/____/________ Till _____ : _____ hrs.
Divisional Account/D.A.O.
Executive Engineer (Mech.)
(Only in case of Tender above Ten lakhs)
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
2. Estimated Cost … Rs. ………………………………………….………
3. Earnest Money 1% Rs. …………………………………………………
4. Validity period of tender offered …
(90/120*) days from the stipulated date of
receiving tender Tender
if tenders are invited off
Documentsshall be allowed
line and no modification
after handing over the to postal authorities.
In case of on line tenders, the validity
period shall be counted from the date of
opening on line tenders, in case of single
cover system tenders and from the date of
opening technical bid in case of two cover
5. Security Deposit -
(i) In the form of small
Savings or Narmada Bonds or FDR of
(of minimum one year time limit) 2.5% Rs. ……………………………………………….
(ii) To be deducted from bills (Security Deposit) 2.5% Rs. ……………………………………………….
(Deduction at rate of 5% from each Running
As per NIT &Tender Documents
Bill shall be made till stipulated maximum
amount is recovered).
(iii) Performance bond of schedule Bank 5% Rs. ……………………………………………….
(In case of tender estimating Rs. 30 lacs or
6. Time limit … As per NIT & Tender Documents
* Strike out whichever is not applicable
* Vide R & GD G. R. No. TNC – 1088 – 1B/1 (13) / C dated 4-5-1993 & revised vide G.R. No. TNC-
(Part 2)-C dated 20-11-13
Deposit furnished in the form of interest bearing document as per Item .4 (i) can further be
extended for renewal if so desired and communicated by the Contractor in writing before one month
from the date expiry date. Similarly Security Deposit deducted as the Item No.4 (ii) can also be converted
into interest bearing fixed term securities of schedule and Nationalised Bank. If so desired and
communicated by the contractor in writing. The security Deposit will be released against Bank Guarantee
as provided in Clause 3.8 of General Condition of Contract.
Should this tender be accepted, I/We hereby agree to abide by and fulfil all the terms and
Provisions of the conditions of the contract annexed here to so far as applicable and in default thereof to
forfeit and pay to Government in office the sums of money mentioned in the said conditions.
(Receipt No. ___________ dated _______________ from the Government Treasury or Sub-Treasury at _____________
in respect of sum Rs.* _________________________________ is forwarded herewith representing the earnest
money + (a) the full of value of which is to be absolutely forfeited to Government should I/We not deposit
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
the full amount of security deposit specified in the above memorandum in accordance with Clause-I of the
said conditions, otherwise the said sum of above Rs. ______________________________shall be refunded).
*Digital signature of contractor
**Signature of the contractor
(Witness)*** (At the time of execution of contract document)
*Digital signature of contractor before submission of tender.
**Signature of contractor at the time of execution of contract document.
***Signature of witness to Contractor’s signature at the time of execution of Contract document
The above tender is hereby accepted by me on behalf of the Government of Gujarat
Signature of the Executive Engineer (Mech.),
Note: The normal rate of Security Deposit is 5 percent for works upto Rs. 30 lacs and further 5 % as
performance bond for works above Rs. 30 lacs. Out of 5 % of Security Deposit 50 % is Payable at the time
of acceptance of tender and the balance by deduction from progress bills.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Instructions to Tenderers
1. Tenders, sealed and marked on the outside for “Will be received by undersigned
Up to the day of 20 In the form of “Tender for Electrical Works” here to annexed
2. The tendered shall state precisely in his tender the type and description of the materials,
plant and stores he proposes to use for the work. If he proposes to use materials, plant or
stores of other than Indian manufacture he must clearly state this in his tender, together with
the name, manufacturer and of the country of origin of the same.
3. The office with whom cash deposits are to be made, or to whom securities are to be endorsed
accordance with clause 3 of General Condition of Contract for Electrical Works, is the Ex
4. The work must be carried out in accordance with the General Condition of Contract for
Electrical Works and the general specification for electrical works in Government building.
5. Plans may be seen, in the office of the Executive Engr._____________________________________________
6. The Governor of Gujarat does no undertake to accept the lowest or any tender.
Executive Engineer (M),D’cell
GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Form of Tender for Electrical Works
1. I/We do hereby tender to execute the whole of the work Described in the accompanying
tender for the several sums, and in the case of measured works, at the several rates, set forth
in the tender hereto attached and signed by me/us and should this tender be accepted. I/We
further undertake to complete the work within the time stated below reckoned form the date
of acceptance of tender, namely.
2. I/We do agree and bind myself/ourselves to abide by and fulfil the general conditions of
contract and the Special Conditions of Contract annexed to the Specification or in default
thereof to pay to the purchaser, as reasonable compensation for such breach of such
conditions, the sums of money mentioned in the said condition.
3. I/We further agree to make good at my/our own expense all defect in the installation which
appear within twelve months from the date bringing the installation into beneficial use when
such defects are due to defective workmanship or material executed or supplied by me/us.
4. I/We hereby declare that my/our near relative are not working in this Division or in its sub-
division as an Executive Engineer (Mech.), Deputy Executive Engineer, Additional Assistant
Engineer, Overseer, Divisional Accountant, Store Keeper, Manager of Atithi/Vishram Gruha
and in the circle as a Superintending Engineer in additional for Panchayat Works not
working nor having posting as Chairman of P.W. Committee or as incumbent in Jilla
Panchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer (M),D’cell
GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Form of Tender for Electrical Works
1. I/We do hereby tender to execute the whole of the work Described in the accompanying
tender for the several sums, and in the case of measured works, at the several rates, set forth
in the tender hereto attached and signed by me/us and should this tender be accepted. I/We
further undertake to complete the work within the time stated below reckoned form the date
of acceptance of tender, namely.
2. I/We do agree and bind myself/ourselves to abide by and fulfil the general conditions of
contract and the Special Conditions of Contract annexed to the Specification or in default
thereof to pay to the purchaser, as reasonable compensation for such breach of such
conditions, the sums of money mentioned in the said condition.
3. I/We further agree to make good at my/our own expense all defect in the installation which
appear within twelve months from the date bringing the installation into beneficial use when
such defects are due to defective workmanship or material executed or supplied by me/us.
4. I/We hereby declare that my/our near relative are not working in this Division or in its sub-
division as an Executive Engineer (Mech.), Deputy Executive Engineer, Additional Assistant
Engineer, Overseer, Divisional Accountant, Store Keeper, Manager of Atithi/Vishram Gruha
and in the circle as a Superintending Engineer in additional for Panchayat Works not
working nor having posting as Chairman of P.W. Committee or as incumbent in Jilla
Panchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer (M),D’cell
GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
GENERAL CONDITIONS
1. The work of the Electrical Installation shall be carried out as per I.S Specifications I.S. 732-Code Part
I, II & III - 1982-82 of practice of Electrical wiring and fitting in building.
For Hospitals I.S. 7732 of
For Educational Installation I.S. 108941-1984
For Aluminium Conductor I.S. 398-1984 Part III
2. The fitting should be fixed with mild steed hooks to be supplied and erected and duly grouted in the
cement concrete by the contractor wherever possible the decision of the EIC in respect of the
feasibility of providing such hooks in the cement concrete, shall be final and binding on the
3. The work shall have to be completed within the prescribed time limit unless the extension in the
time limit at the instance and the request of the 'contractors is granted by the authorities in which
case, the application for the extension in time limit have to be made by the contractors by registered
post before the date of expire of the schedule time limit under the agreement.
4. The amount of Rs. 1-00 for each empty wooden box of ceiling fan and 0-50 paise for each empty
wooden box of Table fan issued to the contractors for* the work as per Schedule B of the work shall
be recovered from the Contractors.
5. Materials required for the work shall be supplied to the contractor as per rates mentioned in the
Schedule 'A' attached herewith and the cost of materials will be recovered form their bills.
6. The tender documents required shall have to be filled in either in ink or by ball pen.
7. In addition to the above the tender will also be liable to be rejected outright if
(i) Any of the pages of the tender is/are removed or replaced.
(ii) In the case of "item rate" tender, the rates are not entered in ink, in figures and words and the
total of each item and grand total are not struck by the tender or in ink in the last column of
total of each item and grand total are not struck by the tender or in ink in the last column of
schedule 'B' under his signature.
(iii) All corrections, additions or pasted slips are not initialled by the tenderer,
(iv) Any erasure is made by him in the tender AND
(v) The tenderer in the case of a firm, each partner or the person holding the power of attorney
thereof does not sign or the signature is/are not attested by witness on page 8 of the tender in
the space provided for purpose.
8. A certificate of registration as approved contractor should be attached with the tender.
9. In respect of tenders from the co-operative society a solvency certificate of an amount equal to 20%
of the amount of the work put to tender plus cost of work in hand will have to be produced along
with the tender or a certificate, regarding the borrowing capacity of the society issued by the legal
Assistant, Directorate of Cottage Industries will have to be produced along with the tender.
10. The several documents forming the contract are the essential parts of the contract and requirement
occurring in one is as binding as though occurring in all, they are intended to be mutually
explanatory and complementary and to describe and provide for a complete work.
11. In the event of any discrepancy the several documents forming the contract or in any one document
the following order of procedure should apply:
(a) Dimension and quantities:
(ii) Schedule 'B' of the tender form
(iii) Specification
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
On drawing figures, dimensions unless obvious in contract will be followed in preference to sealed
(b) Description:
(i) Schedule 'B' of the tender form
(iii) Specifications
In case of defective description or an ambiguity, the Executive Engineer (Mech.) in charge should
issue further instructions directing in what manner the work is to be carried out is being
understood that the last modern practice is to be followed. The contractor should forthwith comply
with such instruction.
12. The contractor should take no advantage of any apparent error, omission in drawings or a
specifications and the Executive Engineer (Mech.) in charge should be permitted to make fulfil the
intent of the plans and specifications.
13. Controlled materials (Essentially certificate)
(i) As regards "Controlled materials, the R. & B. Dept. will help to arrange for the permits as far as
possible and hold the contractor in securing the same. All incidental charges in procuring these
materials shall be borne by the permit as far as possible by the contractor himself. Though the R.
&, B. Dept. will help to arrange for the permit as far as possible and help the contractor in
obtaining the materials, it shall not accept any responsibility for any delay or loss or account of
delay caused to the contractor while obtaining the same.
(ii) The contractor shall submit the monthly returns in the prescribed forms at to the receipts and
actual use of the controlled materials during the month to the EIC of every calendar month.
(iii) The contractor shall submit the Executive Engineer (Mech.) or his representatives to inspect the
stock of the controlled materials by him at any time whenever the Executive Engineer (Mech.) or
his representatives so desire.
14. The tender shall remain open for a period of 90/120* days. The validity period shall be counted from
the stipulated date of receiving tenders if tenders are invited off-line.
In case of online tenders the validity period shall be counted from the stipulated date of opening
online tenders in case of single cover system tenders and from date of opening technical bid in case
of two cover system tenders. (R & B.D. G.R. No. TNC-10-2013(2)-C dated 10-5-2013)
If any tenderer withdraws or makes any modifications or additions in the terms and conditions of
this tender not acceptable to the Government (Public Works Department) as above then the
Government shall without prejudice to any right remedy be at liberty to forfeit in full the said
earnest money absolutely.
15. The contractor shall employ only such labourers who shall produce a valid certificate of having been
vaccinated against small pox within a period of last three years.
16. The contractor shall provide drinking water facilities to the workers, labourers to comply with the
provisions, the engineer in charge shall give notice facility to the workers, Labourers within a period
of ten days from the date of the notice in writing, the Engineer in charge shall there upon make the
arrangement for the drinking water at the cost of the contractor.
17. The contractor shall provide the amenity of shade and shelter to the workers, labourers and their
children on Govt. work as soon as the work starts" If the contractor fails to provide shade and shelter
than the Govt. Shall provide the same at the cost of the contractor.
(Govt. Resolution PWD No. TNC-2172 (i) 76-C Dt.4-7-1973)
18. Challan for earnest money @ 1% of the estimated cost must accompany the tender. Tenderer may
pay earnest money up to Rs. 50,000 in cash or on the form of Crossed demand Draft or in case of
tenderer is member of only IEEMA DEPOSIT AT CALL receipts of Nationalized of scheduled Bank
drawn in favour if Executive Engineer (Mech.), Divisional Officer concerned. However in respect of
the works estimated to cost above Rs. 50 lacs, the amount of earnest money in excess of Rs.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Can be offered by the contractor, at his choice, in the form of Bank Guarantee of the Scheduled Bank
only. The Bank Guarantee in such cases will be furnished in the following form. In such cases also,
the amount of first Rs. 50,000 will paid in the form of cash or crossed demand drafts or fixed deposit
receipts or deposit at call receipts worth the validity period of not less than the 6 Months of the
nationalized or Scheduled Banks.
The Contractors, who have secured exemption Certificate for payment of earnest money by
depositing Lump Sum earnest money Deposit need not pay earnest money, but produce the certified
copy of the exemption certificate along with the tender.
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the
terms and conditions of tender for the work of and where as We, Bank agree
to give the tenderer a guarantee for the Earnest Money.
1. Therefore, we hereby affirm As that
NITare&Tender Documents
guarantors on behalf of the Tenderer up to total rupees
in words) Rs. (in figures)
and we undertake to pay to Executive Engineer (Mech.)s Division
Department of Government of Gujarat the (name of
Govt. previous notice of judicial or to be specified) up to his first written demand, without demur,
without delay and without the necessity of a previous notice of judicial or administrative
procedures and without the necessity to prove to the Bank the defects or shortcomings or debits
of the contractor any sum within the limit of Rs.
2. We further agree that the Guarantee herein contained, shall remain in full force and effects during
the period that would be taken for the acceptance of tender.
However, unless a demand of claim under this Guarantee is made on us in writing on or before the
(Date to be specified-will not be less than 180 days from the date of
opening the tender) we shall be discharged from all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during currency except with the previous consent of
the Executive Engineer (Mech.) Division in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitutions of the Tenderer or
Date: Signature & Seal of Guarantor
* Strike out whichever is not applicable
19. Wires of I.S.I. mark will be allowed to be used on the work.
20. The rates should be written both in words and figures inclusive of all taxes and duties.
21. The percentage additions in total amount tendered of any items is not allowed however if overall
21. The percentage additions in total amount tendered of any items is not allowed however if overall
reduction in percentage is offered the same should be stated in the prescribed clause added at the
end of, schedule ‘B’ in words and figures. If no reduction is to be made the gap should be filled in
by the word 'NIL'.
Note : As per Govt. Resol. No. CDN/1269/PAC/51-C.dt. 15/4/1978
22. Safeguards :
(a) That the percentages and the tender amount by each contractor shall actually be shown to the
other contractors who may be present at the time of opening the tenders.
(b) That a tender with any erasures and/or over writing in percentage (both in word and in figures)
shall be rejected outright.
(c) That insertions and or correction in the percentage quoted (both in words and in figures)
resulting into increase in the value of the work shall be liable to be rejected outright unless it is
authenticated by the officer opening the tender at the time of opening tender as well as the
contractors they may be present at the time of opening tender and.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
(d) That any other correction or insertions shall be authenticated by the officer opening the tender
and the intending bidders who may be present.
23. Any error in quantity or amount in Schedule 'B' showing items of works to be carried out shall be
adjusted in accordance with the following rules:
(a) In the event of a discrepancy between description in words and figures quoted by a tenderer in
the rates column, the description in words shall prevail.
(b) In the event of an error occurring in the amount column of the Schedule 'B' showing item of
works, as a result of wrong multiplication of the unit rate and quantity, the unit rate shall be
regarded as firm and multiplication shall be amended on the basis of the rate.
(c) All errors in totalling in the amount column, and in carrying forward totals shall be corrected.
(d) Any rounding off of amounts against items of in totals shall be ignored. The tendered sum so
altered shall for the purpose of tendered be substituted for the sum original tendered and
considered for acceptance.
24. Battens shall be teakwood for acceptable quality and shall be varnished before fixing in position.
25. Wooden-cup board should be polished on both the sides.
26. Whenever Government materials are issued, the contractor shall be responsible for the safe custody
and proper use of the materials.
27. Loose electric fitting connection should be done at the time of handing over possession of building to
the concerned civil or administrative department and accordingly after taking over possession of
these connection concerned Civil/Administrative department is responsible for fittings.
28. (i) Late tenders (i.e. tender received after the specified time of opening) Delayed tender (i.e. tenders
received before the time of opening but after the due date time or receipt of tenders)'and post tender
offers shall not be opened and considered at all.
29. (ii) The tenders received (by registered post after the time of date specified in the tender notice)
shall not be received by the concerned office from the postman, for which date and time may be
recorded on the cover of the tender as to when tender was refused by the Divisional Accountant or
the Divisional Head or any other person in charge.
30. GST where recoverable / payable shall be deducted from bills for payment according to rules
Prevailing at the time of payment.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Pages 7 & 8 are for E-tendering of Electrical Tender Form only
DATA SHEET FOR Electrical E-TENDERING
(A) Details of Tender Item :
Sr. Tender EMD in Period of
Name of Work fee Security of
No. Value in (Rs. _______) Completion
1 ------ As per NIT & Tender Documents ------
(B) Eligibility : Registered in ________ Class or above / Pre-qualification.
(C) Schedule of E-Tendering is fixed as under:
(i) Site Visit (If any)
From Date : __/__/____
Downloading of tender
(ii) Upto Date : __/__/____ Till __:__ hrs.
documents Start & End Date
(iii) Online submission of bid Upto Date : __/__/____ Till __:__ hrs.
(iv) Submission of EMD & Tender fee SubmissionAsinper NIT &Tender
electronic format Documents
only through online by
and other documents scanning and then the same should be sent in original to
Superintending Engineer ___________________________
Cicle_____________________ at the time of Tender Opening or
sent the same through R.P.A.D. So as to reach Executive
Engineer (Mech.), ______________________ Division
__________________ within 7 days from last date of Opening.
(v) Online Opening of Bid
90/120 Days counted from the date of opening of online
(vi) Bid Validity period
● Bidders can download the tender documents free of cost from the website. www.gmb.nprocure.com
● Bidders have to submit bid in Electronic format only on above mentioned website till the Date &
time shown above.
● Offers in physical form will not be accepted in any case.
Bidders who wish to participate in online tenders will have to procure/ should have legally valid Digital
Certificate (Class-III) as per Information Technology Act-2000 using which they can sign electronic bids.
Bidders can procure the same from any of the license certifying Authority of India or can contract (n)
code solution - a division of GNFC Ltd., who are licensed Certifying Authority by Govt. of India.
(D) (i) Bid Inviting Authority Executive Engineer (Mech.), GMB, PIU Porbandar
(ii) Bid Opening Authority Executive Engineer (Mech.), GMB, PIU Porbandar
Percentage premium or rebate in words and figures at
(E) Mode of Quoting Rate
the end of Schedule B
The list of certifying agencies are as mentioned under :
Sr. No. Name of Certifying Agency Website Address
1. (n) Code solution (G.N.F.C.) www.gnvfc.com.
2. Safecrypt www.safescrypt.com.
3 TCS www.tcs.-ca.tcs.co.in
4. MTNL www.mtnltrustline.com
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
As a result of E-tendering the information / Instructions on Pages 4 to 6 following may be read as
modified below : -
General Conditions from Page 4 to 6 are substituted for E-tendering as below :
7. In addition to the above the bid will liable to be rejected if :-
(i) The bidder proposes any alteration in the work specified or in the time allowed for carrying out the
work or any condition in the covering letter.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign the bid
8. A Certificate of registration as approved contractor should be incorporated in electronically
transmitted bid.
14. The tender for the work shall remain open for a period of 90 /120 days counted from the last
date of online submission of bid.
20. The rates should be expressed both in words and figures inclusive of all taxes and duties.
21. The bid will also be liable.
(i) The bidder proposes any alteration the work specified or in the time allowed for carrying out the
work or any condition or correction made in any code or mode of Schedule-B or Specifications.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign the bid
31. (i) The Bids shall be offered in Electronic format only on online website www.gmb.procure.com/
www.gmbports.in till the date and time shown on Page 2 supra.
31. (ii) Payment of Tender Fee and Earnest Money Deposit : "Demand Draft for E.M.D. & Tender fee
shall be submitted in electronic format only through online (by scanning) while uploading the
bid. This submission shall mean that E.M.D. & tender fee are received for purpose of opening the
bid. Accordingly offer of those shall be opened whose E.M.D. & tender Fee is received
electronically. However for the purpose of realization of D.D. bidder shall send the D.D. in original
to Superintending Engineer _____________________ Circle _______________________ at the time of tender
As per NIT &Tender Documents
opening or send the same through R.P.A.D. So as to reach Executive Engineer (Mech.)
______________________ Division _____________________ within 7 days from the last date of opening.
Penetrative action for not submitting D.D. in original to E.E. by bidder shall be initiated. D.D. for
Exemption Certificate is not necessary. However Exemption Certificate shall have to be submitted
electronically through online. If the contractor does not remit the tender fee & the earnest money
within the specified time his registration will be held in abeyance for one year & his tendering
code will be cancelled for one year.
Any documents in supporting of tender bid shall be submitted in electronic format only through
online (by scanning etc.) & hard copy will not be accepted separately." (R&B Circular No. પરચ-
૧૦૨૦૦૮-પ-સ, dated 18-1-2008 & R.&B.D.G.R. No. Parach-102008-5-C (Part file) dated 27-11-08)
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
GENERAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS IN THE BUILDING
AND COMMUNICATION DEPARTMENT
GENERAL CONDITIONS OF CONTRACT
1. Definitions of terms:
In construing the general conditions and the annexed specification the following words shall have
the meaning here assigned to them unless there is something in the his successors and assigns.
The "GOVERNOR OF GUJARAT" shall include his successors and assigns.
The "ENGINEER" shall mean the Executive Engineer (Mech.), , for the time being attached to the
Public works Department of the Gujarat State or such other officer as may be appointed by the Executive
Engineer (Mech.), to supervise the work on behalf of the Governor of Gujarat.
The "CONTRACTOR" shall mean the Tenderer whose tender, shall be accepted by the Governor of
Gujarat and shall include the tenderer's legal personal representatives of successors and assigns.
"PLANT" shall mean and include any machine any machine fixed of movable, use for the generation
or transmission of power of actuated by power.
"WORK" or "WORKS" shall mean the whole the plant and material to be provided and work to be
done executed of carried out by the contractor under the contract.
The "CONTRACT" shall mean all the documents by which the agreement by the contractor to be
provided to execute of carry out the plant work or works shall be constituted or in or by which the terms
of such agreement or any of them are contained or set forth specially as per these General conditions, any
special conditions attached to or issued with these conditions. The specification, the Drawing, the
invitation for Tenders (if any) of any other letter. notice or document upon or with reference to which the
Tender is made and the Schedule of prices (if any) furnished by the contractor with these his Tenders.
The "SPECIFICATION" shall mean the specification annexed to these General conditions and the
Schedule thereto (if any).
The "SITE" shall mean the whole of the premises, buildings and grounds in or upon which the Plant
works or works is or are to be provided, executed, erected, done or carried out.
The "DRAWINGS" shall mean the drawings issued with the specification which will ordinarily be
identified by being signed by the Engineer and any further drawings submitted by the contractor with his
tender and duly signed by him and accepted or approved by the Engineer and all other drawings supplied
or furnished by the contractor or by the Engineer in accordance with these General conditions.
The "SPECIAL CONDITIONS" shall mean the special conditions of contractor (if any) attached to
general condition.
The "SCHEDULE" shall mean the schedule or schedule attached to the specification.
2. Contractor to inform himself fully :
The contractor shall be deemed to have carefully examined the invitation for Tender (if any) the
general and any special conditions, the specification and Drawings and the Schedule of price(in any). In
case off discordance or want of agreement between or amongst the several things herein described as the
grounds or data of the contract then these conditions shall have precedence of and be held to be more
correct and binding and in like manner detailed drawings shall be held to be more correct. and binding
then general drawings and in like manner drawing made to a large scale, or for special instruction, shall
be held to be ore correct and binding than drawing made to a smaller scale, or for general instruction and
figured dimensions shall be held to be more correct than dimensions by scale but subject nevertheless in
case of doubt or dispute as to any of the matters aforesaid to the determination and decision of Engineer
as hereafter is more particularly mentioned and provided always that nothing herein contained shall limit
the powers of the Engineer herein after mentioned.
3. Security Deposit:
3.1 Security Deposit is required to be furnished by the contractor as guarantee money for performance of
the contract and observance of Contract Conditions.
3.2 The person/ persons whose tender is accepted (hereinafter called the “Contractor” which expression
shall, unless excluded by, or repugnant to the context include his Legal heirs, executors,
administrators and assignees shall pay the total amount of Security Deposit:
administrators and assignees shall pay the total amount of Security Deposit:
(a) In respect of the tender up to Rs. Thirty lacs, equal to 5 (Five) percent of the estimated cost of
the work put to tender.
(b) In respect of the work above thirty lacs, equal to 10 (Ten) percent of the estimated cost of the
work put to tender.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
3.3 In respect of the tenders up to Rs.30 lacs the contractor shall pay Five percent of Security deposit in
two parts as tender:
Part-I : 2.5 percent in the from of Narmada Bond of Sardar Sarovar Narmada Nigam Ltd. or in any
form of National Small saving (N.S.S.) Tenderor Documents
F.D.R. of any Schedule Bank to be paid within
days from the date of receipt of Acceptance letter of his offer.
Part-II : 2.5 percent in the form of cash/ Security Deposit to be deducted from Running Bills that
become payable to the contractor from time to time.
3.4 In respect of the tenders above Rs. Thirty lacs the contractor shall pay first five percent of Security
deposit as specified in part 3.3 above and for the remaining five percent, the contractor shall have to
give Performance Bond to be produced within 10 days from the date of receipt of acceptance letter of
3.5 The work-order to commence to work shall be issued only after the security deposit as per Para
and 3.4 is paid/ furnished by the tenderer. If the tenderer fail to produce the security deposit as
above the earnest money paid by him shall be forfeited and his registration shall be held in abeyance
for three years from the date of such default
3.6 All compensation, liquidated damages or other sums or money payable by the contractor to
Government under the terms of this contract shall be deducted from or recouped by the realization of
a sufficient part of his security deposit, or from the interest arising there from or performance bond
or from any sums which may due or may become due by Government to the Contractor on any
account whatsoever and whether in respect of this contract, any other contract, or otherwise. In the
event of his security deposit being reduced by reason of any such deduction or recoupment as
aforesaid, the contractor shall within ten days thereafter, make good in cash or in Government
securities transferred as aforesaid any sum or sums required to make good the shortfall in the
amount of the security deposit.
3.7 The portion of security deposit deducted at 2.5 percent from running bills as security deposit can be
converted in to interest bearing securities or F.D.R. of Schedule Bank in the Name of Executive
Engineer (Mech.) provided that the recovery of full amount of 2.5% is made and that the contractor
has expressly desired this in writing.
3.8 The full amount of Security Deposit deducted in cash from running bills will be released
proportionally as indicated in table below on production of Bank Guarantee of schedule Bank
provided the contractor produces Bank Guarantee for the period of six months beyond the stipulated
period of completion of work. Further if the time limit of contract is extended the period of Bank
Guarantee shall have to be extended for six months beyond the proposed extension of time limit and
the contractor shall have to furnish the undertaking for this alongwith the application for extension in
Table of Proportionate release of Security Deposit:
As per Tender Documents Against production of
Sr. Monetary Progress Portion of Security Deposit to be released
Bank guarantee of
Equal to the amount retained from Running
Equal to the amount
1. 25% of Tender cost Bills or 0.625% of the estimated cost of
work, whichever is less.
Equal to the amount retained from Running
Equal to the amount
2. 50% of Tender cost Bills or 1. 25% of the estimated cost of
work, whichever is less.
Equal to the amount retained from Running
Equal to the amount
3. 75% of Tender cost Bills or 1.88% of the estimated cost of
work, whichever is less.
3.9 It will have to be ensured that the ten percent amount of security deposit in any form as permissible
above is kept available with the employer till the actual date of completion of work.
3.10 Fifty percentage of the Security Deposit along with performance bond shall become refundable
within fifteen days after the final completion certificate issued a per Clause-25. All dues under this
contract or other contract. or otherwise, shall be recoverd from the aforesaid amount of fifty
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
percentage of the said security deposite and the balance shall be refunded within fifteen days after
the final certificate is issued as per clause-25. The remaining fifty percentage of the security deposit
shall be refunded after expiry of the Defect Liability period as per clause-33 after deducting there
form the amount of expenses, is any Government under this contract.(See Performance bond
below) (Modified as per R & B Circular No. TNC-10-2013-3-(Part 1)-C dated 19-11-2013 and GR. No.
TNC-10-2013-3-(Part-2)-C dated 20-11-2013)
PERFORMANCE BOND
(The date of this bond must not be prior to the date of the instrument in connection with which it is given).
Principal (Contractor)
Sum of bond (express in words and figures)
Contract No. and date of contract
KNOW ALL MEN BY THESE PRESENTS, THAT WE, THE PRINCIPALS AND SURETY above named are held
and firmly bound up to the______________________ hereinafter called the Employer in the amount stated for
payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators and
successors jointly and severally, firmly by these presents subject to the provisions of which the aforesaid
Contractor on demand and without demand on a claim being made by the Employer.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the principals have entered in to a contract
with the Employer numbered and dates as shown above and hereto attached for the execution of work
NOWTHEREFORE, if the Principal shall well and truly perform and fulfil all the undertakings, covenants, terms,
conditions and agreements of said contact during the original terms of the said Contract and any extensions
thereof that may be granted by the Employer with or without notice to the surety and during the life or any
guarantee required under the contract and shall also well and truly perform and fulfil all the Undertakings,
covenants, terms, conditions and agreements of any all duty and unduly authorized modifications of said
Contract that may hereafter be made, notice of which modifications to the surety being hereby waived or shall
pay over, make good and reimburse to the Employer all loss and damages which the employer may sustain by
reason of failure or default on the part of said Principal so to do.
We _____________________________________ further agree that the guarantee herein Contained shall remain in full force
and effect during the period that would be taken for the validity of the said Contract, and that it shall continue
to be enforceable till all the dues of the employer under or by virtue of the Contract have been fully paid and its
claims satisfied or discharged or till the Employer certifies that the terms and conditions of the Contract have
been fully and properly carried out by the said Contractor and accordingly discharges the guarantee. Unless a
demand or claim under this guarantee is made on us in writing on or before the ____________________ we shall be
discharged from all liability under this guarantee thereafter.
IN WITNESS WHERE OF, the above bounded parties have execute this instrument under their several seals on
the date indicated above the name and corporate seal of each corporate partly being hereto affixed and these
presents duly signed by its undersigned representatives, pursuant to authority of its governing body.
In the presence of witness individual
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
by ______________________________ affix Corporate Seal
Attested Corporate surety
Business address
For and on behalf of the Employer
4. Mistake in contractor's Drawings
The Contractor shall submit such drawings as may be required and shall be responsible for any
discrepancies,errors omissions in any drawings other particulars supplied by him notwithstanding that
such drawings orparticulars may been approved by Engineer.
5. Patent Rights etc.
The contractor shall fully indemnify the Governor of Gujarat against all actions, suits claims
demands, costs, charges expenses arising from or incurred by reason of any infringement or alleged
infringement, of any letters patent, design, trademark or name copyright or other protected rights in
respect of any machine, plant,work materials thing or system or method of using fixing working or
arrangement used or fixed or supplied by contractor but this indemnity shall not extend or apply to any
action suit claim, demand cost charges or expenses arising from or incurred by reason of the use of the
work or any part thereof otherwise then in the manner of for a purpose contemplated by the contract all
royalties and other similar payments which may have to paid for the use of any machine, plants, work,
material thing system or method as aforesaid (whether payable in one sum or by installment or
otherwise) shall be covered by the contract price and payable by the contractor.
In the event of any claim or demand being made or action or suit brought against the Governor of
Gujarat in respect of any such matter or matters as all negotiations for the settlement of such claim or
demand and such action aforesaid the contractor shall be duly notified, thereof, and he shall conduct or
suit also be conducted by him subject if and so far as Governor of Gujarat shall think proper under the
Supervision & Control of Governor of Gujarat through the officer duly authorized on his behalf.
6. Excess over Tender quantities, Extra items & Variations in Specifications, Drawings etc.
6.1 The Engineer-in-charge shall have power to make any late rations additions in or to the original
specifications drawings design instructions that may appear to him to be necessary of advisable
during the progress of the work and contractor shall be bound to carry out the work in accordance
with any instructions in this connection which may be given to him in writing signed by the
Engineer-in-charge and such alternation shall not invalidate the contract and additional work which
the contractor may be directed to do in the manner above specified as part of the work shall be
carried out by the contractor on the manner above specified as part of the work shall be carried out
by the contractor in the same conditions in all respect on which he agreed to do the work and at the
same rate as are specified in tender for the main work.
6.2 Except that when the quantity of any item exceeds the quantity as in the tender by more than 10%
the contractor will be paid for the quantity in excess of 10% at the rate entered in the S.O.R. of the
year during which the excess in quantity is first executed or tender rate whichever is less.
6.3 If the additional or altered work includes any class of work for which no rate is specified in these
contract, then such class of work shall be carried out.
(i) At the rate derived from the item within the contractor which is comparable to the one
involving additional altered class of work where there are more than one comparable items, the
item of the contract which in nearest in comparison with regard to class or classes of the work
involved shall be selected and the decision of the superintending Engineer as to the nearest
comparable item shall be final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be carried
out at the rate angered in the Schedule of Rates of the Division for the year in which, the tender
was received, increased or decreased by the percentage by which the tender received
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
increased or decreased by the percentage by which the tender amount is more or less as
compared or decreased by the percentage by which the tender amount is more or less as
compared to the amount arrived at the rates in the "Schedule of Rates" Divisions in the year in
which the tender was received. If the Schedule of rates calculated considering such items which
were included in the "Schedule of Rates of the Division for the year and or materials consumed
on such item the rate to be charged would be the basic rate taken into account for fixing the rate
in S.O.R. referred to above instead of the rate.
(iii) If it is not possible to arrive at the rate form(i) and (ii) above, such class of work shall be carried
out at the rate decided by the competent authorities on the basis of detailed rate analysis after
hearing the contractor before as committee of two superintending Engineers stationed at the
same place or the nearest place.
6.4 If the additional or altered work, for which no rate is entered in the "Schedule or Rates" of the
Division is ordered to be carried out before the rate is agreed upon, then the contractor shall within
seven days of the date of receipt by him of the order to carry out the work, inform the Engineer-in-
charge does not agree to this rates, he shall by notice in writing be at liberty to cancel his order to
carry out such class of work and arrange to carry it out in such manner as he may consider fit
advisable, provided always that if the contractor shall commence work or incurred any expenditure
in regard thereof before the rates shall have been determined as lastly herein before mentioned,
then in such cases he shall only be entitled to be paid in respect of the work carried out or
expenditure incurred by him prior to the date of the determination of the rate as aforesaid according
to such rate or rates as shall be fixed by the Engineer-in-charge. In the event of the dispute the
decision the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and specifications
recommended by the contractor and accepted by the competent authority, the alternation above
referred to shall be within the scope of such designs drawings and specifications appended to the
The time limit for the completion of the work shall be extended in the proportion that the increase in
the cost occasioned by alternations bears to the cost of the original contract work and the certificate
of the Engineer-in-charge as to such proportion shall final and conclusive.
7. Work man ship and materials :
The works shall be carried out in all respects with workmanship and materials of the best and most
substantial and approved qualities to the entire satisfaction of the Engineer who may reject any plant,
apparatus of material or workmen ship which slab in his opinion be of defective quality any such
rejection to be final and conclusive. The contractor shall at his own expenses provide all material labour,
haulage, power, tools, tackles and apparatus necessary to execute and complete the works and plant in
the manner aforesaid.
8. Use of work pending completion :
The Governor of Gujarat shall be at liberty at any time to put into beneficial use the whole or any
part of the work he may desire to use pending the formal completion and taking over of the same.
9. Subletting of contract :
The contractor shall not without the consent in writing of the Governor of Gujarat under the hand of
the Engineer assign or sublet the contract nor make any sub contract with an person or persons for the
execution of any portions of the work other than for raw materials, or for any part of the work of which
the manufacturers are named on his contract.
10. Protection and liability for a accidents, Theft and Damage :
The contractor shall at all items until the commencement of the period maintenance as provided in
clause 16 property and sufficiently cover up and protect all materials delivered on site from damage or
injury by exposure to the weather and shall take every proper precaution against accident, damage or
injury on the same from any cause. The contractor shall be and remain answerable and liable for all
accident and damage thereto which until the commencement of the period of maintenance as provided
for under clause 16 may arise or be occasioned by the acts or omissions of the contractor or his
workmen, agents, servants or sub-contractors and all loses and damages arising from such accidents
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
damage or injuries and aforesaid shall be made good in the most complete and substantial manner by and
at sole cost of the contractor and to the satisfaction of the Engineer.
Provided that should the Engineer certify, that the work has been completed but that owning to
circumstances over which the contractor has no control the work cannot be taken over the contractor
shall not be held liable for any loss of or damage to the work occasioned by such delay in taking over and
occurring more than one month after date of completion of the work as certified by the Engineer.
Until the work shall be or deemed to be taken over as hereafter provided the contractor shall also
indemnify to Governor of Gujarat from and against all claims and demands, suits proceedings, cost and
expenses in respect in respect of or in connection with any injury to person or damage to property by
whomsoever sustained or by defective design work for thefts of any property of the Governor of Gujarat
or of other committed by any employees of his own or his subcontractors and shall be liable for the costs
of replacing any property stolen.
11. Insurance :
Subject as hereinafter provided the contractor shall at his own expense insure and at all times prior
to the commencement of the period of maintenance keep insured against destruction or damage by fire or
earthquake storm and tempest such plant and materials ordered for the work as may for the time being
be upon the site for the full value of such plant and materials.
12. Materials brought on the site :
All materials tools and tackle brought to and delivered upon the site for the purpose of the work
shall from the time of their being so brought vest in and be the property of the Governor of Gujarat but
may be used for the purpose of the work but for that purpose only and not on any account be removed or
taken away by the contractor or any other person without the express permission in writing of the
Engineer but the contractor shall nevertheless (subject as hereinafter provided) be solely liable and
responsible for any loss or destruction thereof or damage unless resulting from causes beyond the
contractor's control not being causes insurance against destruction or damage from which is provided for
in clause 11.. The Governor of Gujarat shall have a lien on such materials, tools and tackle for any sum
which may to any time prior to the completion of the works be due or owing to him the contractor under
in respect of or by reason of the contract and shall be at liberty to sell and dispose of any of such
materials, tools and tackle remaining after the completion of the works in such manner as he shall think
fit, and to apply the proceeds in or towards the satisfaction of such sum or sums so due or owing as
aforesaid but subject to such lien and power of sale and disposal such surplus materials, tools and tackle
shall being to the contractor and may be removed and disposed of by him as he shall think fit after the lien
is withdrawn by the Engineer-in-charge.
If the contractor shall at any time fail in the opinion of the Engineer to proceed with the work with
due diligence and expedition or shall refuse, neglect or omit to comply with any orders given to him in
writing by the Engineer- in-accordance with the provisions of the conditions or shall commit any other
breach of the provision of the contract, the Engineer shall be at liberty to give notice in writing to the
contractor to make good the failure neglect. omission or breach complained of and should be contractor
shall fail to comply with any such notice within such period as may be prescribed in such period as may
be prescribed in such notice then and in such case the Governor of Gujarat shall be at liberty to employ
workmen other than those of the contractor to perform and execute the work in respect of which the
failure neglect or omission referred to in such notice shall have been committed or occurred. If the
Governor of Gujarat shall think fit, it shall be lawful for him to enter into a new contract with any other
persons, or person, for the execution of such part of the work as may not have been executed and in that
event the Governor of Gujarat shall without incurring any liability to the contractor be entitled to use all
or any of the materials, tools, tackle or there things which may then be on site for the purpose of
completing the work or any part thereof and to provide any additional materials, tools, or tackle required
for the purpose and the cost of executing any such work and providing any such materials shall be paid by
the contractor to the Governor of Gujarat on demand.
Subject to and after satisfaction of the lien of the Governor of Gujarat for any sum due to him by the
Contractor for any expenses cost or charges incurred in the completion of the work, all materials , tools,
tackle or other thing remaining on the site and unsold after such completion shall forthwith hereafter be
removed by the contractor.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
14. Replacement of Defective work or material :
If during the progress of the work the Engineer shall notify in writing to the contractor that in his
opinion the Contactor has executed any unsound or imperfect work, or has supplied any materials
inferior in quality to those stipulated for by the contractor, the contractor shall at his own expense, within
ten days of his receiving the notice proceed with due expedition to remove or after and reconstruct or
replace the work or as the case may be supplied fresh materials up tothe standard of the specification. In
place of the work or materials complained of by the notice (as the case may be) and in case the contractor
shall fail to do so the Governor of Gujarat may after expiration of ten days from giving of such notice give
a further notice in writing stating that the Governor of Gujarat intention so to do forthwith at the cost of
the contractor remove the work or materials complained of and perform all such work or (as the case
may be) supply all such materials in place of those complained of as may be necessary or proper in order
to comply with the contractor and the cost as certified by the Engineer of any such removed and
performance of work or supply of materials shall be paid by the contractor to the Governor of Gujarat on
demand provided always that nothing in this clause shall be deeded to derive the Government Gujarat or
effect any other rights or remedies under the contract or otherwise which he may have in respect of such
defects of deficiencies. No payment which have been made on account of materials delivered or work
executed shall be looked on as acceptance of such or any work or materials.
15. Cutting away & making good :
The tender is include all necessary cutting and making good for the purpose of the contract of the
wood work, walk, floors etc. of the site. The contractor win be held responsible for and will have to make
good at his own expanse to the satisfaction of the Engineer, any damages to or disfigurement of the site
which may have been caused the acts or omissions of himself or his servants or agents in connection with
the carrying out the contract.
16. Maintenance :
The Contractor shall make good at his own expense all defects "due to faulty design material, or
workmanship on the part of the contractor which may during a period of 12 calendar months form the
date of which the work is certified by the Engineer to have been brought into beneficial use or if no such
certificate is given from the date of the final payment for the work under clause 20 (which period is
hereinafter called the "the period of maintenance") develop under proper use in the work or any part
thereof by replacing plant materials or work or otherwise as a may be necessary. Any such making good
by the contractor shall in no case relieve him from his liability to make good any further defect in these
work made good of replace which made develop during the reminder of such period of twelve months, if
any such defects are clearly caused by the fault of the contractor and are liable to recurrence the
contractor shall make such alterations as are required to prevent any recurrence of such defects. If any
defects or alterations which contractor shall become liable make good or make under this clause be not
made good or made good or make the same (as the case may be) at the risk and expense of the
Contractor, but without prejudice to any other right or remedies which the Governor of Gujarat may have
against the Contractor in respect of his default in making good or making the same as aforesaid/and the
cost of any such making good or making shall be paid by the contractor to the Government of Gujarat on
17. Contractor's Representative & workmen :
The contractor shall employ at least one competent representative, whose name or names shall have
previously been communicated in writing to the Engineer by the contractor to superintend the carrying
out the works. The said representative of if more than one shall be employed then, one of such
representative shall always be present on the site during working hours and any written orders or
instruction which the Engineer or his duly authorized representative, whose name shall have been
previously communicated in writing to the contractor, may give to the said representative of contractor
shall be deemed to have been given to the contractor.
The Engineer shall be at liberty to object to any representative or person employed by the
Contractor in execution of or otherwise about the work who in the Engineers opinion, shall misconduct
himself or be incompetent or negligent and the contractor shall remove every person so objected to
forthwith upon receipt from the Engineer of notice in writing requiring him to do so.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
17.A Minimum age of persons employed and employment of donkeys or other animals :
(i) The contractor shall not employ any person who is under the age 15 years.
(ii) The contractor shall not employ donkeys or other animals with breaching of string or thin rope.
The breaching must be attest three inches side and should be tape (Nawar).
(iii) No animal suffering from sores, lameness or emaciation or which is immature shall be employed
(iv) If contractor does not accept the proceeding condition No. (i), (ii), & (iii) his tender shall not be
accepted and his name shall be removed from the list contractors.
(v) The Engineer shall remove form the work any person or animal found working which does not
satisfy these conditions and to responsibility shall be accepted by the Governor of Gujarat for any
delay caused in the completion of the work by such removal.
17.B One percent of work done and payable in bills be recovered as contribution towards building and
other construction workers welfare cess the certificate of deduction of welfare cess shall be issued to the
18. Submission of Samples :
The contractor shall not without written sanction of the Engineer use for the execution of the work
any materials plant or stores of any type of description other than those specified in his tender. He shall if
required to do so or at his options, deposit samples, at the Office of the Engineer for approval and the
Engineer shall within 14 days or the receipt of the samples, express in writing contract to his approval or
otherwise of the samples deposited and all materials, plant and stores used in the execution of
the work, must be in every away equal to the deposited samples. All the deposited samples will be
returned to the contractor within one month of the work being taken over.
19. Deduction from contract Price :
The amount or all cost of work, expenses; or other sums which under the contract shall be payable
by the contractor to the Governor of Gujarat from any moneys due or becoming due by him to the
contractor under contract, without-prejudice to the Governor of Gujarat right to recover the same by the
ordinary process of law.
20. Terms of Payments :
Subject to any deduction which the Governor of Gujarat may be authorized to make under the
contract, the contractor shall be entitled upon the certificate of the Engineer to the effect hereinafter
stated payments of R.A. Bills shall be made to contractor as per items, in measurable units
executed according to the specifications.
It at any time the contractor shall be prevented for any period of not less than 30 days from causes within
the control of the Governor of Gujarat either first, from delivering on the site any plant or materials ready
in India for delivery or secondly from proceeding with the erection at any plant or materials which he had
already delivered on the site, the Governor of Gujarat shall bear the cost of storage and protection,
including insurance in accordance the clause ii, of the plant and materials during such period in the first
of such of contractor shall be entitled to payment of 80% of the value certified as aforesaid of the plant or
materials delivery of which shall have been so prevented within one month from the date on which as
certified by the Engineer such plant or materials are so ready as aforesaid provided that all portions
thereof have been suitably and sufficiently marked as being property of the Governor of Gujarat and are
delivered into the custody of some person approved by the Engineer who has granted a receipt thereof.
Instalments shall be due and payable by the Governor of Gujarat within one month from the date of each
certificate of the Engineer.
21. Certificate of Engineer :
Every application to the Engineer for a certificate must be accompanied by a detailed claim in
duplicate setting forth (in the order of the Schedule of price if any) particulars of the Plant or materials
delivered and work executed to the date of the claim, and the certificate as to the plant and work
mentioned in the claim as is in the opinion the Engineer in accordance with the contract shall be issued
within 14 days of the application. No application for a certificate shall be made within 14 days previous
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
22. Certificate not to affect rights of the Governor of Gujarat of contractor :
The Engineer may be any certificate make any correction or modification in any certificate
previously issued by him any payment shall be regulated and adjusted accordingly, No certificate of the
Engineer shall nor shall any payments on accounts by the Governor of Gujarat the Contractor, nor
extension of time for the execution of the work by contractor which may be granted by or behalf of the
Governor of Gujarat affect or prejudice any of the lights, of the Governor of Gujarat against the contractor
under or relieve him any of his obligations for or in respect of the due performance of the contract, or be
interpreted as approval of work done or of materials supplied.
23. Suspension of work :
The Governor of Gujarat shall any to the contractor all proper expenses arising from suspensions of
the work by order in writing of the Engineer or any other officer on behalf of the Governor of Gujarat
unless such suspension is due of some default on the part of the contractor or any subcontractor under
24. Damages for delay in completion :
(i) If the Contractor fails to complete the work under contract by the stipulated date, he shall
pay liquidated damages of Rs.0.1 percentage of the contract value per day from the date of
delaying the said work up to the date of completion and banding over to the Government.
(ii) However also if the contractor fails to complete and part of the work Proportionate to by the
time in relation to the value of such part, he shall pay Liquidated damages per day from the
date of delaying the said part of the work up to the date of completion or the said designated
part at the rates shown in the said schedule of the contract value of such part for such failure
till the said designated part is completed.
(iii) The agree gate maximum of liquidated damages payable under this clause shall not exceed
Rs. 0.1 percentage of contract value per day and shall be subject to the maximum amount of
ten percent of the estimated amount put to tender.
(iv) Delays requiring payment of ten percent liquidated damages of the amount put to tender for
performance shall be sufficient cause for termination of contract and for forfeiture of
security deposit. (including amount of performance bond in forfeiture of works estimated to
cost more than Rs. 15 lacs, for performance) and registration of the contractor shall also be
kept in abeyance of three years form the date as fixed in all such cases.
24.A If the contract shall desire an extension of the time for completion of work on the ground of his
having been unavoidably hindered in it execution or on any other ground he shall apply in writing to the
EIC before the expiration of the period stipulated in the tender or before expiration of 30 days from the
date on which he was hindered as aforesaid on with the cause for making for extension occurred
whichever is earlier and the EIC may if in his opinion. There are reasonable and bona fide grounds for
granting. And extensiongrant such extensions as the thinks necessary or proper. The decision of the EIC in
his matter shall be final.
No applications for extension of time for completion of work shall be considered unless it is received by
registered post in the office of the Executive Engineer (Mech.) or left at his office and obtained receipt
there of duly signed by the Executive Engineer (Mech.) or his nominee authorized in this respect.
The date of receipt of application by the Executive Engineer (Mech.), shall be considered as the date of
application for the purpose of counting the period as mentioned above.
24.B "If the contractor or his workmen or servants shall break, deface injure or destroy and part of the
building or the work in question in/or which they may be working or any building road fence, enclosure
or glass-land or cultivated round contingence to the premises on which the work or any part there is
being executed or if any damage shall be done to the work from any cause whatever before completion of
the work or before the completion of the maintenance period whichever is later or any damages occurred
caused due to normal flood or rain or if any imperfection become apparent in it within three months from
the grant of a certificate of completion, final or otherwise by the Engineer-in-charge, the contractor shall
make good the same at his own expenses or in default, the Engineer-in-charge may cause the same to be
good by other contractor and deduct expenses (of which thecertificate of the Engineer-in-charge shall be
final) from any sums that may then be due or may thereafter become due to the contractor or from his
security deposit or the proceeds of sale thereof a sufficient portion thereof".
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
24.C Force Major Clause :
Neither party shall be liable to the other for any loss or damage occasioned by or arising out of
acts of God such as Unprecedented flood, Volcanic eruption, earthquake or other convulsion of nature and
other acts such as but not restricted to general strike invasion, the acts of foreign countries, hostilities, or
war like operations before or after declaration of war, rebellion military or usurped power which prevent
performance of the contract and which could not have been foreseen of avoided by a prudent person.
Note: Unprecedented flood means *here flood crossing the Hi Flood Level of the past-year (s) which is on
the available record. (Modified Vide R&BD.G.R. No. TNC-1096-IB-143-(16)-C dated 11-1-99)
25. Time of taking over :
The work shall for the purpose of all the provisions of these conditions be deemed to have been
completed and taken over by the Governor of Gujarat when the Engineer, shall have certified in writing
that it has been completed in accordance with the contract conditions and such certificate shall not be
unreasonable withheld nor shall the Engineer delay its issue on account of commissions of defects which
in his opinion do not affect the efficient use of work but such issue shall be without prejudice to the
contractor's liability to make good any such omission and defects with the greatest possible expedition.
26. Death or Bankruptcy :
The if the contractor shall die or become insolvent or bankrupt or have a receiving order made
against him or compound with or make on proposal carrying on his business under inspection or for the
benefit of his creditors or commit and act of insolvency or bankruptcy, or being a corporation bordered to
be wound up or have a received of its business appointed the Governor of Gujarat shall be entitled
forthwith by notice in writing to the contractor his legal representative to determine the contract and the
Governor of Gujarat may in that event complete the contract in such time and manner and by such person
as he shall think fit.
27. Disputes to be referred to Gujarat Public Works Disputes Arbitration Tribunal :
The disputes relating to this contract in so far as they fall within the jurisdiction of Gujarat public
works Disputes arbitration tribunal shall be referred to the said tribunal of Gujarat State.
However the reference to Arbitration Tribunal under this clause will not stay fulfilment of
obligations of the contractor or rights of the Engineer-in-charge under this contracts, unless otherwise
ordered to the contrary by the said Tribunal as Interim Relief measure.
(The following clause is to deemed included in this conditions only when Plant or Machinery is
included in the contract.)
28. Contract Drawings :
The contractor shall submit to the Engineer for his approval on or before the dates stipulated for the
purpose in the specification copies of all the drawings of the general arrangements of the plant as set out
there in and of such detail drawings as may be reasonably necessary.
Within Fourteen days from the receipt, by him of such copies the Engineer shall signify his approval
or otherwise of the same and if he does not do so he shall be doomed to have approved thereof. Within
Fourteen days from the notification by the Engineer to the contractor of his approval such copies, or in
the absence of such notification within-thirty days from the receipt of such copies, the copies in ink on
tracing cloth, or Ferro Gallic prints mounted on cloth, of ail drawings as approved shall be supplied to the
engineer by the contractor respective and shall there upon the signed by the contractor and become there
property of the Governor of Gujarat.
Such signed copies of the drawing shall not be departed from in any way whatsoever except with the
written permission of the Engineer, during the execution of the works of the signed copies shall be always
kept available for reference on the site.
In the event of the Contractor desiring to keep in his own possession a signed copy of the drawings
as approved he shall supply three copies instead of two and in this case the Engineer shall sign the third
copy and I return the same to the Contractor.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
29. Manner of Execution, Quality of materials etc. :
The plant shall be manufacture, constructed, provided, put in position and maintain in-the best and
most substantial and workmen like manner and materials of the best and approved qualities having
regard to the respective uses.
30. Test on site :
In all cases where the special conditions are provided for tests on the site where there of plant
materials on workmanship the Governor of Gujarat except where otherwise specifically stipulated shall
provide free of charge such labour materials fuel stores, apparatus and instruments as may be
requisitioned from time to time efficiently to carry out such tests in accordance with the condition.
Where electrical energy is required for tests on site and supply is available on the site form an
existing installation such electrical energy shall be supplied to the contractor by the Govt. free of charge at
the pressure and frequency of the ordinary supply is available the electrical energy necessary for such
tests shall be provided by the contractor.
31. Delivery of plants & materials :
No. plant materials shall be tendered for delivery until and intimation is writing shall have been
given to the contractor by the Engineer that Governor of Gujarat is ready to take delivery.
32. Tests on completion :
On the completion of the works on the site is accordance with the contract the contractor shall give
the Engineer notice in writing of such completion. The Engineer shall after receipt of such notice by notice
in writing under his hand for date and an hour on that date for the making of the test on site if any such
are provided for the contract".
The contractor shall carry out such tests upon the date and at the hour so fixed and if the Engineer or
his authorized representative shall attend on that date at that hours such test shall be carried out in the
presence the Engineer or such representative.
If any portion of the plant fails under the tests to satisfy the contract conditions similar tests
according to the contract of the portion so failing shall if required by the Engineer or by the Contractor be
repeated within a time to be fixed by the Engineer and the provisions of this clause shall apply to such
repeat 20 test as if they were the original tests and the contractor shall pay to the Governor of Gujarat all
reasonable expenses to which he may be put by such test.
If the test or any repeated tests so required as aforesaid be not made by the contractor on the date
fixed as aforesaid or the same by the Engineer may proceed to make such test himself at the contractor's
risk and expense.
If in any test under this clause the plant tested shall fail to satisfy the contract conditions the
Governor of Gujarat shall as from the date stipulated by the contract for completion nevertheless have
the right of using such plant until the same shall satisfy such conditions and such Use shall be at the
contractor's risk. In the event of the question whether the works have been completed in accordance with
the contract or any question regarding such completion being submitted to Arbitration as any portion of
the plant the Engineer may certify to be capable of being use on condition of paying to the contractor a
sum calculated (according the period of the use) at the rate of 5 present per annum upon the amount
withheld or deducted in respect of such plant.
33. Rejection of Defective Work :
If the works, or any portion thereof shall not the opinion of the Engineer on the stipulated tests (if
any) being made is accordance with the contract satisfy the contract conditions within three months after
the date of completion the engineer may give notice in writing to the contractor setting for the particular
of the defects of particulars in respect of which the works in his opinion fail to comply with the contract
conditions and requiring the contract to make good, after or replace the same within such time to be
specified in the notice as the engineer may consider reasonable and the contractor shall make good, after
or replace the same as required by such notice and such as to make it employ with the requirements of
the contract condition within the time so specified. Should be he fail to do so within that the Governor of
Gujarat may make good after of replace the same as so required any the cost of such making alteration
good or replacement (less) in case of any replacement any such, which would have become due to the
contractor under the contract in respect of the works replaced and which shall not have been paid to him
shall be paid by the contractor to the Governor of Gujarat demand or should the Governor of Gujarat not
make good after of replace any defective works in respect of which notice as aforesaid shall be given
within six weeks from the date of the given of such notice the contractor shall repay the Governor of
Gujarat all sums (in any) paid by him to the contractor in respect of such works. Nothing contained in this
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
clause shall prejudice or affect the rights of the Governor of Gujarat under the contractor whether in the
way of enforcement of penalties of otherwise in respect of any delay in the completion of this work.
34. Use of plant of works pending making good :
If at expiration of the time specified for making good, altering or replacing the plant of works in any
notice given by the engineer to the contractor under the last proceeding clause the contractor shall not
have duly made good. altered or replaced the same in accordance with the contractor the Governor of
Gujarat shall be at liberty if he thinks fit to make use of the same for such time as shall be reasonably
sufficient according to the circumstances enable him, to make good after or replace the same (whichever
he may see fit to do) provided that in respect of the period of such user, the Govt. of Gujarat shall not be
entitled to any damages under clause 24 of these conditions land in the case of complete replacement the
contract shall be entitled to be paid reasonable sum for same.
35. Workmen's compensation in case of injury :
The contractor shall be responsible for any compensation and shall pay to his workmen
compensation payable for injuries under the workmen's compensation Act 1923 (VIII of 1923)
hereinafter called the said Act. If such compensation is paid by Government as principal under sub-
section. (1) of section 12 of the said Act, on behalf of the contractor. It shall be recoverable by
Government from the contractor under sub section (2) of the said section such compensation shall be
recovered in the manner laid down in clause 3 and 19 of the condition of contract.
36. The Apprentices :
The contractors shall afford or procure as the case may be every facility to Indian apprentices for
practical training in the factory.
Owned managed controlled or patronized by them so as to enable the Indian apprentices to acquire
full knowledge of the technique and work of their trade industry calling or profession.
37. Set off Clause :
Any sums of money due to the contract (including the security deposit returnable to the contractor
under this contract shall be appropriated by the Government and shall be set off against any claim of the
Government for the payment of such of a money arising out of or under any other contract made by the
contract with the Government. When no such amount for purpose of the recovery form the contract
against any claim of the Government is available such a recovery shall be made from the contractor as
arrears of land revenues.
38. Appointment of Local Labourers :
The contractor should as far as possible obtain the requirement of labourers skilled and unskilled
from the nearest employment exchanges so as to utilize the local employment potential. If there are no
local employment exchange or such exchanges are not able to provide the required labourers locally.
Suitable local labours should be utilized to the maximum extent possible.
39. Fair wages :
If a contractor fails to pay within 7 (seven) days to the labours(s) worker(s) the minimum wages
prescribed by the Government under the minimum wages Act.1949 as in force from time to time the
Executive Engineer (Mech.) or the officer of an equal rank shall be at liberty to deduct the amount payable
to the labourer(s) workers form his (contractor's) bill or deposit(s) payable by the contract after making
due inquiries and shall not be entitled to any payment or compensation on account of any loss that he
(contractor) may have to incur of the action as aforesaid. Before the action as aforesaid is enforced notice
in writing to the contractor shall be issued by the Executive Engineer (Mech.) or the officer of the equal
rank to pay the wages as per minimum wages Act enforce at the relevant time. If the contractor does not
act as aforesaid within seven days then the action contemplated as above shall be taken against him.
40. License for contract labour :
Before starting the work, the contractor will have to obtain the licence from the District Assistant
Labour Commissioner under the Contract Labour (Regulation and Abolition) Act, 1970 and contract
Labour (Regulation and Abolition) Gujarat Rules 1972 after paying necessary fees and deposit on the
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
basis of the number of labourers to be employed on the work and will have to supply two true copies of
the said licence to the Deputy Executive Engineer before the work is started.
41. Deduction of GST from bills:
The following tax deduction shall be made from each bill payable to the contractor (1) 1% of the
value of amount payable towards SGST. (2) 1% of the value of amount payable towards CGST. TDS
certificate for taxes deducted will be issued to the contractor (F.D.G.R. No GST/1017/1097/GST Cell dated
Executive Engineer (M),D’cell
Signature of contractor/s
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Schedule showing (approximately) the materials to be supplied from the Public works Store for
work Contracted to be executed and the rates at which they are to be charged for
Particulars Approximate Rate at which the materials will be Place of delivery
quantity charged to the contractor
unit Rate in Rupees.
Unit Rate in Rupees
This Clause has been Deleted
Note: 1. The person or firms submitting the tender should see that the rates in the above schedule are
filled up by the Engineer-in-charge before the issue of the form prior to the submission of the tender.
Note: 2. Store to be supplied to contractors for a work free of cost should be mentioned in Schedule 'A' in
addition to schedule 'B' and the specification attached to the contract agreement form.
Executive Engineer (M),D’cell
Signature of contractor/s
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Memorandum showing items of works to be carried out :
(For works Estimated below Rs. 5 lakhs)
Quantities Estimated Rates Total amount
Quantities Estimated Rates Total amount
Items estimated but according to
Item of work Unit
No. may be more In figures estimated
or less Rs. Ps. quantities
-------- As per Separate Chapter of this Tender Document ---------
I/ We am/are willing to carry out the work at…………………………………% above/below
Percent (should be written in figure and words) of the estimated rates mentioned above. Amount of
my/our tender works out as under.
Estimated Amount put to tender: Rs. ________________ Estimated Amount put to tender: Rs. ________________
* (Please strike out whichever is not applicable).
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
Specifications of Division or as directed.
Note 2 - All the columns is Schedule should be filled in ink and the total of the entries in the last
Column should be struck be the contractor under his signature.
Note 3 -Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4 - To be continued on additional sheets, if found necessary.
Executive Engineer (M),D’cell
Signature of contractor/s
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Memorandum showing items of works to be carried out :
(For works Estimated above Rs. 5 lakhs)
Quantities Tendered Rates Total amount
Quantities Tendered Rates Total amount
Items estimated but according to
Item of work Unit
No. may be more In figures estimated
or less Rs. Ps. quantities
-------- As per Separate Chapter of this Tender Document ---------
(A) Total Tendered amount Rs…………………………………
(B) Rebate on above tendered amount (if any)……% (in figure) Rs…..……………………………..
(C) Net tendered amount (A - B) Rs…………………………………..
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed.
Note 2 - Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
Executive Engineer (M),D’cell
Signature of contractor/s
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
SPECIFICATIONS FOR ELECTRICAL WORKS IN GOVERNMENT BUILDINGSUBJECT
TO THE GENERAL CONDITION OF CONTRACT IN FORCE (1986)
1. Wirings Rule :
The installation generally shall be carried out in conformity with relevant Indian standard.
Specification and code of practices prevalent, Indian Electricity Rules, 1956 and Indian Electricity
Act. 1910 as amended from time to time.
2. Definition :
The definition of terms shall be in accordance with Indian standard code of Practice for Electrical
wiring installation IS-732-1982 except for the definition of point in case of internal Electrical
Installation. For definition of point wiring and measurement of Electrical works IS-5908-1970 shall
be referred to.
3. Voltage and Frequency of supply :
All current consuming devices shall be suitable for frequency of 50C/s and systems of voltage meant
for unless otherwise specified.
4. Layout of wiring and its description :
(i) The wiring shall be carried out as per schedule "Power" wiring must be in screwed conduit and
shall be kept separate and distinct from lighting wiring. All wiring must be done on the
distribution system with main and branch distribution boards at convenient centers and without
isolated fuses. All conductors shall be run as far as possible along the walls and ceiling as to be
easily accessible and capable of being thoroughly inspected. The balancing ofcircuits will be
arranged beforehand by the Executive Engineer (Mech.), .
(ii) Within one month of the taking over the installation, the contractor shall supply to the Executive
Engineer (Mech.), a complete set of wiring diagrams of the same on drawings to be supplied
when available by the Executive Engineer (Mech.) and to the satisfaction of the Executive
Engineer (Mech.), D’cell. Dept. and these wiring plans shall be "Drawings" within the meaning of
the term as used in the General conditions of contract.
5. Conductors :
All conductors unless otherwise specified shall not be less than 1.5 sq. mm. for point wiring and
sq. mm for mains conductors for power and lighting circuits shall be of adequate size to carry the
designed circuit load without exceeding the permissible thermal limits for the installation, and such
sizes will be stipulated in specifications and or drawings.
6.1 All cables shall conform to relevant Indian Standards.
6.2 Conductors of all cables except the flexible cable shall be of aluminum. The smallest aluminum
conductor for the final circuit shall have nominal cross sectional area of not less than 1.5 sq. mm.
The minimum size of the aluminum conductors for power wiring shall be 4 sq. mm.
6.3.1 Conductors of flexible cables shall be of copper the minimum cross sectional area of such a cables
shall be 14.0193 mm. the Flexible cable shall have uniform and adequate insulation.
6.3.2 Unless the flexible cables and conductors are protected by armor or though rubber of PVC Sheath,
theses shallnot be used in workshops and other places where they are liable to mechanical damage.
6.3.3 Core flexible cables shall be used for connecting single phase Appliances for phase, natural & earth
7. Fall of Potential :
The Cross sectional area of all conductors inside buildings shall be so proportioned to their lengths
that the drop in voltage between main fuses and the farthest point or any lamp shall not exceed three
percent of the voltage of the consumer's with all the consuming devices in use.
7.1 If the Cable Size is increased to avoid the voltage drop in circuit current rating of the cable shall be
more than that for which circuit is designed. In each circuit or sub circuit or sub circuit every cable
shall have current rating not less than that of the fuse which protects the circuit or sub circuits
respectively for current higher than the full load current.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
8. Ratings of lamps and fans socket outlets : Points and exhaust fans
8.1 Incandescent lamps installed in residential and non-residential buildings shall be rated at 60 watts &
100 watts respectively.
8.2 Table fans and ceiling fans shall be rated at 60 watts, exhaust fan shall be rated according to their
8.3 5Amp. Socket outlet points and 15Amp. Socket outlet points shall be rated at 100watts and
watts respectively for the purpose of load assessment unless actual values of the load are, know or
9.1 Before the installation is commissioned following tests shall be carried out.
(1) Insulation Resistance Test.
(2) Polarity Tests of Switches
(3) Earth continuity tests
(4) Earth electrodes Resistance test.
9.2.1.1 The insulation Resistance shall be measured between earth and the whole system of conductors or
any section thereof with all fuses in place and all switches closed, and except in earthed concentric
wiring all lamps in position or both poles of installation otherwise electrically connected together.
A direct current pressure of not less than twice the working pressure provided that it need not
exceed. 500 volts for medium voltage circuits where the supply is derived from three wire D.C or a
ploy phase A.C. system, the neutral pole of which is connected to earth either direct or through
added resistance, the working pressure shall be deemed to be that which is maintained between
the phase conductor and the neutral.
9.2.1.2 The insulation resistance shall also be measured between all conductors to one pole or phase
conductor of the supply and all the conductors connected to the neutral or to the order pole or
phase conductors of the supply with all lamps in position and switches in "OFF" position and its
value shall be not less than in that specified in sub-clause 9.2.1.3.
9.2.1.3 The insulation resistance in Mega-ohms measured as above shall not be less than 50 mega ohms
divided by the number if outlet or when PVC insulated cables are used for wiring 12.5 mega ohms
divided by number of outlets.
9.2.1.4 Where a whole installation is being tested a lower value than that given by the formula subject to a
minimum of 1 mega ohm is acceptable.
9.2.1.5 A preliminary and similar test may be made before lamps, etc., are installed and in this event the
insulation resistance to earth should be not less than 100 mega ohms divided by the number of
outlet or when PVC insulated cables are used for wiring 25 mega ohms divided by number of
9.2.1.6 The term "Outlet" includes every switch except that a switch combined with a socket outlet
appliance or lighting, fitting is regarded as one outlet.
9.2.1.7 Control rheostat heating and power appliance and electric sign may, if required, be dis-connected
from the circuit during the test, but in that event the insulation resistance between the case or
frame work, and all live parts of each rheostat, appliance and sign, shall be not less than that
specified in the relevant Indian Standard Specification or where there is no such specification shall
be not less than half a mega ohm.
9.2.2 Polarity Test :
9.2.2.1 In a two wire installation a test shall be made to verify that all switches in every circuits have been
fitted in the same conductor throughout & such conductor shall be labelled or marked for
connection to the phase conductor or to the non-earthed conductor of the supply.
9.2.2.2 In a three wire or a four wire installation a test shall be made to verify that every non-linked single
pole switch is fitted in a conductor which is labeled or marked for connection to one of the phase
conductor of the supply.
9.2.2.3 The installation shall be connected to the supply for testing. The terminate of all switches shall be
tested by a testlamp one lead of which is connected to the earth. Glowing of test lamp to its full
brilliance when the switch is in on position irrespective of appliance in position or not shall
indicate that the switch is connected to the right polarity.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
9.2.3 Earth Continuity Test :
The earth continuity conductor including metal conduits and metallic envelops of cables in all
cases shall be tested for electric continuity and the electrical resistance of the same along with the
earthing lead but excluding any added resistance or earth leakage circuit breaker measured form
the connection with the earth electrode to any point in the earth continuity conductor in the
completed installation shall not exceed one ohm.
9.2.3.1 Earth Electrode Resistance Test :
Earth electrode Resistance test may be carried out by magger Earth Testers containing a direct
reading ohmmeter, a hand driven generator and auxiliary electrodes.
9.3 On completion of an electric installation (addition and alteration) a certificate shall be furnished by
the contractor countersigned by the certified Supervisor under whose direction supervision
the installation was carried out. This certificate shall be in the prescribed form as given in
Appendix-B in addition to the test certificate required by Local Electrical Supply Authorities.
10. Joint and looping back :
Unless with the sanction of Executive Engineer (Mech.), s all joints in conductor shall be means of
approved mechanical connectors in suitable and approved junction boxes but looping back system
shall be preferable.in wiring unless otherwise specified phase and live conduct shall be looped at the
switch box where a neutral conductor can be looped from light, fan or socked in non-residential
buildings neutral and earth continuity wire shall be brought to each of 'the switch boards should be
of adequate size to accommodate at least one number of 5 Amps, socket outlet and control
switch in future.
Main Switchgears, Switch Board and their location :
11.1 All main switches (other hart loss of iron clad pattern) carrying current of 10 Amp. and above shall
be twitted for back connections and shall be suitably protected.
11.2 AH switches and circuit breakers shall be constructed in accordance with the I.S. 4237-1967.
General requirement for switchgear and control gear for voltage not exceeding 1000 volts and
other relevant I.S. provided also that spring shall be either of phosphor bronze or if steel shall be
copper or Nickel plated and that handle shall the so fastened that they do not tend to unscrew or
11.3 All main switches shall be either of metal cad enclosed pattern of any insulated enclosed pattern
which shall be fixed at close proximity to the point of entry of supply.
11.4 Switch boards shall not be erected above gas, stoves, sinks or within 2.5 m of any washing unit in
the washing rooms of laundries or in the bath rooms, lavatories, toilets or kitchens.
11.5 Switch boards, if unavoidably fixed in places likely to be exposed to weather, to drip or to abnormal
noise temperature the outlet casing shall be weather proof and shall be provided with glands or
bushing of adopted to receive screwed" conduit according to the manner in which cables are run
PVC and double flanged bushes shall be fitted in the holes of the switches for entry and exit of
11.6 A Switch board not be installed so that its bottom is within 1.25 m above the floor unless the front
of the switch board completely enclosed by a door or the switch board is located in a position to
which only authorized persons have access.
11.7 Switch boards shall be recessed in the wall if so specified in the schedule of work or in the special
specification. The front shall be fitted with hinged panel of other suitable material such as Bakelite
in wood frame with locking arrangement, the outer surface of door being flush with the walls.
Ample room shall be provided at the back for connections and at the front between the switchgear
mountings and the door.
11.8 Equipment’s which are on the front of a switch board shall be so arranged that inadvertently
personal contact with live parts is unlikely during the manipulation of switchgears. changing of
fuses or like operations.
11.9 No holes other than the holes by means of which the panel is fixed shall be drilled closer than
cms from any edge of the panel.
11.10 The various live parts, unless they are effectively screened by substantial barriers of non-
hydroscopic, inflammable insulating material, shall be so spaced that space shall not be maintained
between such parts and earth.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
11.11 The arrangement of gear shall be such that they shall be readily accessible and their connections to
all instruments and apparatus shall also be traceable.
11.12 In every case in which switches and fuses are fitted on the same pole, these fuses shall be so
arranged that the fuses are not alive when their respective switches are in the off position.
11.13 No fuses other than fuses in instrument circuit shall be fixed on the back of or behind a switch
board panel of frame.
11.14 All the metal switchgears and switch boards shall be painted, prior to erection with one coat of
antirust primer, After erection they shall be painted with two coats of approved enamel or
aluminum paint as required on all sides wherever accessible.
11.15 All switch boards connected to medium voltage and above shall be provided with "Danger Notice
Plate" conforming to relevant Indian Standards.
12. Control at Point of Commencement of Supply :
12.1 There shall be a linked man switchgear with fuse on each live conductor of the supply mains at the
point of entry. The wiring throughout the installation shall be such that there is no break in the
natural wire except in the form of the linked switchgear the neutral shall also be distinctly marked.
In this connections Rule 32(2) of the Indian Electricity Rules, 1966 (See Appendix-A_ shall also be
12.2 The main switchgear shall be situated as near as practicable to be termination of services line and
shall be easily accessible without the use of any external aid.
12.3 On the main switchgear, where the conductor of a two wire system or an earthlyneutral conductor
of a multi wire system or a conductor which is to be connected thereto, an indication of a
permanent nature shall be provided to identify earthly neutral conductor. In this connection Rule
32(1) of Indian Electricity Rules, 1956 (see appendix 'A') shall be referred.
13. Switch Board & Distribution Boards :
Metal clad switch gear shall preferably be mounted on any of the following types of Board.
13.1 Hinged type Metal Board :
There shall consist of a box made of sheet metal not less than 2 mm thick and shall be provided
with a hinged cover to enable the board to swing open for examination of the wiring at the back.
The joints shall be welded. A teak wood board, thoroughly protected both inside and outside with
good insulating varnish conforming to IS : 347-1952 specification for varnish shellac for General
purpose and of not less than 6.5 mm thickness shall be provided at the back for attachment of
incoming and outgoing cables. There shall be a clear distance of not less than 2.9 cm between the
teak wood board and the cover, the distance being increased for larger boards in order that on
closing of the cover, the insulation of the cables in not subjected to damage and no shoat length of
cables is subjected to excessive twisting or bending in any case.
The board shall be security fixed to the wall by means of rag bolts, plugs or wooden Gutties and
shall be provided with a locking arrangement and an earthing stud. All wires passing through the
metal board shall be bunched. Alternatively, hinged type metal boards shall be made of sheet
covering mounted on channel or angle iron frame.
Note : Such type of boards are particularly suitable for small switch-boards for mounting metal-clad
switchgear connected to supply at low voltages.
13.2 Fixed type Metal Boards :
These shall consist of an angle or Channel of iron frame fixed on the wall or on floor and supported
on the wall at the top if necessary. There shall be a clear distance of one meter in front of the switch
board. If there are attachments of base connections at the back of the switch board Rules 51(1)c) of
Indian Electricity Rules, 1956 shall apply
NOTE : Such type of boards are particularly suitable for large switchboard for mounting large
number of switchgears or higher capacity metal clad switchgears of both.
13.3 Teak wood Boards :
For small installation connected to a single phase 230 volts supply teak wood boards may be
caused as main boards or sub-boards. These shall be of seasoned teak or other durable wood with
solid back impregnated with varnish of approved quality with all joints dovetailed.
13.4 In large size medium voltage installations, before proceeding with the actual construction of the
boards, a proper drawing showing the detailed dimensions and design including the disposition of
the mounting a which shall be symmetrically and neatly arranged for arriving at the overran
dimensions shall be prepare and approved by the engineer-in-charge.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
13.5 Recessing of Boards :
Where so specified the switch boards shall be recessed in the wall. The front shall be fitted with a
hinged panel of teak wood or other suitable materials, such as Bakelite, or with unbreakable glass
doors in teak wood frame with locking arrangement, the other surface off the doors being flush
with the walls, ample room shall be provided at the back for connection and at the front between
the switchgear mountings.
13.6 Arrangement of Apparatus :
a) Equipment which is on the front of a switch board shall be so arranged that inadvertently personal
contact with live parts is unlikely during the manipulation of switches, changing of fuses or like
b) No apparatus shall project beyond any edge of panel. No fuse body shall be mounted within 2.5 cm
of any edge of the panel and no hole other than holes by means of which the panel is fixed shall be
drilled closer than 1.3 cms from any edge of the panel.
c) The various live parts unless they are effectively screened by substantial barriers of non-
hydroscopic, non-inflammable insulating material, shall be so spaced that an are cannot maintain
between such parts and earth.
d) The arrangement of the gear shall be such that they shall be readily accessible and their connection
to all instruments and apparatus shall also be easily traceable.
e) In every case in which switches and fuses are fitted on the same pole, these fuses shall be so
arranged that the fuses are not alive when their respective switches are in the 'OFF' position.
f) No fuses other than fuses instrument circuit shall be fixed on the back of or behind a switchboard
panel or flame.
13.7 Marking of Apparatus :
a) Where a boards is connected to voltage higher than 250 volts, all the apparatus mounted on it shall
be marked in the following colours to which the apparatus or its different terminal may have been
Alternating Current Direct Current
Three-phase-red Three wire system-2 otherwise
Yellow & blue Positive red & negative blue
Natural-black Natural-black
Where fuse-wire three phase wiring is done, the neutral shall be in one colour and the other
three wires in another colour
b) Where a board has more than one switch shall be marked to indicate which section of the
installation it controls)
c) All markings required under the rule shall be clear permanent.
13.8 Main & Branch Distribution Board :
13.8.1 Main and branch distribution boards shall be any type mentioned in 13.1, 13.8.1. Main and
branch distribution boards shall be of any type mentioned in
13.8.2 Main distribution boards shall be provided with a switch or air circuit breaker on each pole of
each circuit, a fuse on the phase or live conductor and a link on the neutral or earthed conductor
of each circuit. The switches shall always be linked.
13.8.3 Branch Distribution Board :
13.8.3.1 Branch distribution boards shall be provided with a fuse of a miniature circuit breaker of both
the (adequate rating-setting chosen on the live conductor of each circuit and the earthed neutral
conductor shall be connected to a common line and be capable of being disconnected
individually for testing purposes. At least one spare circuit of the same capacity shall be provided
on each branch distribution board.
13.8.3.2 In residential installations, lights and fans may be wired on a common circuit such sub circuit
shall not have [more than total after points of lights, fans and socket outlets/The load of such
circuits shall be restricted to 800 watts. If a separate Fan circuit is provided the number of fans
in the circuit shall not exceed ten. power sub-circuits shall be designed according to the load but
in no case shall there be more than two outlets on each sub-circuits
13.8.3.3 In industrial another similar installations requiring the use of group control of switching
operation, circuits, for (socket outlets may be kept separate from fans and lights. Normally fans
and lights may be wired on a common circuit, however, if need is felt separate circuits may be
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
provided for the two. The road on any low voltage sub circuit shall not (exceed 3000 Watts.)
In case of new installation, all circuits and sub-circuits shall be designed by making provision of
20 (percent increase in load due to any future modification. Power sub-circuits shall be designed
according to the load but in no case shall there be more than four outlets in each sub-circuits
13.9 Installation of Distribution Boards :
13.9.1 The distribution fuse-boards shall be located as near as possible to the centre of the load they are
intended to control.
13.9.2 These shall be fixed on suitable stanchion or wall and shall be accessible for replacement of fuses.
13.9.3 These shall be of either metal-clad type, or all insulated type. But if exposed to weather or damp
situations, they shall be of the weather proof type and if installed where exposed to explosive
dust, vapour or gas, they shall be of flame proof type
13.9.4 Where two or more distribution fuse boards feed low voltage these distribution boards shall be
(1) Fixed not less than 2 m apart or
(2) Arranged so that it is not possible to open two at a time, namely they are interlocked and the
metal case is marked Danger 415 volts or
(3) installed in a room or enclosure accessible to only authorized person.
13.9.5 All distribution boards shall be marked lighting, power as the case may be and also marked with
the voltage and number of phases of the supply Each shall be provided with a circuits list giving
details of each circuit which it controls and the current rating of the circuit and size of fuse
13.9.6 Triple pole distribution boards shall not be generally used for final circuit distribution unless
specification approval of Engineer-in-charge is obtained in special cases where use of Triple pole
distribution boards are inevitable they shall be of H.R.C. fuse type only.
13.10 Wiring and Distribution Board :
13.10.1 In wiring a branch board, total load of the consuming devices shall be divided as far as possible,
evenly between the number of ways of the boards leaving the spare circuit for future extension.
13.10.2 All connections between pieces of apparatus or between apparatus and terminalson a board shall
be neatly arranged in a definite sequence following the arrangement of the apparatus mounted
thereon, avoiding unnecessary crossing.
13.10.3 Cables shall be connected to a terminal only by soldered or welded or crimped lugs using suitable
sleeve, lugs or ferrules unless the terminal is such a form that it is possible to securely clamp
them without the cutting away of cable strands.
13.10.4 All bare conductor shall be rigidly fixed in such a manner that a clearance of at least 2.5 cms. is
maintained between conductor of opposite polarity or phase and between the conductors any
material other than insulating material.
13.10.5 If required a pilot lamp shall be fixed and connected through on independent single-pole switch
and fuse to the bus-bars of the board.
13.10.6 In a hinged type board, the incoming and outgoing cables shall be fixed at one or more points
according to the number of cables on the back of the board leaving suitable space in between
cables and shall also, if possible be fixed at the corresponding points on the switch board panel.
The cables between these points shall be arranged to form a "U" or "S" shaped loop which shall be
of such length as to allow the switchboard panel to swing through an angle of not less than
14. Capacity of Circuits :
14.1 Lights and fans may be issued on a common circuits and such a circuit shall not have more than a
total of ten points of lights, fan and socket outlets or a load of 800 watts whichever is less. The power
circuits shall be designed with a maximum of two outlets per circuits generally when load is not
known or specified. In non-residential buildings at important District centers however one outlet per
circuit may be preferred. The circuit shall be designed based on the loading of the
Circuit where not specified the load shall be taken as 1 kw per outlet, where the load is more than
kw it should be controlled by a isolator switch or miniature circuit breeder.
15. Passing Through walls and floors :
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
15.1 Where conductors pass through walls one of the following methods shall be employed. Care shall be
taken to see that wires pass very freely through protective pipe of box and that the wires pass
through in a straight line without any twist of cross in wires, on other ends of such holes.
(a) A teak wood box extending through the whole thickness of the wall shall be buried in the wall
and casings or conductors shall be carried so as to allow 1.3 cms air space on three sides, of the
casing conductor.
(b) The conductor shall be caned either in a rigid steel conduit conforming to *IS : 1653-1964
specification for Rigid Steel conduits of Electrical wiring (Revised) or a rigid non - metallic
conduit conforming to *IS : 2509-1963 specification of Rigid Non-Metallic conduits for Electrical
Installations, or in a porcelain tube of such size which permits easy drawing in. The end of
conduit shall be neatly bushed with porcelain, wood or other approved material.
(c) Insulated conductors while passing through floors shall be protected from mechanical injury by
means of rigid steel conduit (see *IS 1653-1964) to a height not less than 1.5 m above the floors
and flush with the ceiling below. This steel conduit shall be earthed and securely bushed.
15.2 Where a wall tube passed outside a building so as to be exposed to weather the outer end shall be
belt mounted and turned downwards and properly bushed on the open end.
16. Fixing to Walls and Ceilings :
Plugs for ordinary walls or ceilings shall be of while seasoned teak or other approved hardwood not
less than 5 cm long 2.5 c.m. square on his inner end and 2 c.m. square on the outer end. They shall be
cemented into walls to within 7.5 mm of the surface, the remaining being finished according to the
nature of the surface with plaster of lime punning.
16.1 Where owing to irregular crossing or other reasons the plugging of the walls or ceiling with wood
plugs presents difficulties, the wood casing wood pattern, metal conduit or cleat (as the case may be)
shall be attached to the wall or ceiling in an approved manner in the case of new building wherever
possible teak wood plugs shall be fixed in the walls before they are plastered.
16.2 To achieve neatness, plugging of walls or ceiling may be done by an approved type of asbestos
metallic or a fiber fixing plug.
17. Branch Switches :
Where the supply is derived from a three-wire of four-wire source, and distribution is done on the
two wire system all branch switches shall be placed in the outer or live conductor of the circuit and
no single-phase switch or use shall be inserted in the middle wire, earth or earthed natural
conductor of the circuit. Single pole switches (Other than for multiple control) Carrying not more
than 15 amperes any be of tumbler type which shall be 'ON' when the handle known is down.
Where conductors are required to be threaded through tubes or channels formed in the metal work
of fittings this must be free form sharp angles or projecting edges and such size that will enable them
to be wired with the conductors used for the final sub-circuits without removing the boarding taping
or outer covering as far as possible all tubes and channels should be of sufficient size of permit
'Looping bank' of wires cables and flexible cords other than those designed for high temperature
shall not be used for wiring fittings except for portable fit limits. All fittings must have not less than a
half inch male nipple Fittings and lamp holders for gas filled lamps shall be adequately ventilated.
18.1 Where light fitting is supported by one or more flexible cords the maximum weight to which the twin
flexible cords may be subjected shall be as follows.
No. & Dia. inmm of Max. Permissibleweight
crosssectionalArea cord
18.2 No inflammable shade shall form a part of light fitting unless such shade is well protected against all
risks or fire. Celluloid shade or light fitting shall not be used under any circumstances.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
18.3 Fitting of wire :
The use of fitting wire shall be restricted to the internal wiring and the lighting fittings. Where fitting
wire is used for wiring, for the sub-circuit loads shall be terminated in a ceiling zone or connector
from which they shall be carried into the fittings.
19. Lamp Holders :
Lamp holders for use on brackets and the like shall be in accordance with *IS : 1258-1967
specification for Bayonet lamp holders and all those for use flexible pendants shall be provided with
cord grips. All lamp holders shall be provided with shade carriers. Where centre contact Edison
screw lamp holders are used, the outer or screw contacts shall be connected to the middle wire, the
natural and the earthed conductor of the circuit.
20. Outdoor Lamps :
External and road lamps shall have weather proof fittings of approved design so as to effectively
prevent the admission of moisture. An insulating distance piece of moisture proof materials shall be
inserted in the fittings. Flexible cord and cord grip lamp holders shall not be used where exposed to
whether in veranda’s and similar exposed situations where pendants are used, they shall be of fixed
All incandescent lamps, unless otherwise required an suitable protected, shall be hinge at a height of
not less than 2.5 m above the floor level. They shall be in accordance with IS: 418: 1957 specification
for Tungsten Filament General Service electric lamps
22. Fans, Regulators and Clamps
22.1 Ceiling fans :
Ceiling fans including their suspension shall conform to *IS 374-1960 specification for electric
ceiling fans and regulators (Revised) & to the following requirements
(a) All ceiling fans shall be wired to ceiling rouses or to special connector boxes to which fans rod
wires shall be connected and suspended from books or shackles with insulators between hooks
and suspension rods. There shall be no joint in the suspension rod. but if joints be avoidable then
such joints shall be screwed to special couplers of 5 cm minimum length and both ends of pipes
shall touch together within couplers and shall in addition be secured by means of split pins
alternatively the two pipes may be welded.
(b) Fans clamps shall be of suitable design according to the nature of construction of ceiling on which
these clamps are fitted in all cases fan clamps shall be fabricated from tested new metal of
suitable sizes and they shall be as close fitting as possible Fan clamps for reinforced concrete
roots shall be buried with the casting and due care shall be taken that they shall serve the
purpose. Fan clamps for wood beams shall be of suitable flat iron fixed on two sides of the beam
and according to the size and section of the beam one or two mild steel bolts passing through the
beam shall hold both flat irons together Fan clamps for steel join shall be fabricated from tested
flat iron to fit in rigidly to the bottom flange of the beam. Care shall be taken during fabrication
that the metal does not crack while hammering to shape. Other fan clamps shall be made to suit
the position, but in all cases care shall be taken to see that they are rigid and safe.
Note: All fan clamps shall be so fabricated that fans revolve steadily.
(c) Canopies on top and bottom of suspension rod shall effectively hide suspensions and connections
to fan motors, respectively.
(d) The lead-in wire shall be of nominal cross-sectional are a not less than 1.0 sq. mm with copper
and 1.5 sq. mm with aluminium and shall be protected from abrasion.
(e) Unless otherwise specified the clear distance between the ceiling fan and the floor shall be less
22.2 Exhaust Fans :
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
For fixing of an exhaust fan a circular hole shall be provided in wall to suit the size of the fan which
shall be fixed by the means of rag-bolts embedded in the wall the hole shall be neatly plastered with
cement and brought to the original finish of the wall. The exhaust fan shall be connected to exhaust
fan point which be wired as neatto the hole as possible by means of a flexible cord, care being taken
that the blades in the proper direction.
23. Attachment of fittings and accessories :
23.1 In other than conduit wiring all ceiling crosses, brackets, pendants and accessories attached to watts
or ceiling shall be mounted on substantial teak wood block twice Varnished after all fixing holes are
made in them. Blocks shall be not less than 4 cms deep. Brass screws only shall be used for attaching
finings and accessories to their base blocks.
24. Interchangeability :
Similar part of all switches, lamp holder, distribution, fuse board, ceiling rouses, brackets, pendants,
fans and all other fittings of same type shall be interchangeable in each installation.
25. Conduit Wiring System :
25.1.1 Type and size of conduit - All conduit pipes shall be conforming to *IS: 1653-1964, furnished
with galvanised or stove enamelled surface. All conduit accessories shall be of threaded type and
under no circumstances pin grip type or clamp type accessories be used. No steel conduit less
than 16 mm in diameter shall be used. The number of insulated conductors that can be drawn
into rigid steel conduit are given in Table II.
25.1.2 Bunching of cables - Unless otherwise specified, insulated conductors of AC supply and DG
supply shall be bunched in separate conduits.
25.1.3 Conduit-Joints-Conduit pipes shall be joined by means of screwed couplers and screwed
accessories only (*IS : 2667-1964)
Specification for Fittings for Rigid Steel Conduits for Electrical Wiring. In long distance stance
straight runs of conduit inspection type couplers at reasonable intervals shall be provided or
running threads with couplers and jam-puts (in the latter case the bare threaded portion shall be
treated with anti - corrosive preservative) shall be provided. Thread on conduit pipes in all cases
shall be between 11 mm to 27 mm long sufficient to accommodate pipes to full thread portion of
couplers or accessories. Cut ends of conduit pipes shall have no sharp edges nor any or buries left
to avoid damage to the insulation of conductors while pulling them through such pipes.
TABLE-II MAXIMUM PERMISSIBLE NUMBER OF 250-V GRADE
SINGLE CORE CABLES THAT CAN BE DRAWN INTO RIGID STEEL
(CLAUSE 6.5.1.1)
Size of cable Size of conduit (mm)
(No. of cable Max)
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
* For Cu. Conductors only
+ For Al Conductors only
Note-1 The cable shows the maximum capacity of capacity for the simultaneous drawing-in of cables.
The table applies to 250 volts grade able the columns heads 'S' apply to runs of conduit which have
distance not exceeding 4.25 M between draw in boxes and which do not deflect from the straight by angle
of more than 150. The columns headed ‘B’ apply to runs of conduit which deflect from the straight by
angle more than
Note-2 In case of inspection type draw-in-box has been provided and if the cables is first drawn through
one straight conduit, then through the drawn box, and then through the second straight conduit, such
systems may be considered as that of a straight conduit even if the conduit deflects through the straight
25.1.4 Protection against dampness - in order to minimize condensation or seat in inside the tube, all
outlets of conduit system, shall be property drained and ventilated, but in such a manner as to
prevent the entry of insects as far as possible
25.1.5 Protection of conduit against rust - The outer surface of the conduit pipes including all bends,
unions, tees junction boxes, etc., forming part of the conduit system shall be adequately protected
against rust particularly when such system is exposed to weather in all cases no bare threaded
portion of conduit pipe shall be allowed unless such bare threaded portion is treated with anti-
corrosive preservative or covered with approved plastic compound.
25.1.6 Fixing of Conduit - Conduit pipes shall be fixed by heavy gauge saddles, secured to suitable wood
plugs or any other approved plug with screws in an approved manner at an interval of not one
than one meter but on either side of coppers or bends or similar fittings, saddles shall be fixed at
a distance of 30 cm. from the centre of such fittings.
25.1.7 Bends in conduit - All necessary bends in the system including diversion shall be done bending
pipes, or by insuring suitable solid or inspection type normal bends, elbows or similar fittings or
by fixing cast iron inspection boxes whichever is more suitable. Conduit fitting shall be avoided as
far as possible. On conduit system exposed to weather, where necessary, said type fitting shaft be
used. Radius of such bends in conduit pipes shall be not less than 7.5 cm. No length of conduit
shall have more than the equivalent of four quarter bends from outlet, the bends at the outlets
not being counted.
25.1.8 Outlets - All outlets for fitting switches etc., shall be boxes, of .suitable metal or any other
approved outlet boxes for other surface mounting or flush mounting system.
25.1.9 Conductors - All conductors used in conduits wirings shall preferably be stranded. No single core
cable nominal Cross - sectional area greater than 130 mm shall be enclosed In a conduit and used
for alternating current.
25.1.10 Erection and earthing of conduit - The conduit of each circuit or section shall be completed
before conductors are drawn in. The entire system of conduit and permanently” connected to
earth conforming the requirements specified under pipe in a workman like manner for a perfect
continuity between each wire and conduit. Gas or water pipes shall not be used as earth medium.
If conduit pipes are liable to mechanical damage, they shall be adequately protected.
25.2 Recessed Conduit wiring system with Rigid Steel conduits - Recessed conduit wiring system
shall comply with all the requirements for surface conduit wiring system specified in 6.5.1.1 to
6.5.1.10 and in addition, conform to the requirements specified in 6.5.2.1 to 6.5.2.4.
25.2.1 Making of chase - The chase in the wall shall be neatly made and be of ample dimensions to
permit the conduit to be fixed in the manner desired In the case of buildings under construction
chases shall be provided in the wall, ceiling etc., at the time of their construction and shall be
filled up neatly after erection of conduit and brought to the original finish of the wall.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
25.2.2 Fixing of conduit in chase - The conduit pipe shall be fixed by means of staples or by means of
soft saddles not more than 60 cm apart. Fixing of standard bends or elbows shall be avoided as
far as practicable and all curves maintained by bending the conduit pipe itself with a long radius
which will permit easy drawing in of conductors. All threaded joints of rigid steel conduit shall be
treated with some approved preservative compound to secure protection against rust.
25.2.3 Inspection boxes - Suitable inspection boxes shall be provided to permit periodical inspection
and tofacilitate removal of wires, if necessary. These shall be mounted flush with the wall
Suitable ventilating holes shall be provided in the inspection box covers.
25.2.4 Type of accessories to be used - All outlets such as switches and wall sockets, may be either of
flush mounting type of surface mounting type.
(a) Flush mounting type - All flush mounting outlets shall be of cast iron mild steel boxes with a
cover of approved insulating material or shall be a box made of a suitable’ insulating material.
The switches and other outlets shall be mounted on such boxes as would be approved. The metal
box shall be efficiently earthed with conduit by an approved means of earth attachment.
(b) Surface mounting type - If surface mounting type outlet box is specified, it shall be of any
approved insulating material and outlet mounted in an approved manner.
25.2.5 When crossing through expansion joints in buildings, the conduit sections across the joint may be
through flexible conduits of the same size as the rigid conduit.
25.3 Conduit Wiring System with Rigid Non-Metallic Conduits:
Rigid Non-Metallic conduits are used for surface recessed and concealed conduit wiring.
25.3.1 Type and size - All non-metallic conduits used shall conform to IS: 2509-1963 and shall be used
with the corresponding accessories (See IS: 3419-1965) specification for Fittings for Rigid Non -
Metallic Conduits).
25.3.2 Bunching off cables - Conductors of AC supply and DC supply shall be bunched in separate
conduits. The number of insulated cables that may tie drawn into the conduits are ivory In Table
III. In this table space factor does not exceed 40 percent.
TABLE-III MAXIMUM PERMISSIBLE NUMBER OF 250 VOLTS GRADE SINGLE, CORE CABLE THAT MAY BE
DRAWING INTO RIGID NON-METALLIC CONDUITS
Size of cable Size of Conduits (mm)
Diameter in 16 20 25 32 40
(No. of cable Max)
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
*For copper conductors only
+For aluminium conductors only.
25.3.3 Conduit joints - shall be joined by means of screwed or plain couplers depending on whether the
conduits are screwed or plain. Where there are long runs of straight conduit. Inspection type
couplers shall be provided at intervals. For conduit fittings and accessories reference may be
made to IS : 3419-1965.
25.3.4 Fixing of conduits - The provision of 25.1.6 shall apply except that the spacing between saddles
or supports is recommended to be 60 cms for rigid non-metallic conduits.
25.3.5 Bends in conduit - wherever necessary, bends or diversions may be achieved by bending the
conduits (See 6.5.3.9) or by employing normal bends, inspection bends, impaction boxes elbows
or similar fittings.
25.3.6 Conduit fittings shall be avoided, as far as possible on outdoor system.
25.3.7 Outlets - All the outlets or fittings, switches, etc. shall be boxes of substantial construction. In
Order to mines is condensation or sweating inside inside the conduit, all outlets of conduit
system shall be properly drained and ventilated, but in such a manner as to prevent the entry of
insects, etc. as far as possible.
25.3.8 For use with recessed conduit wring system the provisions of 6.5.2.1 to 6.5.2.4 shall apply
25.3.9 Heat may be used to soften conduit for bending and forming joints in case of plaint conduits. As
the material soften when heated fitting of conduit in close proximity to hot surfaces should be
avoided. Caution should be exercised in the use of the conduit in locations where the ambient
temperature is 50o C or above Use of such conduits in place where ambient temperature is 60o C
or above is prohibited.
PVC INSULATED AND P.V.C. sheathed or T.R.S wiring SYSTEM
This system of wiring is suitable for low pressure installation and shall not be used in places exposed to
sun and rain nor in damp places. Provided they are sheathed in the special approved protective covering
and well protected to withstand dampness.
26.1 Attachment to walls and ceiling :
26.1.1 All cables on brick walls, stone or plastered walls and ceiling shall be run on well-seasoned
perfectly straight and well-seasoned, perfectly straight and well varnished on four sides, teak
wood or any approved hard wood battens not less than 10 mm finished thick, width of which
shall be such as to suit total width of cables laid on the batten, prior to election, these shall be
painted with one coat of varnish or approved paint of colour to match with surrounding. These
battens shall be secured to wall and ceilings by flat head wood screws to raw plug or Phil plug at
an interval not exceeding 75 cm. Wood plug can be used only with special approval of the
Engineer in charge. The flat head wood screws shall be counter within wood batten and
smoothed down with file
26.1.2 Where wiring is to be carried out along the face of the rolled steel joints a wooden batten
adequate width shall first be laid on the same and dipped to it as inconspicuously as
possible. The wiring should then be fixed to this backing shall be suitable bushed to prevent the
abrasion of the cables.
26.1.3 Attachment to false ceiling: In no case, the open wiring shall be run above the false ceiling
without the approval of Engineer-in-charge
26.2 Link dips: Only aluminum alloy clips/joint clips shall be used. The thickness shall be 0.32 mm (30
SWG) for lengths of 25 mm to 40 mm (28 SWG) for lengths of 50 mm to 80 mm. The width shall not
be less than 8 mm in all these cases. Link clips/joint clips shall be so arranged that one single clip
shall not hold more than two core or three single core TRS of PVC insulated and PVC sheathed up to
2.5 sq. mm above while-a single clip shall hold a single twin core or two single core cables. The clips
shall be fixed on varnished wood batten switch iron pins and space at interval of 15 cm bet in the
case of horizontal and vertical runs.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
26.3 Bends in wiring: The wiring shall not in circumstances be bent so as to form and abrupt right angle
but must be rounded off at the corners to a radius not less than six times the overall diameter of the
26.4 Protection of wiring from Mechanical Damage:
26.4.1 In cases where there are chances of any damage to wiring such wiring shall be drawn complying
with all the requirements of conduit wiring system.
26.4.2 Such protective covering shall in all cases be fitted on all down drops within 1.5m from the floor
or from floor level up to the switch board whichever is less.
26.5 Passing through floors: All cables taken through floor shall be enclosed in heavy gauge steel
conduit extending 1.5m above the floor or up to the switch board whichever is less and flush with
the ceiling below or by means of any approved type metallic covering. The ends of all conduits or
pipes shall be neatly bushed with porcelain wood or other approved material. The conduit pipes
shall be security earthed.
26.6 Passing through walls: When conductors pass through walls, anyone of the following methods shall
be employed. Care should be taken to see that Wires pass very freely through protective pipe or box
and that wires pass through in a straight line without any twist or cross in wires on either ends of
(a) A box of teak wood or approved hard wood extended through the whole thickness of the wall
shall be buried in the wall and casings or conductors and casing or conductors shall be carried so
as to allow 1.3 cm air space on the three sides of the casing or the conductor.
(b) The conductors shall be carried in. an approved heavy huge solid drawn or lap weld conduit or
in a porcelain tube of such a size that it permits easy drawing in, the end of conduit shall be
neatly bushed with porcelain, wood or other approved material. 26.6.1, Where a wall tube
passed outside a building so as to be exposed to weather, the outer end shall be mounted end
turned downwards and property bushed or the open end, the conduit shall be neatly arranged so
that the cables enter them without bending.
26.7 Buried cables: Tile TRS or PVC sheathed cable shall not normally be burring directly in plaster,
Where so specified in the special in the specification they may be taken in task wood channeling of
ample capacity or conduit pipe buried in the wall.
26.8 Stripping of outer covering: While cutting and stripping of the outer covering of the cable care
shall be taken that the sharp edge of the cutting instrument does not touch the inner insulation of the
conductors. The protective outer covering of the cables shall be stripped off near connecting
terminal and this protective covering shall be maintained up to the close proximity of connecting
terminals as far as practicable. Care shall be taken to avoid hammering on link clips with any metal
instrument after the cables are laid. Where junction boxes are provided they shall be made moisture
proof with a plastic compound.
27. PAINTING WORK IN GENERAL:
27.1 Paints: paints, oils varnishes etc. of approved make in original to the satisfaction of the Engineer -in
charge shall only be used.
27.2 Preparation of surface: The surface shell be thoroughly cleaned and dusted before painting is
started. The proposed surface shall be inspected by Engineer-in-charge or his authorized agent and
shall have received the approval before painting is commenced.
27.3 Application: Paint shall be applied with brush. The paint shall be spread as smooth & even as
possible particular care shall be paid to rivets, nuts bolts and cover lapping before drawing cut, it
shall be continuously starred, in the smaller containers with a smooth stick while it is being
applied.Each coat shall be allowed to dry out sufficiently before a subsequent coat is applied
27.4 Scope: painting on old surface is in/door Situations will not include priercoat except where specially
mentioned in the schedule of work or special specification. However, where rust has formed on iron
and steel surfaces the spots win be painted with one anti-rust primer coat.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
27.5 Precautions: All furniture fixtures, glazing floors, etc. shall be protected by covering, all stains
smears, plashing, and dropping of every kind shall be removed. While painting of wiring etc. it shall
be ensured that painting of wall ceiling etc. is not spoiled in any way.
27.6 Painting of conduit and accessories: After installation surface of conduit pipes, fittings switch and
regulator boxes, etc. shall be painted with two coats of approved enamel I paint or aluminum paint
as required to match the finish of surrounding wall, trusses, etc.
28. Link clip: The clip for batten wiring shall be of Aluminum conforming to I.S. specification No. 2415-
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Important Clauses of Indian Electricity Rules, 1956. Following clauses of Indian
Electricity Rule, 1956 shall in particular be taken care of in the execution of electrical works.
3. Authorisation:
29. Construction, installation, protection, operation and maintenance of electric supply lines and
31. Cut-out on consumer’s premises.
32. Identification of earthed and earthed neutral conductors and position of switches and cut outs
33. Earthed terminal on consumer’s premises.
34. Handling of electric supply lines and apparatus.
41. Distinction of circuits of different voltages.
42 Accidental charge.
43. Provisions applicable to protective, equipment.
44. Instruction for restoration of persons suffering from electric shock.
45. Precautions to be adopted by consumers, owner’s electrical contractors. Electrical workmen and
46. Periodical inspection and testing of consumer’s installation.
48. Precautions against leakage before connection
50. Supply to consumers.
51. Provisions applicable to medium high voltage installations.
58. Point of commencement of supply.
59. Precautions against failure of supply; Notice of failures.
61. Connection with earth, (low and Medium Voltage system.)
64. Use of energy at high and extra-high voltage system.
67. Connection with earth. (High & Extra-high voltage system)
68. General conditions as to transformation and control of energy.
All clauses under Chapter VIII on Overhead Lines.
137. Mode of entry.
138. Penalty for breaking seal.
139. Penalty for breach of rule
140. Penalty for breach of rule
141. Penalty for breach of rules.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Form of Completion Certificate
I/We certify that the installation detailed below has been installed by me/us and tested and that to the
best of my/our knowledge and belief, it complies with Indian Electricity Rules. 1956, as well as the
C.P.W.D. General Specification for Electrical Works,
Electrical Installation at Voltage and system of supply
(1) Particulars of works:
(a) Internal Electrical installation No. Total Load Type of system
(i) Light point
(iii) Plug point
(a) 3 pin 5 Amp.
(b) 3 pin 15 Amp.
(b) Others: Description HP/KW
(c) Other plants:
(d) If the work involves installation of overhead line/or underground cable:
(a) (i) Type & Description of overhead line.
(ii) Total length & No. of spans,
(iii) No. of street light & its description
(b) (i) Total length of underground cable & its size
(ii) No. of joint.
St. through joint :
(i) Description of earthing electrode
(ii) No. of earth electrodes:
(iii) Size of main earth lead:
(3) Test Results:
(a) Insulation Resistance:
(i) Insulation resistance of the whole system Megaohms.
Of conductors to earth.
(ii) Insulation resistance between the Phase conductors and neutral.
Between phase R and neutral. Mega ohms
Between phase Y and neutral Mega ohms
Between phase B and neutral Mega ohms
(iii) Insulation resistance between the phase conductors in case of poly-phase supply.
Between phase R & phase Y Mega ohms
Between phase Y & phase B Mega ohms
Between phase B & phase R Mega ohms
(b) Polarity Test:
Polarity of non-linked single pole braches switches.
(c) Earth continuity Test:
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Maximum resistance between any point in the earth continuity conductor including metal
conduits & main earthing lead.
(d) Earth Electrode Resistance Presence of each electrode.
(e) Lighting protective System:
Resistance of the whole of lighting protective system to earth before any bonding is effected
with electrode and metal in/on the structure.
Executive Engineer (M),D’cell
Signature of contractor/s
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
All Specification standard publication etc. specified mean the latest standards, publication etc.
pertaining to electrical and should conform to the following wherever applicable.
1) Indian Electricity Act. 1910 with its amendments.
2) Indian Electricity Rules 1956 and its amendments.
3) Indian Electricity supply Act
4) Regulation for Electrical Equipment in building by l.E.F. Landon.
5) The Factory Act, 1948 and its amendments.
6) I.S. 732* 1982 Part -1, II & III code of practice for Electrical wiring and fittings in buildings for low
and medium voltages
7) I.S. 4064-1976 H.D. Air break switches and fuses for-Voltages not exceeding 1100 volts.
8) I.S. 3043 - Earthing code of practice for
9) I.S. - 1554 Part-11970 PVC insulated (Heavy duty) Electrical Cables for working voltages upto and
including 110 volts
10) I.S. 694-1964 Part-II - PVC insulated cable with Aluminium conduits (revised) for voltages upto
11) I.S.: 5908 -1970 - Electrical installations in buildings method of measurements of.
12) I.S.: 4237 -1967 - General requirement for switchgear and control gear for voltage not exceeding
13) I.S.: 1653 -1964 - rigid steel conduits for electrical wiring (revised)
14) I.S.: 2509 -1973 - Rigid steel conduits for electrical installation (First revision)
15) I.S.: 1258 -1967 - Bayonet landholders (First revision)
16) I.S.: 418 -1957 - Tungsten - Filament General service-electric lamps (Third revision)
17) I.S.: 374 -1966 - Fans and Regulators, ceiling type, electric (second revision)
18) I.S.: 2667 -1964 - Filings for rigid steel conduits for electrical wiring.
19) I.S.: 3419-1976 - Fining for rigid non-metallic conduits (First revision)
20) National Electric Code,
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Abstract of the Wiring Rules of the Institution of
Electrical Engineer
(Referred to in the specification)
DEFINITIONS (See clause 2 of the specification)
All electrical system in which all the conductor and apparatus are electrically connected to a
common source of supply.
1) Earthed: Effectually connected, to the general mass of the earth. Solidly earthed without the
Intervention of a fuse, switch, circuit - breaker, resistor reactor or solenoid.
2) Un-insulated Conductor: A conductor without provision, by the Interposition of a dielectric or
otherwise for its insulation from earth.
3) Bare: Not covered with insulating material.
4) Dielectric: any material which offers high resistance to the passage of an electric current.
5) Bunch Conductor: When more than one conductor is contained within a single duct or groove or
when they are run enclosed and spaced and not spaced apart from each other;
6) Points: In wiring as per IS: 5908 -1970 - Method of measurements of electrical installation in
7) Switch board:An Assemblage pf switchgear with or without instruments, but the term does not
apply to a group of local switches in a final sub- circuit where each switch has its own insulating
Note: In the electricity (Factories Act) special regulations, 1908 and 1944 the term “Switchboard”
includes “Distribution board.’”
8) Single pole switch: A switch suitable for closing and or opening a circuit on one phase or pole
9) Linked switches: A switch the blades of which are so linked mechanically as to make break all
poles simultaneously or in a definite sequence.
10) Fuse Switch: A switch the moving part of which carries one or more fuses.
11) Three Wire System :
a) Outer Conductor: Those between which there is the greatest difference of potential. This
use of the word outer must not be confused with the use of the work when applied to the
external conductor of a concentric main.
b) Neutral Conductors: The term includes the neutral conductor of a 3 phase 4 wire system,
the conductor of a single phase or d. c. installation which is earthed by the supply
undertaking (or otherwise at the source of the supply) and the middle wire or common
return conductor of a 3 wire d.c. or single phase a.c. system.
12) Semi enclosed machine: One in which the ventilating openings in the frame are covered with -
a) Girds expanded metal or wire gauche, with openings of less than 1/4 Inch but not less than
so as to obstruct free ventilation.
b) Wire gauge. in which the openings are less than 1/4 inch but not less than 3/32 inch
(diameter or width):
c) Screens with smaller openings than the above.
13) Totally - enclosed Machine:
One in which the enclosing case and bearings are dust proof and which does not allow circulation
of air between the inside and outside of the case.
14) Pipe Ventilated Machine: An enclosed machine in which, the frame is so arranged that the
ventilating air may be conveyed to it through a pipe attached to the frame the ventilation opening
maintained by the fanning action produced be the machine itself.
15) Forced draught machine: An enclosed machine in which the ventilating air supply is maintained
by an independent fan external to the machine itself.
16) Protected Machine: One having end shall bearings and in which is free access to the interior
without opening doors or removing covers.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
SWICHES AND CIRCUIT BREAKERS
(See clause II of Specifications)
17) Switches and Circuits Breakers:
Switches and circuit breakers (rules 2b. 36 and 37) whether fixed separately or combined with
lamps, holders of fittings, must comply with the following requirements:
(a) Overheating must not take place at the point of contract or elsewhere, when the full current
flows continuously.
(b) They must be so constructed or arranged that the contracts cannot accidentally close when
(c) The basis must be of incombustible, no conducting and moisture proof material.
(d) Circuit breaker as must be so arranged and placed that no combustible material is
endangered by their action.
(e) Unless placed an engine room or in compartment especially arranged .for the purpose, they
must their live parts covered. The covers must be incombustible material and, must be
either non-conducting or of rigid metal and clear of all internal mechanism. For more than
amperes, ai pressures exceeding 125 volts metal covers must be lined with insulating
(f) In positions where they are liable to injure or come into contract with goods, they must be
further protected by an open fronted box or other suitable guard.
(g) Handles must be insulated so arranged that the hand cannot touch live metal, or be injured
through and adjacent fuse blowing.
(h) Switches having a handle protecting through an, open slot in the cover, must not be used.
Executive Engineer (M),D’cell
Signature of contractor/s
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
GENERAL REQUIREMENTS
1.1 Scope of works:
The work covered by electrical specification consists supplying and installing, electrical wiring
system complete in strict accordance with this specification and the applicable drawing and
subject to the terms and conditions of the contract. / It includes.
(a) Conduit and wiring system for fans, lighting points bells, clocks sockets, etc. including fixing of
lighting fixtures and fans etc. and miscellaneous points.
(b) Conduit and wiring system for exhaust fans, power sockets etc.
(c) Panel boards, distribution boards, switch fuse units.
(d) Complete power and lighting cable systems.
(e) Grounding system.
(f) Conduits system.
(g) Street lighting system.
(h) Other miscellaneous electrical work.
1.2 Completeness of Contract;
Any work fittings accessories or apparatus which may not have been specifically mentioned in
the specification but which are necessary in the equipment for efficient working of the plant
should be deemed to be included in the contract and should be executed and provided by the
contractors. All plant and apparatus should be complete in all the details, where such details, are
mentioned in the specifications or not.
Three prints and one permanent negative of each of the finally approved drawings incorporating
all the modifications proposed by the Department should be submitted. No modifications should
be made in a drawing already approved by the Engineer-in-charge without his prior consent.
Approval of the contractor’s drawing will not relieve the contractor of any part of his obligation
to meet all the requirements of .the contract.
The performance of all the equipment’s and the installation should be guaranteed at least a
minimum period of one year from the date of taking over the installation by the Department. All
equipment’s must comply with the relevancy IS-BS specifications.
1.4 Interchangeability:
All corresponding parts of similar plant and equipment should be interchangeable in every way.
All special tools required for dismantling and assembly of the equipment covered by the contract
shall be supplied as obligation under the contract.
A list of to be supplied by the Contractor should be submitted along with the tender.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Specifications for Electrical Installation in Buildings
1.1 These specifications relate to the electrical installations in the buildings of P.W.D. Electrical. The
specifications cover general requirements to be fulfilled. These general specifications are
supplemented by the specifications for the particular buildings separately attached.
1.2 These specifications are governed by the General conditions of the contract attached hereto.
1.3 APPLICABLE RULES AND REGULATIONS:
1.3.A Installation shall be carried out IN conformity with regulations for electrical equipment’s of
buildings, published by the Institute of Electrical Engineers London (14th Edition 1966 and as
amended up to date) herein after referred to as the I. E. E. wiring regulations Where these
specifications, or the special specifications for the particular building attached hereto are at
variance with the I.E.E. regulation these specifications or special specifications as the case may
be,shall also be followed. The installation shall also comply with the requirements of the Indian
Electricity Act, 1910 as amended up to date rules issued there under and also the regulations for
the Electrical Association of India Where not specified otherwise, the installation should
generally follow the Indian standard codes of practice and in their absence the relevant British
Standard of practices. All the materials shall comply with the relevant Indian Standard of British
Standard specifications
1.4 DEFINITIONS:
1.4.A The definitions of terms in the I.E.E. Regulations shall apply in general.
1.5.A The preliminary drawings only indicate the general scheme of requirement. The exact position of
all points, control switch boxes, runs of wiring and/or conduits joint boxes, inspection boxes,
Mains, and sub-distribution boards, mains etc. shall be got approved Engineer-in-charge. All
circuits shall be clearly numbered in wiring diagrams and building plans. The detailed design of a
switch-board, special fixture or any other part of the electric installation as may be called for by
the engineer-in-charge shall also be supplied by the Contractor and should be got approved by
the Engineer-in-charge. Three sets of completion drawings and wiring diagrams showing the
installations as executed shall be supplied by the contractor along with the completion certificate.
All materials shall be new and of the best quality conforming to the relevant I.S.B.S. specifications.
They must be the products of reliable manufacturers of many years or standings. All like parts of
materials shall be interchangeable. In case of equipment’s such as circuit breakers; switch fuses
etc. a descriptive and illustrated literature shall accompany the tender. The names of
manufacturers’ of various materials shall be furnished in preform in Appendix-1. Samples of
materials wherever required should be deposited with the Engineer-in-charge. All materials shall
be rust-proof or rendered rust proof by application of suitable paints. The supply of all
equipments, switchgears etc. shall be complete with accessories filings and mountings as may be
required for their proper performance, and as specified in the relevant IS-BS Code of Practice and
1.7 WORKMANSHIP:
1.7.A Good workmanship and neat finished appearance are the prerequisites for complying with the
clauses of these specifications. With a view to ensure fine workmanship the Tenderer shall
employ licensed wiremen with an experience of not less than 5 years in the type of work they are
engaged. The work should be done under supervisions of licensed Electrical Supervisors with
good educational qualifications and considerable experience.
1.7.B Tenderer shall furnish the names of Supervisor and their wiremen, who will be engaged in this
work, with details of their experience.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
1.8 CO-OPERATIVE WITH CIVIL AND OTHER WORKS CONTRACTORS:
1.8.A The Tenderer after the award of the contract, shall co-operate with the civil and other
contractors and shall coordinate his work of the other contractors with the least amount of
dislocation and interference to the other works. Tenderer shall go through the drawings carefully
and shall furnish the Engineer-in-charge with all the details of openings in the walls etc. they may
be required for concealing any of the electrical equipments or accessories. Where the contractor
fails to furnish such information as may be required for the purpose of concealing the
equipments etc. they shall be made at his (Contractor) cost and expense. Any alteration to parts
of the building shall be made good at the contractor’s expense and brought to the original shape
finish and colour.
The electrical contractor shall be completely responsible of the testing and commissioning of
those installations covered by these specifications in compliance with the standard procedure, in
obtaining permission of the Government Electrical Inspector. Any modification which is
demanded by Government Electrical Inspector shall have to be carried out within the scope of
the contract. The contractor shall submit four copies of drawings of installations as per
regulations for shall be provided by the contractor for carrying out the Installation work. All test
shall be carried out in the presence of the Engineer-in-charge or his authorized representative
and his approval obtained for the test results.
1.10 COMPLETION CERTIFICATE AND MAINTENANCE GUARANTEE:
1.10.A After the completion of the installation and contractor should furnish a certificate in the
preforma in Appendix-III, at the time of taking over the installation by the Department. The
installation shall be guaranteed for period of 12 months from the date of taking over by the
Department. During the period of guarantee all defects in material or workmanship shall be
rectified or replaced free of cost to the Department.
1.11 TENDERER’S ABILITY :
1.11.A In order to enable the Department to assess the ability of the Tenderer to execute the work, the
Tenderer shall furnish evidence of his experience and capacity to carry out the magnitude and
1.12.1. The rates of items shall include all traces, transport, loading and unloading charge and all such
charges that may be required to be incurred for the supply and installation of materials at site.
The rates shall be firm and variations in the market are not entertained Break up figure as
required in the schedule of work shall also be furnished. As far as possible indigenous materials
only shall be included for supply. Where it is unavoidable, imported items may be included and
Tenderer should dearly indicate materials, quantity, rate and amount of these items.
1.13 STORAGE SPACE:
No covered storage space will be provided-by the Department. The contractor has to make his
own arrangement. However, the Department may give an open space near the place of execution
where the contractor can build his own stores for executing the work.
1.14 DEPARTURE FROM SPECIFICATIONS:
The Tenderer should clearly indicate departure, if any from the specifications with reasons for
1.15 EXTRA ITEMS:
Rates for extra items shall generally be derived from the rates already available in the schedule.
Where it is not possible, the rates shall be mutually agreed upon and contractor shall furnish a
detailed analysis of the rates claimed by him.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
2. TECHNICAL SPECIFICATION:
2.1 Supply System:
The wiring installation shall be suitable for 3 phase 4 wire, 400-440 V 50 cycles system of supply
Colour code of different phase shall be followed as per standard.
2.2 Wiring for Light and Fans:
Looping system to wiring shall be adopted. No joints shall be made at intermediate runs of cables
and where they are unavoidable such joints shall be through approved mechanical connections.
2.2.1 Point wiring:
Point wiring shall consist to the branch wiring from the board together with the controlling
switch or push as far as and including the ceiling rose or any other approved connector or socket,
outlets. In case of more than one light being controlled by one switch, the wiring up to the ceiling
rose of the first light including the switch shall be considered as a Primary point. Loop wiring
from light shall be considered as a’ Secondary’ point and rates shall be quoted separately,
including final connections to fixtures and plugs.
2.2.2 Conductors:
No conductor for final sub circuit wiring for light and socket outlets shall across-section less than
that of 2.5 sq.m (aluminium)
No final sub-circuit radiating from the fuse board of a sub-distribution board and wires with
sq. m. (AI) cable shall carry more than 10 lights, fans or socket outlets or a connected load of
watts whichever is greater. The following wattages may be assumed for estimating the load on
each sub-circuit unless otherwise known or specified.
Incandescent lamps 100 watts
Ceiling fans 60 watts
5-A Socket Outlets (lighting) 100 watts
4. ft. fluorescent tube 50 watts
5. ft. fluorescent tubes 100 watts
In each sub-distribution board at least-one way preferably two ways shall be left spare for future
requirement. A wiring diagram giving the exact Utilization of the ways shall be prepared and
fixed in the sub-distribution board itself or any other easily accessible place. The ways of sub
distribution boards shall be accordingly numbered.
2.2.4 Local Control Switches (General) :
Local control switches for circuit carrying net less than 5-5 shall be piano type and shall conform
to relevant I.S. Standards. The switch shall be ”ON’ when the knob is in the down position. All
local control switches shall be connected in the phase or live conductor only and not in the
neutral conductor, switches shall be fixed in iron clad box and shall is so placed that the Centre of
the switch box is 1.3 Mtr. from the finished floor level unless otherwise
stated. All switch boxes shall be provided with 1 /8" thick Perspex cover fixed to the switch box
with chromium plated counter sunk screws (brass).
2.2.5A Switches (Two Way) :
a) Two way swatches shall be piano type single pole, double throw, 250V, suitable for flush
mounting and of 5A capacity as per the drawings. All switches shall be recessed in an
embedded metal box.
b) Each box shall have suitable outlet for fixing conduits directly.
c) Each box shall have Perspex cover painted inside with the wall color, if required.
d) Each switch shall have suitable for the position in a corridor stairway wiring.
2.2.5.B Switch Boxes (General)
Electrical circuits shall be written suitable on the cover of all switched boxes, as approved by the
Engineer-in charge (elect) whenever different phase are terminated in a switch box Bakelite
partition shall be provided. Each cash shall be provided with a G.I. Earth stud nut and washers for
earth connectors.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
2.2.5 Ceiling Rose:
Ceiling rose shall be used on circuits having a normally exceeding 200V. Only one flexible cord
shall be attached to a ceiling rose. Only 3-pin 5A socket outlet shall be provided in lighting
circuits. All socket outlets be provided with a control switch and they shall be mounted in switch
boxes in an approved manner.
2.2.6 Fittings:
These shall be of approved type as specified in the tender schedule. The sub circuits leads should
terminate in a ceiling rose or conductor in the fitting and internal connection made there from.
Wherever these fitting are suspended they shall be done so through the conduits and ball and
socket joint. All fittings shall be grounded by a G.I. conductor not less than 16 S.W.G.
2.2.7 Flexible wiring:
Flexible cords of not less than .23/0076 size be shall be used, The weight of suspension road shall
be governed by I.E.F. Regulations.
2.2.8 Ceiling Fans:
All ceiling fans shall be wired to ceiling rose and suspended from a hook shackle or clamp and
insulated from the same. All joints in the suspension, road shall be screwed and means of split
pins. The fan clamps supplied by the Contractor shall be suitable for the ceiling or proof member
as the case may be For concrete roofs, fan hooks shall be buried in concrete during concrete
during construction in an approved manner and secure bound to the reinforcement.
2.2.9 Conduits and Earthing:
All conduits feeding lighting and circuits shall be provided with earth continuity G.I. conductor as
specified for power wiring. All conduits shall be as specified for power wiring.
2.3.1 Point wiring:
Point wiring power shall be as defined under section 2.2.2 and shall include the switches and
All distribution board for power wiring shall be not less than 15 A per way. Loading per way shall
not exceed normally 100 watts. The following loads may be assumed if exact figure are not
3-Pin 15A Outlets 1.000 Watts
3-Pin 5A Outlets 100 Watts
2.3.3 Wiring for Motors :
2.3.3.1 Final sub-circuits loop in motors shall be connected to separate ways of the Distribution board
even if the current in the sub-circuit is less than 15A. No looping is permissible.
2.3.3.2 All wiring shall be carried in H.G. conduit as specified in I.S. specification for gauge for different
sizes of conduit. When the motor is resiliently mounted fixable with approved adopters shall be
used for the last few feet. Where cables are used sufficient loop shall be left.
2.3.3.3 All switch fuse units controlling circuits feeding motor .shall be provided with H.R.C. fuses or as
2.3.3.4 The frame of every motor and its association contra gear shall be earthed by two separate and
distinct connections to earth connector shall be capable of earring 3 times the rating of fuse or
1.1/2 time the setting or the circuit breakers but in no case than NO.8 S.W.G. or 7064" or
equivalent cross section of copper. Where practicable, the earth connections shall be visible for
periodical inspection. Gas or water pipes shall not be used for earth connections.
2.3.3.5 Socket Outlets and Control Switches f A and 15A :
All socket outlets shall be of 3 pin type, the third pin being connected to the earth stud of nearest
distribution board by separate earthing wire: The socket shall conform to I.S.: 1293/1938,’single
pole, piano type. Each socket pubets shall be provided with a control switch of appropriate rating
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
and as specified. The switch and socket shall be mounted inside the iron clad box provided with
1/8” Perspex cover as directed by the Engineer-in-charge or as specified in schedule of
quantities. Inside switch box ample space shall be available around switches for connection wires
to switches. All socket outlets for power shall be mounted at the skirting level otherwise
specified or as directed by the Engineer-in-charge.
The three phase plug receptacles shall have their earth terminals connected by independent
earth wires to ring main strip on the building. In buildings where explosion proof fixtures are
installed single phase plug receptacles as well as light points shall be connected to ring main
ground bus installed in the building by separate earth wires of approved size.
Socket outlet shall have some provision not to receive the matching plug unless the grounding
pin is in correct position. The grounding pin of the plug shall make the contract first and break
the contract last at the time of inserting or removing the plug respectively.
The grounding terminal shall be connected to the enclosed metal body providing G.I.Stud, nut
washers welded to the box.
Each unit shall be suitable for flush mounting as required and indicated in the applicable
Combination unit socket outlet and switch shall be complete with necessary internal wiring. The
switch/socket shall be mounted on M.S. bracket enclosed in a box.
2.4 Conduit Wiring:
2.4.1 Where conduit wiring is adopted type and size of the conduit shall be as indicated in the drawing.
The minimum of the conduit shall be 19 mm.
2.4.2 The contractor shall thoroughly study the structural arrangement of the buildings and wherever,
necessary shell in consolation with Department’s representatives at site, make suitable
adjustments in the cable routings, earthing arrangements, and location boxes, fitting etc. with a
view to avoid interference with any part of the building, structure, equipment or any other work
in the building or to effect any improvement in the arrangement.
2.4.3 Protection of conduit against rust:
Conduit shall be given two coats of oxide paint before they are placed in position. All exposed
conduit shall be planed after installation with the colour as approved by the Engineer-in-charge.
This do not apply to galvanized conduit.
2.4.3.A.Protection against insects arid damp:
In Order to minimize concentration or sweating inside the conduit, system shall be properly
drained any ventilated in such a manner as to prevent the entry of insects.
2.4.4 Conduit shall first be installed as a complete system without cables and shall be continuous from
outlet to outlet from fitting to fitting and mechanically and electrically connected to all boxes and
2.5 SPECIFICATION FOR POWER CONTROL AND TELEPHONE CABLES:
i. The specifications cover the supply and medium voltagePower and control cables either in
ground or trench depending on the conditions at sate including accessories for the same. The
work in general, consists of supplying, laying jointing terminating and connecting at. 1.1. KV
APLSTS PVC power and control cables.
ii. The contractor shall supply all accessories including jointing and terminating materials,
compound, tapes supporting materials, cleats cables lugs, concrete stable, bricks sand, cable-
markers etc. as required to make the installation work including digging and filling of the
trenches as required.
2. SPECIFICATION:
i. All power cables to be supplied mentioned as ‘APLSTS’ in the Schedule should be mass
impregnated, non-draining, paper insulated lead sheathed, double steel tape armoured and
must comply with the latest IS1BS specifications.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
ii. All cabling materials such as cable compound, cable lugs, taped shall be of approved quality
acceptable to the type recommended by the manufacture of the cable for which it is used and
approved by the Department.
iii. installation of all equipment shall also conform to the applicable. Codes and practice as per
the IS and shall be executed to comply with the latest Indian Electricity rules as regards the
safely, payable of equipments and other essential provisions specified therein.
iv. Only approved make of cable shall be used. ICC and CCI will be preferred,
v. The cables shall generally be laid as per is Code of practice.
3. GENERAL RULES CABLE LAYING:
i. Installation shall be carried out in a neat workmen like manner by skilled experienced and
competent workmen in accordance with the standard practices.
ii. Cables shall be laid preferably in one length to avoid joins. If straight joints are found-
necessary, these can be introduced with prior approval of the Engineer-in-charge. The cost of
the straight joint however, shall not be borne by the Department. But in no case joint shall be
within the conduit G.I. pipe and duct.
iii. Proper care should be exercised in handling the cable to avoid formation of kind etc. and
should it become necessary a cable be bent to a radius not less than 20 times the overall
diameter of the cable.
iv. Method of installation, routing of cable etc. shall in every case be subject to the Department’s
approval and the contractors shall modify and or certificate no extra cost to the
Department’s any portions of the installation which do not meet with the Department’s
approval. All damages to the civil and other works on this account shall be made good by the
contractor at no extra cost to the Department.
The electrical contractor while notifying the building contractor for such work shall furnish
the proper draws, dully explaining the work involved of indicate at suit actual work to be
carried out as may be required by the building contractor. The electrical of any such work as
the electrical work with this to the same has been completed.
v. Where cables pass through huge pipes, contractor shall fix hard wood bushed round the
cables at the ends of huge pipes. Where the cables pass through the floors or chambers and
in such situation’s the Engineer shall require, the contractor shall seal cable holes in a
manner approved by Engineer-in-charge. Where cable pass through roads nallahs etc. cables
must be protected by class ‘A’ Hume pipe of diameters not less than 6”. (15cms).
vi. The cable routs shall be the shortest and these shall be minimum inference with built up
areas, lawns etc.
vii. Care shall be exercised for providing suitable props other service lines on earth at the time of
excavation. Where cutting of a lawn inevitable it should be with the approval of the
Engineers-in-charge.
viii. Excavation of the trenches shall be executed with vertical sides and the trenches shall be
kept as straight as possible. The exact location of each trench shall be settled by the
Engineer-in-charge. On the site when the contract is in a position to commence each portion
The trench shall be not less than 1/2 meter wide and 90 cms deep. If more, cables are to be
laid the width should be suitably increased.
ix. After the cables are laid, the trench shall be filled in layers, the each layer being weal rammed
by spraying water and consolidated and sufficient alliance made for settlement. The extra
earth over the trench should be removed from the place of trench to a place as decided by the
Engineer-in-charge at site.
x. Ends of cables shall be property sealed to prevent entry of moisture prior to installation.
xi. Where it is as specified as 1/2 core cables the 1/2 core shall be a neutral conductor having
reduced section.
xii. For all multi core cables each core and tails shall be brought not, marked and or coloured in
on approved manner.
xiii. Cables termination shall be done with suitable compression brass glands in the case of PVC
cables and cast iron trifurcating boxes in the case of APLSTS cables. The Armour should be
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
connected to the right main earth building with duplicate earth wires as per the relevant
IS/BS specification.
The core insulation over each conductor shall however be retained throughout the run of
the conductor up to the end where lung shall be fitted thereon for connections. The lungs
shall by fitted by means of approved solder and flux such as a leap and Eyre NO.7 liberally
used. The joint shall be mechanically strong and pressure tested.
2.6 DISTRIBUTION BOARDS AND PANELS.
General Requirements :
2.6.1 All distribution panels shall comply with IEE. Rules 60-61. A clear distance of 0.91 b meter in
front of the switch board shall be kept. Where bare connections of attachment are provided at the
back of the switch board the space behind the panel shall either less than 0.299 meter or more
than 0.762 main width there shall be a passage way from the furthest outstanding part of any
attachment or conductor. If the space behind the switch board exceeds 0.70 main width there
shall be a passage way from either end of the switch board clear to night of 1.928m width
m. All wiring connection shall be made neatly and securely.
2.6.2 For crocoite’s carrying more than 10 Amps, tinned cable sockets shall be used, all connections
shall be so made as to form their own diagram Circuit shall be clearly numbered to correspond-to
wiring diagram. Names of the distribution boards shall be painted as directed by the Engineer-in-
charge. All the switch fuse units and isolators D.Bs. shall be complete with earthing studs lugs
neutral bar ink. H.R.C. fuses and of approved make.
2.6.3 Skeleton type panels shall have rigid form work adequately braced and supported. The switch
and distribution boards shall be neatly arranged in the frame. The details of the frame work and
the arrangement of switches shall be got approved by the Engineer-in-charge before the panel is
2.6.4 All cubical type panels shall have rigid supporting frames adequately braced over which sheet
metal shall be nearly secured. All switches distribution boards etc. shall be neatly arranged on the
panels and all connections made from the back of switches. The panels shall be rendered dust
and vermin-proof. The interior of the panels shall not be accessible to unauthorized persons.
2.6.5 The recess type boards shall .be embedding wall in –a cupboard with a metal hinged door with
locking arrangement. In all recessed conduit work all distribution boards shall be recessed.
Where recessing is not possible, free standing panel may be provided as approved by the
Engineer-in-charge.
2.6.6 All individual components i.e. switch fuse units D.Bs. etc. shall be connected by earth connected
by earth continuity wire of appropriate size with the main earth bus of the D.B.etc.The panel
switches of D.Bs. shall be earthed by the less than 2 distinctive paths to earth. Earthing of metallic
parts of exposed metal shall not be effected through any structural metal work which houses the
installation. Where metallic parts are not required to be earthed and are liable to become alive
should the installation of the contractor become defective such metallic parts shall be separated
by durable non conducting
malarial from any structural work.
(a) Power panels shall be 3 phase, 4 wire, 400.230 volts for the distribution of 3 phase or single
phase power loads. Lighting panels shall be 3 phase 4 wire 400/230 volts for single phase
lighting load distribution on all 3 phase.
(b) All panels shall be done of protected front type with no mechanical or electrical defects.
(c) Bus bars shall be of electrolytic copper or aluminium as specified and the properly tinned sizes as
indicated on applicable drawings as required.
(d) All knock outs for branch circuits entries shall be drilled and filled as required, for lighting panels
the top and bottom cover plates shall be. removable type.
(e) Main disconnect device for all panel boards shall be of switches of disconnect type and of the size
as indicated shall be mounted directly below the panel or through a short thread conduit of
(f) The main disconnect for all panel boards shall have an entry suitable for PVC armoured cable
(g) All panel boards shall be provided with an earthing terminal and lug for connection to the
grounding system.
(h) Temperature rise of all electrical parts shall not be more than 300c With full load amperes at
room temperature.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
(i) Buses shall be securely supported so that ordinary vibration will not cause any of the parts to
(j) All barriers and supports of current carrying parts shall be of moisture resistant insulating
material and shall not be adversely affected by arcing.
(k) The locations of panels shown in the drawings are only tentative; panels may be located at a
place approved by the Engineer-in-charge.
(l) All civil works connected, with fixing such as grouting chasing and making good shall be the
Tenderer responsibility.
(m) Wires adequate capacity with proper size of lugs shall be used for inter connections.
(n) Panel should be self-supported on angle channel iron frame work. It should be preferably of
bolted construction in case of transportation and flexibility. The frames shall be of the required
size for the mounting of the equipment on it. It shall be bolted or grated rigidly after levelling and
(o) The cupboard and D. B. should be of such size so to be accommodated in the existing room as per
I.S. rules and I.S. codes of practice for installations of Medium voltage switchgear.
(p) Fabrication drawing showing the detailed dimensions and panels and its components indicating
the frame work, earthing positioning of switches. D.Bs. cable boxes, adopter chambers etc. shall
be furnished to the Engineer-in-charge for his approval. All material to be got approved by the
Engineer-in-charge. Panel should be guaranteed for satisfactory operations for a period of one
year after handing over.
(q) The panel should be painted with anticorrosive paint suitable for humid and salty atmosphere on
two coast to primer.
SWITCH GEARS, POWERS PANELS D.B. AND S.F. U.S.
2.6.8 The main bus bar shall have continuous current rating as specified with neutral bar having half of
full load rating of the phase bus bar. The size of the bus bars shall be so selected that the current
density in bar does not exceed 150 amps. Per sq. m. for copper. The length of bus-bar chamber
should be as suitable length to fix all the switches etc. as per the prevailing standards, clear
spacing of two adjacent buses shall be 1 1/2" minimum bar should be taped all along with color
coated 11KV grade PVC tape. The maximum internal of support for each unsupported length shall
The bus bar shall be air insulated extensible type rectangular one. The bus bars chamber shall be
dust tight by providing gaskets secured property so as to tender it verity proof.
The combination fuse switch unit should comply with IS 4064 BS 861 and BBS 2510 wherever
applicable. It should be suitable to accommodate High Rupturing capacity cartridge Fuse links
complying with IS 2208 or BS 88 and having a certified rupturing capacity of not less than’
MVA at 440 volts (AC5 duly). The switch gear (pans D, Bs. etc. shall be installed generally as per
is-Part -1 3072 and as specified and shown in drawings.
All fuse switch units shall be provided with, non-deteriorating HRC fuse links complying with IS
2208-1962 and having rupturing capacity of 35 MVA at 415 volts or as specified.
All switches above 60 amps, rating shall be provided with suitable size adapted boxes. All
switches mounted-on the top of the bus bars shall be provided with detachable type reverse
entry adapter boxes. Suitably engraved tables shall be provided for each circuits as well as for the
A meters sector switches and LMH meter shall be provided where. specifically mentioned. Small
wiring for the inter-connecting shall be colour coded and provided with numbered fuses for easy
identification of circuits.
(a) The distribution boards should be totally enclosed metal clad complying with B. S. 214. the
M. S. sheet steel enclosures for recessed D. Bs. shall be of not less than 14 gauge.
(b) The D. B. shall be with hinged door and the locking arrangements as approved by the
Engineer-in-charge.
(c) All the components shall be enclosed in the enclosure. The mounting of D. B. shall be got
approved by the Engineer-in-charge before carrying out the installation.
(d) The D. Bs shall have proper side-cut outs for conduits entry or cable entry as required and
these shall be made on site
(e) Adequate spacing shall be provided inside the D Bs. for easy removal of the fuses and carry
out the interconnection.
(f) A set of insulating barriers have to be provided between incoming breakers switches and
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Switch fuse Units:
(a) All the D.P.T.P. and T. PN. Switch fuse units shall be totally enclosed iron a clad quick make,
quick break type to best Indian make conforming to the I.S. or S. 3185 specifications. All the
switch fuse units shall have mechanical Interlock with a door so that the door so that the
door cannot be opened when the swatches are in ON position. The switch should be of
double break solution type to ensure safely.
(b) Each T.P & T.PN switch fuse unit shall be earthed with two distinct each connections.
(c) Suitable insulator shall be provided between phase.
(d) There shall be suitable natural link in the fuse box.
(e) All T.P and T.PN: switch fuse units snail be rated for 500 volts and D.P, (required for single
phase supply) and S.PN. switches for 250 volts.
(f) The H.R.C. cat ridge fuse shall conform to H.S. 88 (1952).
The O.C.Bs. ACSB shall be suitable for 400/440 volts 3 phase 50 cycle supply capable of
interrupting a fault MVA of not less than 31. The circuit breaker shall conform to the BSS-936
1940. BSS 3659 with such tripping arrangement as many as required under special
specification is for the building. Efficient and fool - proof mechanical interlocking shall be
provided for the safe operation and maintenance. The rate be inclusive of the first filling of
2.7 Instrumentation:
Tile instruments and meters wherever necessary shall be housed in special sheet steel box
located between switch fuses units and bus bar chambers. The instruments etc. shall be mounted
on the hinged cover with heir dial flushed. All instruments shall have protective H. R.C. fuse links.
All interconnections and small wiring shall be neatly dressed arranged and duly colored 10r easy
identification of circuits.
Meters shall be provided as required in the Schedule, Meters shall be dead head and be suitable
for 400/ 440 volt 3 phase 4 wire 50 cycle (in balanced load) supply.
Each selector switch shall be 3 point and of minimum 250 volts grade with silver tipped contact
suitable for metering circuits, current transformers shall be of 5VA burden and commercial
metering accuracy. Indication lamps shall be penal mounting type preferably of 250V grade.
Every unit shall be prewired and interconnected to the system for its required indicating
performance. Indicating lamps shall have independent circuit fuse.
2.8 FIXING OF LIGHTING FIXTURES:
1. Location of fixtures their manner of fixing mounting height etc. are indicated in relevant
drawing. Actual location and levels shall however be arrived at site in co-ordination with
other service etc. and prior approval of the Engineer-in-charge regarding the actual location
Manner of fixing shall be obtained before the work is taken up in hand.
2. In all cases the contractor shall provide necessary interconnection wiring earthing painting
etc. all necessary for complete installation. The contractor shall also test and commission the
fixtures during completion of the work.
3. General arrangement of fixtures layout is indicated in drawings. Care shall be taken to see that
all light fixtures are in a row in a room or particular area, are in absolute line and plump and
are symmetrically disposed with respect to finished surfaces of walls, columns beams etc.
4. The inter-connections wiring from the light outlet point up to the fixture shall be carried out
by means of flexible copper wire of section not less than 1.5 mm2.
5. All fixtures suspended by means of conduits shall be done with all and socket joints or as per
approved design.
2.9 Telephone system:
1. Empty conducing shall be done recessed or exposed to surface along with pulls boxes,
junction boxes and telephone outlet boxes, in areas. and location as indicated in the relevant
drawing as per materials and methods as described in regard to conducting under section
"Wiring in conduits” except the G.I. pull wires of gauge not less than 20 SWG shall be dept.
pulled through conduits in all sections so that in future telephone wires can be pullet easy.
2. Location shown on the drawing are proximate and final location shall be decided in the field
by the Engineer-in - charge.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
SPECIFICATION FOR EARTHING & Installation of Earthing Plates:
All installation of earthing shall conform to Indian Electricity Rules, IS - 3043 latest edition and I.E.E.
the copper earth plates should be tinned before installation. the earth plates of copper 60 cm x
cm x 3.515 mm thick size as mentioned in the schedule be in separate pits at least 150 cms to
cms. away from the building at a depth necessary to reach moist earth surface but with a minimum
depth of 2.5 Mtr from the finished ground Level up to the top vertical dodge of earth electrode. The
earth plate shall be thoroughly cleaned to remove all dirt from the surface and be tinned property
for electrical contact with the main ground. Each earth pit should be provided with 38 mm. dia . G.!.
pipe 2.5 Mtr .long or more depending up to the depth of pit, put over the vertical edge of earth plate
(with top end of pipe provided with a closed to couyler.) Alternative layers of salt and coke shall be
provided surrounding the plate. The pits shall be filled when the plates are in position and with the
approval of Engineer-in-charge.
To facilitate watering the pit, a concrete compartment should be made-with funnel with mesh and
cover plate as per rules provide in ISI regulation. The masonry endorser’s shall be 25 cm x 25cm x
25 cm (deep) with C.I, lid of 23 cm x 30 cm x30 cms. size. After installation, the earthing resistance of
each earth plate should be measured by resistance meggar in the presence of Engineer-in-charge,
three days after the completion of earthing work, and the value should conform to regulations.
Executive Engineer (M),D’cell
Signature of contractor/s
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
LIST OF THE APPROVED PRODUCTS, R &B SOR 2013-2014
CHAPTER – I 2.GELCO (Refer to Ch 1.1 (B)-Cat III (6))
WIRING 3. POINTER - SPECTRA (Refer to Ch 1.1(B) Cat.III- (3)
1.1 SHOCKPROOFACCESSORIES 4. ELLYS
(A) Concealed / Surface Type M/s ELLE Electrical PL. ,Cama Industrial Area, Walbhat
Any I.S.I.' marked Which is Approved by Department Road.
CATEGORY - I Next to Rajaram Tarphe, Goregaon (E), Mumbai -
1. ALLWYN - APPROVED 5.HI-Fl
M/s Allwyn Electricais Industire, 78, Kakad Industrial Estate, M/s Aerotite Industries ,5, Sati Industrial Estate,
Lady Jamshedji Road,Mahim - Mumbai - 400016 I.S. Road, Goregaon (E), Mumbai -
2. SAFECON'S 6.WONDER [EVER /
M/s KALA ELECTRICAL INDUSTRIES, 12/A, Eagal Market, 90 PLAYBOY/COOLICY/FORTUNE/DASH/GOLD]
Feet Road, Saki Naka, Mumbai - 400072 M/s Wonder Industries, G-14, O.I D.C. Udhyog
3. MILLION & MILLTEC Nagar Industrial Estate, GIDC, RinganwadaDAMAN (U.T)
M/s Mutha Electricals 7.ALLWYN (Refer to Ch.1.1l(A) Cat 1 (1))
1940/4, Ehadia Cross Road, Gandhi Road, Ahmedabd ~ 01 8.INDOASIAN
4. LEGEND &WIT M/s Indo Asian Fusegeear Limited~ 203-204, Shreedhar Avenue,
M/S, VINAYAK ELECTRICAL INDUSTRIAL, Dal Mill, Opp. 11, Sardar Patel Colony, Nr. Sardar Patel Statue, Naranpura, Ahmedabad
Charch, 9. VlNAY (Refer to Ch.1.1 (A) Cat.-II (I))
Behind Sonis Wadim SURENDRANAGAR - 363001 10. LEADER
5. VIMAL M/s Leader Electrical P.L., Leader House, 9 B, Mahal Industrial
Mis Solanki Industries, 22/180, Motilalnagar, Opp Old best Estate, P.B.No 9483, Mahakali Caves Read, Andheri (E),
colony, Goregaon [W], MumbaJ Mumbai - 400
CATEGORY - II 11.LK
(1) VINAY L.K. Switchges, 165, Gl,DC Makarpura, Baroda -
M/s Vinay Electricals, 16-A, Singh Industrial, Estate, Bldg NO.1, 12 NORTHWEST
Rammandir Road, Gorengaon (W),Mumbai - 40014. North West Switchgear Ltd.,
CATEGORY - III 14/3, Mathura Road, Faridabad Haryana -
(1) TOYAMA 13 MK
M/S Toyama Electric Ltd CATEGORY - III
36(A), Kiadb Industiral Estate, Hoskote, Bangiore * 562114 1.HAVELL'S - CRABTREE
(2) ORPAT M/S Havell's India Ltd, 202-205, SHIVALIK II, Nr. Shivranjani
M/s. Ajanta Industrial Estate, Rajkot Crass Road, Satelite 132 Ft. Ring Road, Ahmedabad -
Highway Post Box NO. 115, Morbi 2.TOYAMA (Refer to Ch.1.1 (A) Cat-III (l))
(B) Mini Modular Type [Approved] 3.ANCHOR [ROMA / WOOD IAVE] (Refer to Ch l. I (B)-I)
1. ANCHOR [NOVA / XL] 4.PHILIPS
Anchor Elect. PUd., Marathon Innova C Wing, Opp. Penivisula M/S. Philips Electronics india Ltd., 7, Justice Chandra
Corporate Park, Opp, G.K,Marg, Lower Parel [W] Mumbai Madhab Road, Kolkata-700020.
2. POINTER 6,ABB
H.O B-15, Atlanta Evershine, Evershine M/SABB Limited 2nd Floor, Est Wing, Khanija Bhavan,
Nagar, Malad [WI, Mumbai - 400064 Race Course Road, Bangalore - 560
3. PRISM- POINTER 6. ORPAT (Refer to Ch 1.1(A) Cat-III-(2))
M/s Prism Industires (Refer to Ch.1.1.(B), Cat.-III (2)) 7. SAL.ZER
4. ORPAT (Refer to Ch 1.1.(A), Cat,-lll (2)) M/s SALZER ELECTRONICS LTD,
5. VlMAL(Refer to CM.1 (A), Cat.-III (5)) Samichettipalayam, Coimbatore-641047
6. GELCO-Cat II 8. C&S GEWISS
GELCO ELECTRONICS PVT LTD M/s. Control & Switchgears Contactors LTd
5,7,6 & 16Amarnath Estate, Nr. Krishna Gopal Estate, 9th Floor, HERITAGE, Nr. Gujarat Vidyapith,
Naroda Road, Ahmedabad - 380025 Ashram Road, Ahmedabad - 380
(C) Modular Type APPROVED 1,2 RIGID PVC PIPES / OVAL PIPES & FITTINGS. FIA Approved
1. L&T ORIS & ISI marked Which is Approved by Department.
M/s LARSON & TURBRO LIMITED 1. VRAJ
501, SAKAR-I, OPP GANDHIGRAM RAILWAY M/s VRAJ PLASTIC INDUSTRIES,
STATION, AHMEDABAD - 380009 41,42&43 Amarnath Estate, Nr. GokuIesh Petrolium, Narol
2. LEGEND & WIT (Refer to Ch.I.I.(A), Cat,-I (4)) Cross Road, Ahmedabad - 382
3, INDOSIMON 2. PRECISION (Refer to Ch.1 1.(C) Cat-(I)-I)
M/s. EON Electric Limited 3. NIHIR
B/88, Sector 83, NOIDA- 201305, U.P., INDIA M/s NIHIR POLYMERS INDUSTRIES, 62, Umed Part Society,
4, RANI Sola Road, Ghatlodia, Ahmedabad - 380
M/s. Param Switchgear (P,) Ltd, 4, HIMA / AMIT
11, CSG Anand Niketan New Delhi-Il0021. M/s Hima Sales Corporation, Opp, Relish Pharrna, Nr. NiIkanth
CATEGORY - I Hotel, Ta, Kalol, Dist Gandhinagar. RAKANPUR
1. PRECISION 5.VINAY (Refer to Ch.1 1.(A) Cat.-II (I))
M/s Precision Etectricals Shiv Sagar estate, 6.POLYCAB
A-Block (Basement) Dr. A.B.Road Worli, Mumbai - 400018 M/s Polycab Wires Pvt. Ltd., HICO House, 1 st Floor,
2. POINTER~.ITALIA Refer to Ch.1.1. B), Cat.-111 (2)) Pandit Satwalekar Marg, Mahim/W), Mumbai -
M/s Alex Industires, 3, Neminath Industrial M/S, Bhaglaxmi Plastic Industires, 32, Asharva Ind. Estate,
Estate no.3 Navghar Road,, Vasai [E] Dist. Thane - 401210 Opp. Khodiyar Estate, Narol, Ahmedabad
4.PRISM - POINTER (Refer to Ch 1.1.(B), 3) 8. POWER FLOW INDIA / CROWN PLAST
5.VIMAL (Refer to Ch.1.1(A), Cat.-I (5)) M/S, CROWN INDUSTRIES
6.S.G. CATEGORY - II Plot No 6, Opp, Torrent Power Sub Station B/11,
1. ANCHOR-RIDER (Refer to Ch,1,1.(B)-3) Shahwadi Bus Stop, Narol Ahmedabad-382405
9. 9 - NINE / ADITYA
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
M/s. Aaditya Polymake, 550, Rajput Road, Opp. Volga airtech, ANY ISI MARKED WHICH IS APPROVED BY DEPARTMENT
Sarkhaj Bavla Highway, changodar, Ahmedabad. CATEGORY - II
10. MARUTI 1. ARYA (Refer to Ch.2.1. Cat.-II(I))
18, Kamal Estate, Bombay Conductors, VATVA, AHMEDABAD 2. ANCHOR (Refer to Ch.1.1(B) Cat.-III (1))
11. PRESTO PLAST 3. BAJAJ (Refer to Ch.2.1.Cat.-II (3))
M/s, HARSH POLYMERS PVT LTD 4. OSRAM (Refer to Ch.2.1. Cat.-II (4))
5. JILCO (Refer to Ch.2.1 Cat.-II (6))
1/11 C, Proctor Road, Grant Road; [East], MUMBAI -
6. PUSHKAR / AKSHAR
M/s. Puskhar Industries 87/1, Vilage ShihoIdi,
13. AMIT Vaso Alindra Road, Ta. Matar, Dist. Kheda -
Amit Electro Plast, 431,4th Floor, Sarvoday Comm. Center 7. VAPOLITE
Salapas Road, Nr. G.P.O, Ahmedabad. CATEGORY - III
14. MAXCEL PLAST
M/S. Maxcel Plast 133, SHREE Ram Ind. Estate, B/h. C.M.C, 1. HAVELLS' (Refer to Ch;1.1. (C) Cat.-Ill (I))
Anup Eng. Compound, Nr. Soni's Chawl Cross Road, ODHAV, 2. SURYA (Refer to Ch.2.3 Cat.-III (1))
Ahmedabad - 352415. 3. G.E. (Refer to Ch.2:1. Cat,-II (2))
4.PHILIPS (Refer to Ch. 1.1. Cat-III (2))
1.3 OVAL I CASING & CAPING & PVC TRUNKING 5. CROMPTON (Refer to Ch.2.1. Cat III (3))
1. VRAJ (Refer to Ch,1,2.(1)) 6, HALONIX Refer to Ch 2.1 Cat.III (4))
2, PRECISION (Refer toCh. 1.1 (C) Cat.-1.(I)) 7. WIPRO (Refer to Ch 2,1, Cat.-III (5))
3. NIHIR (Refer to Ch.1.2.(3)) 8. C&S GEWISS (Refer to Ch.1.1.(C) Cat-III (8))
4. HIMA / AMIT (Refer to Ch.1.2.(4)) 9. SHAKTI
M/s Shakti Fixtu re Industceis 212lB, Bombay Talkies
5. VINAY (Refer to Ch.1.1. (A) Cat.-II (1))
Compound Matad (W), Mumbai -400
6. POLYCAB (Refer to Ch.1,2.(6))
7. MODI'S 2.4 COMPACT FLOURESCENT LAMPS
M/S. Modi's Group of Companies, 34, Palace manor, 31 & 32, CATEGORY - I
BAlfour Road, KeIlys, Channai - 600010 1. ANCHOR (Refer to Ch.1.1 .(B)-Cat.-III 1))
8 9 NINE / AADITYA (Refer to Ch 1.2 (9)) CATEGORY - II
9. MARUTI (Refer to Ch.1.2(10)) 1.SPANCO
10, PRESTO PLAST (Refer to Ch.1.2.(11)) M/S Spance Semiconductors, 10/11, Bhagat Industrial Estate,
11. POWER FLOW INDIA / CROWN PLAST ~Refer to Ch.1 Nr.18No. ESI Hospital, Jay Bharat Rangshala Compound,
2.(8)) Saraspuh Ahmedabad -
12. SHRINATH 2. GRE
13. M.K. 14. AMIT (Refer to Ch.1.2 Cat III (13)) 15. MAXCEL M/s. GRE Electronics Pvt. Ltd,,
PLAST (Refer to Ch.1.2 (14)) Plot No 423, G.I.D.C.-II, Dediyasan, Mehsana -
LAMPS & FITTINGS 3. OSRAM (Refer to Ch.2.1 Cat -II (4))
2.1 FILAMENT LAMPS I FLOURESCENT TUBES 4. JILCO (Refer to Ch 2.1. Cat.-II (6))
M/s. Standard Electrical Ltd
ANY ISI MARKED WHICH tS APPROVED BY DEPARTMENT;
202-205, Shivalik - II, Nr. Shivrangni Cross Road,
(B) CATEGORY - II Satelite, 132 feet Ring Road,Ahmedabad -
1. ARYA 6, CILVER
M/s,Arya Filaments P.L,, 344, Vishnupuri 7. INDOASIA
Annex. AB.Road, Indore - 452 001 8. OREVA
2. GE M/s. Ajacta Manufacturing Ltd,
M/s GE India Industrial Pvt. LTd., 405, "Kirtiman", Kinariwala SA, National Highway, Morbi-363642,
House, B/H Citibank, Off. C,GRoad. Ahmedabad - 380
3. BAJAJ CATEGORY - III
M/S Eajaj Electricals Limited, 109, Ist FI, Sakar 111, Nr. Ashram
Rroad, Navrangpura, Ahmedabad 380 014 1. HAVELLS' (Refer to Ch.1.1, (C) CatIII (1))
4. OSRAM 2. SURYA (Refer to Ch.2.1. Cat,-III (1))
M/s Osram India P.L. Delhi Road, Sonipat - Haryana - 131001 3. PHILIPS (Refer to Ch,1.1 (C) Cat -III (3))
5. ANCHOR (Refer to Ch 1.1 (B) Cat.-III (I)) 4. CROMPTON (Refer to Ch 2,1. Cat.-III (3))
5. HALONIX i(Refer to Ch.2.1. Cat III (4))
6. WIPRO (Refer to Ch.2,1. Cat. III (5))
M/S JAIN INDUSTRIAL LIGHTING CORP~
B-70/22, DS[DC Complex, Lawrence Road, New Delhi - 35 M/sASIAN ELECTRONICS LTD, 11-14,
7. INDOASIAN (Refer to Ch,1.1.(C) Cat.-II-8) Tej Complex, Nr. Lions Hall, Opp. Ashoka Chambers,
CATEGORY - III Mithakhali, Ellisbridge, Ahmedabad - 380 006 - India
1. SURYA 8. HPL (Refer to Ch.2.1. Cat.-III (6))
M/s. Surya Roshni Ltd, (Lighting Division)
308, Shefali Centre, Nr. Paldi Char Rasta, Ahmedabad - 380006 2.5 METAL HALIDE LAMPS
2.PHILIPS (Refer to Ch.1.1(C) Cat. III (4)) CATEGORY - I
3.CROMPTON ANY ISI MARKED WHICH IS APPROVED BY DEPARTMENT
M/s. Crompton Greaves, C.Q. Hube, 6th Floor, Dr. Annie CATEGORY - II
Besant Road, Worli, Mumbai -
4.HALONIX 1.ARYA (Refer to Ch.2.1. Cat.-II (1))
M/s. Halonix Limited, 59A, 59D, Noida Special Economic Zone, 2. ANCHOR (Refer to Ch.1 1 (B) Cat-III (1))
Phase - II, Noida, Dist. Gautam Budhnagar - 201305 [UP] 3. BAJAJ (Refer to Ch.2,1, Cat-II (3))
4.OSRAM (Refer to Ch.2.1 Cat -II (4))
8.PUSHKAR / AKSHAR (Refer to Ch.2.3 Cat.-III (8))
M/s Wipro Ltd, A/210, Fair deal House, Opp. St. Xavier"s Ladies
Hostel, Navrangpura, Ahmedabad CATEGORY - III
M/s B/707, Premium House, Nr. Gandhi Gram Rly Station, 1. SURYA (Refer to Ch.2.1. Cat.-III (1))
B/H Natraj Cinema, Ashram Road, Ahmedabad - 380009 2.GE (Refer to Ch.2 1. Cat.-II (2))
3.PHILIPS (Refer to Ch,1.1. (C) Cat-III (2))
2.3 SODIUM WAPOUR LAMPS 4.CROMPTON (Refer to Ch.2.1. Cat.-III (3))
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
5. HALONIX (Refer to Ch 2.1 Cat-III(4)) 8.GLOMORE
6. WIPRO (Refer to Ch.2.1. Cat -111 (5)) M/S Devraj Enterprises (P) Ltd ,
7.HAVELL'S (Refer to Ch.1.1. (A) Cat.-III (1)) SobhnaAppartment. 4th Floor, Above Mandavi Bank,
8, C&S GEWISS (Refer to Ch.1.1 .(C) Cat.-11I (8}) Chandravarkar Road, Borivali [W], Mumbai -
9. SHAKTI (Refer to Ch.2.3. Cat.-11 (9)) 9. C&S GEWISS (Refer to Ch. 1 I (C) Cat qll (8))
10. CILVER (Refer to Ch26. Cat -II (10))
2.6 ENERGY SAVING FLOURESCENT TUBE & CFL FITTINGS 11. ACON
(Box Type/Industrial Type/Mirror Optic/Mirror Light/Street M/s Surer Electronics 'Sorab Villa", Nr. Popular House,
Light) APPROVED Ashram Road, Ahmeabad-
12 INAVA (Refer to Ch.2.6, Cat.-II (3))
1,FUTURE LIGHTING 13 PRESTOLITE (Refer to Ch. 26 Cat-III (4))
M/S. FUTURE LIGHTING INDIA LTD+ 8TH FLOOR, TOWER 14 INDOASIAN (Refer to Ch.1 1. (C) Cat.-II (8))
"C"~ 247 PARK, LB.S, MARG, VIKHROLI [VV] MUMBAI - 400083 15 SHAH
2.CAMAY M/s Shah Electronics, A-3, Manoharvila, New Naroad, Nicol
M/S. CAMAY ELECTRONICS, CAMAY HOUSE, CHANDN[ Road,
CHOWK, FULWADI DHORE, JETPUR ~ 360370 Nr Naroda Canal, Nicol, Ahmedabad ~
3. EUROLITE 16 Pulse / Nano (Refer to Ch. 2.6, Cat.-I (1))
M/S RUBYCON ELECTRICALS & ELECTRONICS INDUSTRIES 17 AKHIL(Refer to Ch.2.6 Cat.-I (3))
SURVEY NO 246/4, OPP. G I.D.C. PHASE-I SIHOR -
BHAVNAGAR - GUJARAT CATEGORY - II
4. ENERGYVISION [ENERGY SAVING T-5 TUBE FITTING I CFL OUTDOOR
M/S ENERGY VISION, 38/568, SHASTRINAGAR, TYPE] 1. GELCO (Refer to Ch,1 .1 (B) cat-III (6))
KHATODARA COLONY, SURAT - 395002 2. SHAKTI (Refer to Ch. 2 3. CatIII (9))
EUROLITE (Refer to Ch,2 6, Approved (3)) 3. JILCO (Refer to Ch2.1. Cat -II (6))
4. CILVER(RefertoCh2.6 Cat.-II(10))
CATEGORY - I 5. AKHIL (Refer to Ch,2.6 Cat-I (3))
1. PULSE 6 ACON (Refer to Ch2.6 Cat-Il (11))
M/s Pul$e Electronics & Control B/1, Maruti tenament,
Opp. Shdji Bapa Complex, Nr. Rabari Colony, Vastral to Odhav CATEGORY - III
Canal Road, Ahmedabad (ENERGY SAVING T-5 TUBE FITTING / CFL INDOOR
2.HAVELL'S (Refer to Ch.l 1, (A) Cat.-III (1)) TYPE]
3.AKHIL 1. HAVELL'S (Refer to Ch.1.1. (C) Cat-Ill (1))
M/S SATYA ENGINEERING WORKS PL. A-111, MANGOL 2. HALONIX (Refer to Ch,2.1 Cat -Iii (5))
PURl IND AREA PHASE - II, NEW DELHI - 110034 3. GRE (Refer to Ch.2.4. Cat.-II (2))
4. Optic Lighting 4, WIPRO (Refer to Ch. 2.1. Cat.-III (5))
M/S Optic Lighting PL Rajiv House4, Smritkunj, 5, THORN
Nr, Navrangpura Post Office. Navrangpura, Ahmedabad -09 M/s. Thorn Lighting India PL C/o,f 0 parshwanath Apt.,
5.Pulse / Nano(Refer to Ch26 Cat,-I (1)) Somnath Park Lane, Opp Tele, Exchange, Sahibaug,
6.Aash Cube Ahmedabad -
M/s Aashcube Lighting P.L. C/41,195, Krishna Estate 6.SURYA(Refer to Ch21 Cat.-III (1))
B/h Anuptech, Opp B,I.D C. Gorwa, Vadodara - 390016 7.ASIAN (Refer to Ch. 2.6. Cat II (4))
8.G.E.(RefertoCh.21 Cat-II(2))
CATEGORY - II 9,PHILIPS (Refer to Ch. 1.1. (C) Cat.-III (4))
1, JABLA 10. CROMPTON (Refer to Ch.2.t. Cat. III (3))
M/S JABLA ELECTRICAL INDUSTRIES, 29 B/C JAY 11, BAJAJ (Refer to Ch.2.1 .Cat.-II (3))
KHODIYAR INDUSTRIAL ESTATE, NR. SUBHASH ESTATE, 12. PASOLITE
RAMOL ROAD C T~M. AMRAIWADI, AHMEDABAD - 380026 M/s Pasolite Electricals P.L.
2,GELCO (Refer to Ch. 1,1, (B) Cat.-III (6)) 7, kilari road, 14th cross, Bangalore-
3. INAVA 13. PRESTOLITE (Refer to Oh 2 6 Cat -III (4))
M/s. Inava Instruments International 94, Ratnajyot Ind. Estate, 14. HPL (Refer to Ch. 2 6 Cat.-III (2))
Irla Lane, Vile Parle (W), Mumbai - 400056 15. SHAKTI (Refer to Ch,2.3. Cat.-III (9))
M/s. Pierlite India PL. Rakhial Road, Ahmedabad. ENERGY SAVING T-5 TUBE FITTING / CFL [OUTOOR TYPE]
1. SPANCO (Refer to Ch. 2.4. Cat.-II (1)) 1.HAVELL'S(Refer toCh.l.1. (C) Cat-III(1))
2, HPL 2.GRE (Refer to Ch,2 4, Cat-II (2))
M/s. HPL EIeetrie& Power Ltd., Plot No. 76-B, Phase-IV, 3.SURYA (Refer to Ch.2 1. Cat.-III (1))
Sec.-57, JSIIDC, Indl Area, Kundli Dist. Sonipat, 4.PIERLITE (Refer to Ch2.6 Cat,II (4))
(Haryana)-131028. 5.PHILIPS (Refer to Ch.1.1 (C) Cat.-III (4))
3. FIXOLITE 6.CROMPTON(RefertoCh2,1 Cat 111(3))
M/s FIXOLITE INDUSTRIES, Jhon Robert Compound 7.WIPRO (Refer to Ch.2.1. Cat.-IIl (5))
Sewri Fort Road, Sewri (E), Mumbai - 400015 B.THORN [Refer to Ch.2.6. Cat -III (5))
4. PRESTOLITE 9.BAJAJ (Refer to Ch.2.1.Cat-II (3))
M/s Prestolita Corporation, 57/5, Khalii Sth Compound, 10.SHAH (Refer to Ch. 2.6, Cat -II (15))
Off M.G. Road, Gurgaon [WI, 11. PRESTOLITE (Refer to Ch. 2.6 Cat.-IJl (3))
5.SHAKTI (Refer to Ch.2.3. Cat.-111 (9)) 12. HPL (Refer to Ch,2.6.Cat.-IIl (2))
6.C&S GEWISS (Refer to Ch.1.1 (C) Cat.-III (18)) 13. FIXOLITE (Refer to Ch.2.6.Cat,III (3)~
14. SHAKTI (Refer to Ch.2.3. Cat. Ill (9))
[ENERGY SAVING T-5 TUBE FITTING / CFL INDOOR TYPE] 15.TEKNOLITE (Refer to Ch2.6. Cat.-III (3))
CATEGORY - II 2.7 FLOURESCENT TUBE FITTINGS [ ELECTRONICS BALLAST
1.SPANCO (Refer to Ch.2.4: Cat-II (1)) (Box Type/Industrial Type/Mirror Optic/Mirror
2. GELCO (Refer to Ch.1.1. (B) Cat-III (6)) Light/Streetlight) APPROVED
3. TEKNOLITE 1. ACTION
M/s TeknovisionAIlied Product P.L 16, Waman Patil Industries M/S. ADHUNIK SWITCHGEARS P L
Estate, Nr. Dukes Factory, Nr. Chembur, Mumbai-71 UNIT-l, 902/290, SHALIMAR IND AREA DELHI -
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
4.ARYA (Refer to Ch,2,1, Cat-II (1)) CATEGORY - I
5.SHAKTI (Refer to Ch.2,5. Cat-III (9)) ANY ISI MARKED WHICH IS APPROVED BY DEPARTMENT
6.JILCO (Refer to Ch.2,1. Cat.-II (6)) 1. PULSE (Refer to Ch.2 6. Cat q (2))
7.ANCHOR (Refer to Ch.1.1. (B) Cat-III (1))
1. GELCO (Refer to Ch.1.1. (B) Cat.-lII(6)) 2.10 FLOOD LIGHTS WITH BCI ES/IMV I SV I MH / LAMPS
2. PRESTOLITE (Refer to Ch.2.6. Cat -III (4)) (POST TOP LANTERN I STREET LIGHTS)
3. GLOMORE (Refer to Ch.2.6. Cat.-II (8)) CATEGORY - I
4. TEKNOLITE (Refer to Ch.2.6. Cat.-II (3)) ANY lSI MARKED WHICH IS APPROVED BY
5. ARYA (Refer to Ch.2 1, Cat-Il (1)) DEPARTMENT 1.EUROLITE (Refer to Ch.2.6 Cat Approved
6, INDOASIAN (Refer to Ch,1,1. (C) Cat.-II (8)) (3))
7. JILCO (Refer to Ch.2.1 Cat.-II (6)) 2. SUNBEAM (Refer to Ch. 2.9. Cat.-I (3))
8.CILVER (Refer to Ch.2.6 Cat.-II (10))
9. ANCHOR (Refer to Ch. I 1. (B) Cat-tit) CATEGORY - II
10, G.E, (Refer to Ch.2.1. Cat.-II (2)) 1. SPANCO (Refer to Ch.2.4. Cat.-II(1))
11.PASOLITE (Refer to Ch.2.6. Cat-II (12)) 2,GLOMORE (Refer to Ch.2.6 Cat ~ II (18))
12,ACON (Refer to Ch,2.6 Cat.-II (11)) 3. ARYA (Refer to Ch.2.1. Cat.II (1))
13.ACQURATE 4. ANCHOR (Refer to Ch.1.1. (B) Cat.-Ill (1))
M/S ACQURATE Engitech Limited, Plot NO 147/148, GIDC 5.G.E. (COMMON FITTING] (Refer to Ch. 2.1. Cat,-II (2))
Ankleshwar, Dist. Bharuch Gujarat -
14. BAJAJ (Refer to Ch. 2.1. Cat.-II (3)) CATEGORY - III
15.AKHIL (Refer to Ch.2.6, Cat.-I (3)) 1. SURYA (Refer to Ch.2.1. Cat-III (1))
16. SUNBEAM 2. HAVELL'S (Refer to Ch.1.1, C) Cat.III(1))
M/s Sunbeen Electricais, 292/7/B Shastri Laghu Udhyog Nagar, 3, GRE (Refer to Ch. 2 4. Cat.-IJ (2))
Maheshwari Mill Read, Tavdipura, Shahibaug, Ahmedabad-30004. 4. PIERLITE (Refer to Ch.2,6. Cat.-III (8))
CATEGORY - III 5.G.E. (SF/GEMF/BLAZE/ZION/GLANZ/EI-2000+/CONJA-J R /
1. PHILIPS (Refer to Ch,1 1. (C) Cat.-Ill (3) HELO FLOOD / ARINA)
2. CROMPTON (Refer to Ch.2.1, Cat.-III (4) (Refer to Ch.2.1, Cat II (2))
3.SURYA (Refer to Ch. 2.1.. Cat -III (1)) 6.PHILIPS (Refer to Ch,l.1, (C) Cat-III (4)
4. HAVELL'S (Refer to Ch,1,1. (C) Cat,-III (1)) 7,CROMPTON (Refer to Ch.2.t, Cat-III (3)
5. WIPRO (Refer to Ch.2.1 Cat -III (5) 8.WIPRO (Refer to Ch.2.1. Cat -III (5))
6, HALONIX (Refer to Ch.2.1. Cat.-III (4) 9.TRANSRAIL (Refer to Ch.2,9. Cat,-III (14)
7. GRE (Refer to Ch. 2.4. Cat -II (2) 10. HALONIX (Refer to Ch,2,1. Cat.-III (4)
8,SHAH {Refer to Ch.2.6 Cat.-II (15) 11. BAJAJ (Refer to Ch. 2.1. Cat.-II (3))
9. FIXOLITE (Refer to Ch,2.6. Cat, IIII (2) 12. PRESTOLITE (Refer to Ch.2 6. Cat.-III (4))
10. HPL (Refer to Ch. 2.6,Cat.-III (2)) 13, FIXOLITE (Refer to Ch. 2.6. Cat.-III (3))
11. PIERLITE (Refer to Ch.2.6. Cat.-II (4)) 14. HPL (Refer to Ch.2,6 Cat -III (2))
12. C&S GEWISS (Refer to Ch.1.1, (C) Cat -III (5) 15. C&S GEW[SS (Refer to Ch,1,1. (C) Cat.III[ (8))
13. SHAKTI (Refer to Ch. 2.5. Cat,III (9)) 16. SHAKTI (Refer to Ch2.3 Cat.-III (9))
2.9 SODIUM VAPOUR LAMP FITTINGS
(POST TOP LANTERN / STREET LIGHTS) 2,11 Halogen Tube Fittings
CATEGORY - I ANY ISI MARKED WHICH IS APPROVED BY
1. GLOMORE (Refer to Ch.2.6 Cat.-II (8)) DEPARTMENT
2.EUROLITE - APPROVED (Refer to Ch.2.6. Cat. Approved (3) 1. EUROLITE (Refer to Ch.2.6. Cat, Approved (3))
3.SUNBEAM (Refer to Ch.2.7, Cat.-II (16)
4.OPTIC LIGHTING (Refer to Ch.2:6. Cat.-I (4) Category - II
CATEGORY - II 1. ARYA (Refer to Ch,2,1. Cat. II (1))
1.SPANCO (Refer to Ch.2.4 Cat,-II (1)) 2. PIERLITE (Refer to Ch.2,6. Cat -II (4))
2. ARYA (Refer to Ch.2 1, Cat II (1) Category - III
3. JILCO (Refer to Ch.2.1. Cat.-II (6) 1. HAVELL'S (Refer to Ch.1.1. (C) Cat.-Ill (1 )
4. ClLVER (Refer to Ch.2.6 Cat.-II (10) 2, WIPRO (Refer to Ch.2.1, Cat-II (4)
5, ANCHOR (Refer to Ch,1.1. (B)-Cat-III (1) 3. HALONIX (Refer to Ch.2 1. Cat -III (4)
6. G.E.[COMMON FITTING] (Refer to Ch. 2.1 Cat,-II (2) 4. TRANSRAIL (Refer to Ch. 2.14 Cat.-III (7))
7.ACQURATE (Refer to Ch. 2 7, (18)) 5. SHAKTI (Refer to Ch.2 3 Cat-III (9))
8. PULSE/NANO (Refer to Ch.2.6. Cat,-I (1) 2.11 (A) METAL HELIDE LAMP FITTINGS
CATEGORY - III CATEGORY - I
1. HAVELL'S (Refer to Ch,1.1, (C) Cat,-Ill (1) 1. GLOMORE (Refer to Ch. 2.6 Cat -II (8))
2. PIERLITE (Refer to Ch.2,6. Cat.-II (4) 2, EUROLITE (Refer to Ch.2.6 Cat Approved (3))
3. SURYA (Refer to Ch.2,1. Cat. III (1) 3, OPTIC LIGHTING (Refer to Ch. 2,6 Cat- I (4))
4. G.E. (SR/SPPT/OLYMPIA/RANGER / GEN-X / SKYGEN / M ET- CATEGORY- II
40/SPECTRA / QUNA / NOVA T-5 STRECT / OPTYLANE) (Refer 1. BAJAJ (Refer to Ch.2.1, Cat.-II (3))
to Ch.2.1. Cat-Il (2) 2. ARYA (Refer to Ch. 2.1, Cat: II (1))
5.PHILIPS (Refer to Ch. f .1. (C) Cat.III (4) 3. JILCO (Refer to Ch. 2.1. Cat -II (6))
6,CROMPTON (Refer to Ch.2.1. Cat.-III (3) 4. PASTOLITE (Refer to Ch. 2 6 Cat. III (13))
7.GRE (Refer to Ch.2.4 Cat.-II (2) 5. PIERLITE (Refer to Ch.2.6 Cat -II (4))
8. HALONIX (Refer to Ch.2.1. Cat.-III (4)
9.WIPRO (Refer to Ch.2.1. Cat.III (5) CATEGORY - III
10. THORN (Refer to Ch.2,6. Cat,-III (5)) 1. HAVELL'S (Refer to Ch.1,1. (C) Cat III (1))
11,BAJAJ (Refer to Ch.2 1. Cat.-II (3}) 2. THORN (RefertoCh.2.6. Cat.-IIII(5))
12.FIXOLITE (Refer to Ch.2.6 Cat.-II (3)) 3. GRE (Refer to Ch.2.4. Cat,-lI (2))
13.PASOLITE (Refer to Ch.2.6, Cat.-III (13)) 4. TRANSRAIL (Refer to Ch.2 9. Cat.-III (14))
14.TRANSRAIL 5. SURYA (Refer to Ch. 2.1. Cat-III (1))
A-201/209, Boomerang Complex, Chandivali Farm Road 6. WIPRO (Refer to Ch.2.1. Cat -III (7))
, Andheri [E[, Mumbai - 400072 7, HALONIX (Refer to Ch.2,1 Cat.-Ill (5))
15.PRESTOLITE (Refer to Ch.2,6 Cat.-lII(3))
16.HPL (Refer to Ch. 2.6.Cat.-lll (2))
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
17.C&S GEWISS (Refer 1o Ch,1,1. (C) Cat.-III(8)) 2.12 ELECTRONIC BALLAST
18. SHAKTI (Refer to Ch~2.3 Cat.-III (9)) CATEGORY - I
1. AMIT (Refer to Ch.1.2. (13))
2. GLOMORE (Refer to Ch.2.6. Cat.-II (8)) 2. INAVA (Refer to Ch,2,6. Cat.-II (10))
3. TEKNOLITE (Refer to Ch.2.0. Cat.-2 (3)) 3, ANCHOR - APPROVED (Refer to Ch. 1.1, (B) Cat.-III (2))
4. GELCO (Refer to Ch.1,1. (B) Cat.-(2 (6)) 4. CILVER (Refer to Ch,2.6. Cat II (10))
5. INDOASIAN (Refer to Ch.1 .1. (C) Cat.-II (8)) 5. PULSE (Refer to Ch.2.6, Cat.-I (1))
6. ARYA (Refer to Ch.2,1. Cat,-II (1)) 6. JILCO (Refer to Ch.2,1, Cat.-II (6))
7. ASIAN (Refer to Ch.2.4. Cat.-III (7)) 7. EUROLITE - APPROVED (Refer to Ch.2.6. (3))
8. OSRAM (Refer to Ch. 2,1, Cet.-II (4)) 8. CAMAY (Refer to Ch.2 6~ Approved (2))
9. ACON (Refer to Ch.2.6. Cat.-II (11)) CATEGORY - II
10:INTELUX 1.SPANCO(RefertoCh2.4 Cat.-II(1))
M/S intelux Electronics P.L. Unit No 2, Electronics Co. Op. Estate M/s Bentec Electrical& Electronics PL. No 7, Maharaja Estate,
Pune - Satara Road, Pune - 411009 B/4, Bhagyoday Hotel, Sarkhej - SanND Highway,
11. OCLEG Sarkhej -Ahmedabad -
M/s. OCLEG CONTROLS, 93-94, Amar Estate, B/h Lubi Elect., 6, ACTION (Refer to 2.7 Approved (1))
memco, Naroda Road,Ahmedabad
12. Pulse/Nano (Refer to Ch.2.6. Cat.-1 (1)) CATEGORY - III
CATEGORY - III 1. HAVELLS (Refer to Ch.1.1 (A) Cat-III (1)
1. HAVELL'S (Refer to Ch. 1.1. (C) Cat.-III (1)) 2. INDOASIAN (Refer to Ch.1.1(C) Cat,-II (8))
2. GRE(ReferfeCh2.4. Cat.-Il(2)) 3. STANDARD (Refer to Ch,2.4. Cat.-II (5))
3.PIERLITE (Refer to Ch.2.6. Cat.-II (4)) 4. L&T
4. PHILIPS (Refer to Ch1.1 (C) Cat III} (3)) M/S L & T House, Ballord Estatel P.O. Box No 278 Mumbai-01.
5.CROMPTON (Refer to Ch. 2,1. Cat.-III (4)) 5.CROMPTON (Refer to Ch.2.1. Cat.-III (4))
6.WIPRO (Refer to Ch.2.1, Cat.-III (7)) 6.C&S (Refer ta Ch.1.1 (C) Cat.-III (8))
7. HALONIX (Refer to Ch.2.1, Cat-III(5)) 7. GUTS¸
6.SHAH (Refer to Ch.2.6. Cat,-II (15)) M/s GUTS CIRCUIT BREAKERS PVT LTD, ManasAnand Bldg
9.HPL (Refer to Ch.2.1 Cat.-[II (6)) No .1 Flat No 804,Dongri Pada, Godbunder Road, Thane West
10. FIXOLITE (Refer to Ch. 2,6. Cat. III (3))
11. C&S GEWISS (Refer to Ch.1.1(C) Cat.-III(8)) 8. HPL (Refer to Ch.2.1, Cat -III (6))
12. SHAKTI (Refer to Ch.2.3, Cat,-III (9)) 3.3 METAL CLAD SWITCHES WITH HRC FUSE
CHAPTER III 1. KEW (Refer to Ch. 3.1, Cat.-III (1))
SWITCHGEARS & DISTRIBUTION BOARDS 2. PIERLITE [ELECON] (Refer to Ch.2.6. Cat.-II (4))
3.1 CAST IRON CLAD SWITCHES WITH REWIREBLE FUSE 3. PEW (Refer to Ch,2,12.(3.1) Cat-II (4))
CATEGORY - I 4. SUPER (Refer to Ch. 2.12 (3,1) Cat -II (5))
ANY ISI~ MARKED WHICH IS APPROVED BY DEPARTMENT 5. CROMPTON (Refer to Ch.2.1. Cat-III (3))
CATEGORY - Il 7. NEW / NILANG (Refer to Ch.2.12 (3.1) Cat II (3))
1. TRISHUL 6. ELECTRO POWER
M/s Aum Electrical Industries, 1014, GIDC, M/s. Electro Power, B-22, Jay Estate, Opp. Keval weigh bridge
Waghodia - 321760 Gujarat Rakhial, Ahmedabad ~
2. MODI CATEGORY - III
M/S MODI INDUSTRIES~ 61, Mahaveer Estate, Nr. Anupam 1. HAVELLS (Refer to Ch.1.1. (A) Cat.-III (1))
Cinema, Khokhara,Ahmedabad-380008 2. INDOASIAN (Refer to Ch,1.1 (C) Cat.-II (8))
3. NEW/NILANG 3. STANDARD (Refer to Ch2,4. Cat -II (5))
M/s NilangEngineering Works, Plot No. 156/2, A-31 Kailashnagar 4, C&S GEWISS (Refer to Ch.1.1. (C) Cat -III (8))
Estate, Opp. New Tele. Exchange, F Road, GI.D.C, Vatva, 5. L & T refer to Ch.3.2 cat-III(4))
Ahmedabad - 382445 6. Siemens
4, PEW M/s. Siemens Ltd L.V. Control & Distribution
M/s Patel Engineering Works, 23, Vrundavandham, Society, Opp. Products Thane Be!apur Road, Thane -
P.d. Pandya College, Nr. Smruti Mandir, Ghodasar~Ahmedabad 7,GE.(Refer to Ch.2,1. Cat. II(2))
5. SUPER 8.GUTS (Refer to Ch. 3 2. Cat.-III (7))
M/S SUPER SWITCHGEARS, SHED - C,5/6, GIDC VITTHAL 9.HPL (Refer to Ch.2.1. Cat.-III (6))
UDHYOG NAGAR,~ZVNAGAR, - 388121 3.4 MOULDED CASE CIRCUIT BREAKERS
6. AEW CATEGORY - I
M/s. Ambica Engineering Works, L-61, G,I.D C. Estate, ANY [SI MARKED WHICH IS APPROVED BY DEPARTMENT
Nr. Water Tank, Odhav, Ahmedabad - 382415 1,L.S. APPROVED
2.ACTION I ADHUNIK (Refer to Ch.2.7 Approved (1))
CATEGORY - III CATEGORY - II
1. KEW 1. BENTEC (Refer to Ch.3.1. Cat.-II (7))
M/s KEW FUSEGEAR PVT, LTD C 1 B/1336/38, Gl.D.C. Estate, 2.CROMPTON (Refer to Ch.2,1. Cat -III (3))
Makarpura, Vadodara - 390010 CATEGORY - III
2.STENLY · 1. HAVELLS Refer to Ch.1.1. (C) Cat.-lII (1))
3.2 METAL CLAD SWITCHES WITH REWIREBLE FUSE 2. STANDARD (Refer to Ch,2 4~ Cat.ll (5))
(63A - 100 A) APPROVED 3. BCH
1.ACTION I ADHUNIK (Refer to 2.7 Approved (1)) M/s. BCH Electric Limited 93,City centre Nr. Swank Char
CATEGORY - I Rasta, C.G Road, Ahmedabad -380
1. REIKO 4.C&S GEWISS (Refer to Ch.1 1. (C) Cat.-III (8))
M/S R.L.Electrical Industries, 8, Sri Ram Marg, Opp, Central 5.INDOASIAN (Refer to Ch.1.1. (C) Cat.-II (8))
bank, Moujpur Road, Shahdara, Delhi-110053 (INDIA) 6.L&T(Refer toCh,3.2, Cat,-III(4))
CATEGORY - II 7.SIEMENS (Refer to Ch,3.3 Cat,III (6))
1.KEW (Refer to Ch.3,1, Cat.-III (1)) 8.GE. (Refer to Ch.2.1 Cat.-II (2))
2.TRISHUL (Refer ta Ch.2.12. (8.1) Cat.-II (1)) 9.GUTS (Refer to Ch.3.2 Cat,-Ill (7))
3.MODI (Refer to Ch.2.12.(3,1) Cat.-II (2)) 10.HPL (Refer to Ch~2.6, Cat,Ill (3))
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
4.PEW (Refer to Ch.2.12. (3.t) Cat.-II (4)) 3.5 AIR CIRCUIT BREAKERS
5.SUPER (Refer to Ch. 2.12. (S,t) Cat.-II (5) ) APPROVED
6.NEW/NILANG(RefertoCh.2.12. Cat.-lI(3)) ANY ISI MARKED WHICH IS APPROVED BY
7.BENTEC DEPARTMENT
4. CROMPTON (Refer to Ch. 2,1, Cat -III(3)) 1. BIECCO
8. L&T(RefertoCh.3.2 Cat-III(4)) M/s. Biecco Lawarie Limited, 95, maker tower "F", 9th Floor,
8, Siemens (Refer to Ch.3 3. Cat-II 6)) Cuffee
7. HAVELLS ~Refer to Ch. 1.1. (C) Cat.-III(1)) Parade~ Mumbai
8, HPL (Refer to Ch. 2.8. Cat.-III(2)) 2.HPL (Refer to Ch.2.1. Cat -III (6))
3.6 CHANGE OVER SWITCHES CATEGORY - III
APPROVED 1. C&S (RefertoCh.1.1.(C)Cat-(8))
1. ACTION / ADHUNIK (Refer to 2.7 Approved (1)) 2. INDOASIAN (Refer to Ch.1,1. (C) Cat-IIl (8)
3. G.E. (Refer to Ch.2.1 Cat.-II (2))
1. MODl(RefertoCh2.12 Cat.-II(2))
2. REIKO (Refer to Ch.3.2. Cat-I(1)) 13. BENTEC (Refer to Ch.3.4 Cat.-II (7))
14. SIGMA (Refer to Ch. 3.6 Cat. II (8))
1. PEW (Refer to Ch. 2.12 (3.1) Cat -II (4)) CATEGORY - III
2. KEW(RefertoCh3.1 Cat.-III(1)) 1. HAVELLS (Refer to Ch.1 1. (C) Cat.-III(1))
3. BENTEC (Refer to Ch. 3.1 Cat -II (7)) 2. STANDARD (Refer to Ch. 2,4. Cat -II (5))
4. NEW / NILANG (Refer to Ch. 2.12 (3 1) Cat -II (3)) 3, C&S (Referto Ch.1.1 (C) Cat-II(12))
5, SUPER (Refer to Ch. 2.12.(3.1) Cat.-II(5)) 4. INDOASIAN (Refer to Ch. 1.1. (C) Cat.-II(8))
6, ANCHOR (Refer to Ch. 1.1. (B) Cat.-III(1)) 5. ABB(RefertoCh.1.1(C) Cat-III(5))
7. ELECTRO POWER (Refer to Ch. 3.3 Cat II(8)) 6. L&T (Refer to Ch.3.2 Cat.-Il114))
8. SIGMA 7. GUTS (Refer to ch3.2 Cat-III(7))
M/S. MCB Electronic Controls, C-176, Mayapuri industrial 8. G.E (Refer to Ch. 2.1. Cat.-II(2))
Area, Phase-II, New Delhi-110064 9. HPL(RefertQCh2.1 Cat-III(6))
9. AEW (Refer to Ch. 3 1. Cat -II (6)) 10. NANO;
M/s Ajay Electrical Industries, B-257,
CATEGORY - III naraina ind. area, phase - I, New Delhi
1, HAVELLS (Refer to Ch1,1. (C) Cat.-III(1)) 11. MDS
2. STANDARD(RefertoCh,2.4 Cat -II(5)) 12. PIERLITE SAFETY (Refer to Ch2.6 Cat-Il (4))
3. C&SGEWISS(RefertoCh. 1.1 (C) Cat-(12))
4. INDOASIAN (Refer to Ch. 1.1. (C) Cat-II(8)) 3.8 ELCB & RCCB
5. L & T (Refer to Ch,3.2 Cat.-III(4)) APPROVED
6. Siemens (Refer to Ch.3.3. Cat-Il (6)) 1. ACTION / AOHUNIK (Refer Lo 2.7 Approved 1))
7. Crompton (Refer to Ch.2 1, Cat-III(3))
8. G.E.(RefertoCh2.1 Cat.-II(2)) CATEGORY -
8. GUTS (Refer to Ch.3 2. Cat.-III(7)) 1, PULSECONTROL(RefertoCh2.6 Cat.-I(1))
10. HPL (Refer to Ch.2 1, cat-III (2)) 2. MILLION&MILLTEC(RefertoCh. 1.1 (A) Cat-1(3))
11. PIERLITE - ELCON (Refer to Ch2.6 Cat,-II (4)) 3. ELLICO (Refer to Ch3.7 Approved (6))
3.7 MCB & MCB DISTRIBUTION BOX APPROVED CATEGORY - Il
1. TOYAMA (Refer to Ch.1.1 (A) Cat-III (1)) 1. GELCO(RefertoCh.1.1 (B) Cat.-III (6))
2. MILLION & MILLTEC (Refer to Ch11. (A) Cat-I (3)) 2. GRE (Refer to Ch. 2 4. Cat -(2))
3. BALKAM 3. RANI (Referto Ch.1 (C) (4))
M/s Balkam India Ltd, B-33, Old Vishnu Garden, 4. BENTEC(RefertoCh3.1 Cat-II(7))
New Delhi - 110 018 5. AECO-MEFA (Refer to Ch.3.7 Cat.-II (5))
4. ESCO 6. ANCHOR (Refer to Ch.1.1 (B)Cat -III (I))
M/S ELECTRO SPARES & Co. 1894/A/1 Inside Pade Pole 7, SUPER (Refer to Ch.2 12 (3.1) Cat.-II (5))
GandhiRoad, Ahmedabad - 380 001 8 ELECOR-CLIPSAL (Refer to Ch. 3.7. Cat,-II(11)))
8. SMPL 9. OCLEG(RefertoCh.2.12. Cat.-II(11))
M/s SARD METALS PL Plot NO45, Sector No.23, Sohna 10. Pulse / Nano (Refer to Ch. 26 Cat -I(1))
Road, Faridabad- 121005 11. SIGMA (Refer to Ch36. Cat.-II(8))
M/S General Electronics &Controls, C/71, G. LD.C. Odhav, CATEGORY - III
Ambicanagar Road, Ahmedabad - 382415. 1. GUTS (Refer to Ch.3.2 Cat -III (7))
7. ACTION (Refer to 2.7 Approved (1)) 2. STANDARD (Refer to Ch. 2.4. Cat.-II (5))
8. MAXCELPLAST (Refer to 1.2 (14)) 3, C & S (Refer to Ch.1 1. (C) Cat -III(8))
4. INDOASIAN (Refer to Ch.1.1. (C) Cat -II (8))
CATEGORY - I 5. ABB(RefertoCh1.1 (C) Cat-III(5))
1. VlMAL (Ref. to Ch. 1.1(A) Cat.-1 (5)) 6. HAVELL'S (Refer to Ch.1.1 (C} Cat -III (1))
2. S.G 7, L&T (Refer to Ch.3.2 Cat.-II(4))
3, VINAYAK 8 HPL (Refer to Ch,2 1 Cat-III (6))
CATEGORY - II 9 NANO (Refer to Ch.3.7. Cat.-II(10))
1. GELCO (Refer to Ch.1.1, (B) Cat.-III(6)) 10. PIERLITE (Refer to Ch.2.6 Cat -II (4))
2. GRE (Refer to Ch. 2.4, Cat.-(2)) 11. MDS
3. RANI (Refer to Ch1. (C), (4)) 3.9 TIME SWITCHES
4. KEW (Refer to Ch.3.1. cat-II (1)) 1. GELCO (Refer to Ch. 1.1 (B) Cat -III(6))
5. AECO-MEFA 2. L&T (Refer to Ch. 3 2. Cat -III 4))
M/S Punjab Switchgears P.L. B-30, Phase - V Focal Point, 3. OCLEG (Refer to Ch.2.12. Cat.-II(11))
Dhandari }(alan, Ludhiana - 141010 4. INDOASIAN (Refer to Ch1.1 (C) Cat-II (8))
6. NEW / NILANG (Refer to Ch.2.12.(3.1) Cat.-II(3)) 8. MDS
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
7. VINAY (Refer to Ch1 1. (A) Cat,-II(1)) 6. ELLICO
8. LEADER (Refer to Ch.1.1 (C) Cat.-II(11) 3.10 ENERGY METER
9 SUPER(RefertoCh.2.12.(3.1)Cat,-II(5)) 9 NANO Approved (Refer to Oh 3.7. Cat.-III(10))
10 ANCHOR (Refer to Ch,1.1, (B)Cat -III (I))
11 ELECON-CLIPSAL CATEGORY - I
M/s GERARD ELECTRIC INDIA PVTLTD. 1. NIPPEN
RakhJal Road, Ahmedabad -366 023 M/s NIPPEN ELECTRICAL INSTRUMENTS CO 12~A, Joy Engg
12 OCLEG (Refer to Ch 2.12. Cat.-II(11)) Compound, Maroi Maroshi Read, Andheri (E), Mumbai -
3. HPL (Refer to Ch 2.6 Cat.-III (2)) 2. HPL (Refer to Ch.2.1. Cat.-III(6))
3,11 BUSBAR CHAMBER 3. L&T (Refer to Ch3.2 Cat-III (4))
CATEGORY - I 4. G.E (Refer to Ch.2.1. Cat.-II(2))
1. PEW - APPROVED (Refer to Ch.3.1 Cat.-II(4)) 6, TRINITY
2. REIKO - (Refer to Ch 3.2. Cat.-I (1)) 119, Trinity CO. Op. Hsg. Soc. 1st' Floor,
CH Street Bhobitalao, Mumbai-
1, NEW / NILANG (Refer 1o Ch.2.12 (3 1 ) Cat.-II (3))
6. NANO. (Refer to Ch. 3.7 Cat III (10))
7. GELCO (Refer to Ch. 1.1. (B) Cat.-(6))
4.1 ALLUMINIUM & COPPER XLPE CABLES (ALL Type)
1, BENTEC (Refer to Ch. 3 1 Cat -II 17))
1. UPTO 35SQ MM ANYISI MARKED WHICH IS APPROVEDBY
2. ANCHOR (Refer to Ch.1 1. (B) -Cat-III(1))
M/s Jainflex Cables RL , A-2/1, Sabarmati Industrial Society,
Sabarmati, Ahmedabad -
M/s. ALLWIN INDUSTIRES, Serve No. 251, PIot NO
B/h. Devsaon Ceramic, Shapar - Veraval Dist Rajkot
M/s REI INDUSTRIES LIMITED 803, Siddhanath Complex, Nr
3.GELCO (Refer to Ch.1.1 (B) Cat-III (6))
Express, RC Dutt Road, Baroda-
M/S Chandresh Cables Ltd 1108, Village Chhatral, Ta. Kalol
Dist Gandhinagar, North Gujarat
M/s MECAB Cables P.L.635/A, Phase IV,
GIDC, VATVA, Ahmedabad -
M/s ORBIT POWER & CONTROL CABLES (I) 56 A, Dilshad
Garden Industries Area, Shahdara, Delhi-
M/S ODIAN INDUSTRIES, Opp RaviVidhyalaya, Nr. Gandhi
46/02, NewAhmedabad Industrial Estate, Nova Petro~ Chem,
Porbandar Road~ Madhapa~ Rajkot - 300
Moraiya, Sanand, Ahmedabad
7. WINFLEX & WlNCAB
M/s. Ravin Cables Limtied, 302, Akruti Trade Centre, 3rd Floor,
K.P. Industires, 53,54, Krishna Estate, Panna Estate Road,
Road No 7, MIDC, MarolAndheri (E), Mumbai-400 0.93¸
B/h BOC Gases, Nr, Soni's Chal Rakhial Ahmedabad -
M/S RALLIS ON ELECTRICAL P.L. 205, Shreyas Complex, Opp.
M/s VARSHA CABLES PVT LTD. Plot No,65, A-2, Hootagalli
Industrial Area, DIC Layout, Mysore -
Derasar Navrangpura, Ahmedabad -
M/s RATA RIA INDUSTRIES PVT LTD
M/s Jay Industires , Bintex House, Bhavnagar
Off-34-44, Industrial Area, Ratlam - 457001, MP. [ INDIA]
Road, Nr. Rajmoi Ind. Rajkot
10. ZENIUM CABLES
M/s ZENIUM CABLES LTD 118, GAurav Garden, Opp Bharat
M/s Scot Innovation Wires & Cables P.L,
Petrol Pump, Mira Bhayander Road, Mira Road, Mumba-
195/1,197/1, Jharmajri Baddi, Dist Solan (MP)
M/s Teracom Limded, "Teracom House, B-
M/s Bonton Cables (INDIA] PL. A-114-115,
84, Sector No 60, Noida - 201301 U.P. (India)
RICO Industrial Area, Phase - I, Bhiwadi, Rajasthan
12, HAVELLS (Refer to Ch,1 1, (C) Cal.-III (I))
M/s Sight Sound Electronic (I) P.L.
A-128, Wazirpur industrial Area, Delhi-110052
M/s NIKi CabIes Industries, E/9B PanchratnaAppt Opp.
32. TERACAB INDIA
Sunview Tower, Memnagar, Ahmedaba-52
M/S TERA CABLES & IND.P.L, VILLAGE KALANA,
14. LEADER (Refer to Ch.1 (C) Cat.-IIl (10))
PO CHHARODI FARM, SANAND,AHMEDABAD
M/s Finolex Cables India 108, Mahakant Building, Opp. V.S.
M/S Helly Plast Industries 17/18, Nirman Industries Estate,
Hospital, Ashram Road, Ahmedabad - 380
Opp Samshan Gruh, A.K. Road, Surat-8
Cali Plast Processor, 47, Narayan Estate, Near Raipur Mills,
Saraspur, Ahmedabad - 380
M/S Vardhman Cables & Controls, Belgaum
Cali Plast Processor, 47, Narayan Estate, Near Raipur Mills,
M/S Core Cables Pvt Ltd 202, arpan Complex,
Saraspuq Ahmedabad - 380
Opp Swaminarayan Mandir, Kalawad Road, Rajkot-360001
M/s Jay Cable Industries, PIot No 80, Tribhuvan Industrial
M/S R R Kabel Limited, 305/A, Windsor Plaza, RC. Dutta Road,
Estate, Opp, Road No 11, Kathwada GIDC, Kathwada,
Alkapuri, Vadodara-390007
M/S Atlas Cables & Accessories P.L PIot NO. D/2, Sector NO
M/s Bhumi Cables & Wires Pvt. Ltd. PIot No. D-101/102,
Heavy Ind Area, Gandhidham Gujarat
Road-C, Lodhika G.I.D.C., (Metoda) Kalaward Road, Rajkot
M/S Popular industries, 12, Sudama Estate, B/h Calico Nagar,
M/s. CabCem India, 304, 3rd Floor, Aggarwal Cid Mall
(Opp M2K Pitam Pura Multiplex), Road NO. 44, Pitampura,
sarkhej Road, Narol, Ahmedabad
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
21. DICAB ALLUMIBIUM & COPPER XLPE CABLES (ALL Type)
M/S DIMOND POWER INFRA. LTD. ABOVE 35 SQ. MM & UP TO 185 SQ.MM
PHASE II, VILLAGE VADALA, TA SAVLI, VADODARA
22. JAINFLEX 1. ALLCAB~RefertoCh4.1 (2))
23, PRIMCAB (Refer to Ch.4.1. (26)) 2. VARSHA (Refer to4.1, (8))
24. TEBACAS INDIA (Refer to Ch.4 1. (32)) 3. KUNTHCAB (Refer to Ch 4 1. (5))
25. L&T 4. MITUSHI (Refer to Ch.4 1. (31))
26. AVOCAB (Refer to Ch4.1 (4)) 5.RALLISION (Refer to Ch 4.1. (27))
27. TEREXEL (Refer to Ch.4 1 (30)) 6. LOOKMAN (Refer to Ch 4.1 (25))
28. BHARATCAB (Refer to Ch.4.1. (34)) 7. NIKl(RefertoCh~41 (13))
29. ZENIUM CABLES (Refer to Ch.4.1 (10)} 8. KEI (Refer to Ch.4 1 (23))
30. RRKABLE (Refer to Ch.4.1. (36)) 9FINOLEX(RefertoCh4.1 (15))
31. WINPLEX & WINCAB (Refer to Ch 4.1. (7)) 10CABCOM (Refer to Ch 4.1 (20))
32. ADCAB (Refer to Ch,4.1 (37)) 11. KAMALEX (Refer to Ch.4 1. (19))
33. POPULAR (Refer to Ch.4,1, (38)) 12 MECAB (Refer to Ch.4 1. (24))
13 DICAB (Refer to Ch.4.1. (21))
ALLUMINIUM & COPPER XLPE CABLES (ALL Type) ABOVE 14, HAVELLS ,(Refer to Ch1.1 (C) Cat-Ill (1))
185 SQMM 15. BONTON (Refer to Ch 4.1 (11))
1. HAVELL'S (Refer to Ch 1.1 (C) Cat.-III (1)) 16. SONALGOLD (Refer to Ch 4.1: (17))
2. ALLCAB (Refer to Ch 4.1, (2)) 17 SHREEJl(RefertoCh4.1 (16))
3, KUNTHCAB (Refer to Ch,4.1 (5)) 18. WINFLEX (Refer 10 Ch4 (7))
4. TEREXEL(RefertoCh4.1 (30)) 19. HI-FLEX (Refer to Ch4.1 (33))
5, TERACAB INDIA (Refer to Ch.4 1 (32)) 20, CORE CAIDLE (Refer to Ch 4,1 (35))
7. AVOCAB (Refer to Ch.4.1(4)) 21. HITEX PLUS (Refer to Ch 4.1, (18))
8, GEMSCAB 22. JAINFLEX (Refer to Ch 4.1 (22))
M/S GEMSAD IND LTD. PREM SADAN - 11, RAJENDRA 21, POPULAR (Refer to Ch.-4 {38))
PLACE NEW DELHI - 110008 22. NEOCAB
9. PRIMECAB' M/s R.S. Industires, Anand Industrial Estate, Borsad Chokdi,
M/s Ravin Cables Limited, 302, Akruti Trade Centre, 3rdFloor, Anand -
Road No,7, MIDC, MarolAndheri (E), Mumbai - 400 093 23. CAPTON &Arormac
10. PELEC M/s MILAN INDUSTRIES, Plot NO 12, Sarthi Complex, Opp, GV
43, Sudama Estate, B/h, Swatik Bansidhar Mills, Narol Cross M.M., ODHAV, Ahmedabad
Road, Ahmedabad ~ 382405 24. RUBICON
11.HITEX PLUS (Refer to Ch-4.1 (18)) M/s. RUBICON CABLES !NDUSTIES, C-1/89/6, Nr. Pushpak
12.POPULAR (Refer to Ch.4.1 (38)) Estate Cross Road, GIDC. Phase - 1, VATVA. Ahmedabad -
13. LOOKMAN (Refer to Ch.4 1, (25))
14. KEI (Refer to Ch.4.1. (28)) 25 EON
15. RALLISON (Refer to Ch.4.1 (27)) M/s. Eon Electric Limited
16. CORE CABLE (Refer to Ch.4.1. (35)) B-88, Sector 83, Nolda -201305, U.P, INDIA
17. POWERCAB 26, VIMAL, [Refer to Ch -1.1(A) Cat - I (5))
M/s. SMRUTI CABLES PVT LTD. Plot No 2, Block No 243, 27. HPL (Refer to Ch2.1 Cat-III (6))
Nr. Ramdev Exports. Santej Vadsar Road, Ta. Kalo, Dist 28. NANO, (Refer to Ch.3.7 Cat (14))
Gandhinagar - 382721 29. ZENIUM CABLES (Refer to Ch.-4 (10))
18. ZENIUM CABLES (Refer to Ch.4(10)) 30. CORE CABLE Refer to Ch.41 (35))
19. RRKABLE (Refer to Ch,4.1 (36)) 81. KAMALEX (Refer to Ch 4.1 (19))
20. ADCAB (Refer to Ch.4.1, (37)) 32. CABCOM (Refer to Ch.4.1 (20))
83. MECAB (Refer to Ch.4.1 (24))
FLEXIBLE WIRES & CABLE /INDUETIRES WIRES / FRLS 34. RALLISON {Refer to Ch.4.1 (27))
WIRES/ PVC WIRES / CO-AXIAL CABLE, SUBMERSIBLE CABLE 35. SHREEJI (Refer to Ch.4,1 (16)
/ ZH FR 36. SONA GOLD(Refer to Ch4.1 (17))
CABLE ETC 47. HITEX PLUS (Refer to Ch4,1 (18))
ANY ISI ( MARKED WHICH IS APPROVED BY 68. VARSHA (Refer to Ch-4.1 (8))
DEPARTMENT 88. L&T
46. FINOLEX (Refer to Ch4.1 (15))
1. ALLCAB (Refer to Ch4.1 (2)) 41, RRKABLE (Refer to Ch.4.1 (36))
2. AVOCAB (Refer fe Ch4.1 (4)) 42. ADCAB [Refer to Ch 4.1 (37))
3. HAVELLS (Refer to Ch,1,1. (C) Cat -III (1)) 43. WINFLEX & WINCAB (Refer to Ch.4 1(7))
4. KONARK 44. JAINSON
M/s. Servo Cable industries 90/5, Mandir Marg, Indl Complex, M/s. Jainson Cables india P.L Surve NO. 16, Plot NO. 16A &B
Haiderpur, New Delhi-110052 Ahmedabad Mehsana Highway Village Chandarda Post
5.KUNTHCAB (Refer to Ch 4.1. (5)) Ghumasan, Ta. KadL Dist Mehdanad-382718
6.BHARAT CAB (Refer to Ch.4 (5)) 46. GELCO - SUBMERSIBLE CABLE (Refer to Ch.4.1 (3))
7.VINAY (Refer to Ch 1.1. iA} Cat.lI (1)}
M/s Scot Innovation Wires & Cables P.L., 5.t CEILING FANS & TABLE FANS
195/1, 197/1, Jharmalri Baddi, Dist. Solon (M.P)
9.TERA-CAB-INDIA (Refer to Ch4.1 (4)) 1. ORPAT .APPROVED (Refer to Ch.1 1A) Cat III (2))
10.EcoTEK ZHFR 2. USHA
M/s SHAKUN POLYMERS LIMITED, 501/502, IVORY M/S, USHA iNTERNATIONAL LTD 1st Floor, Super Market, Nr,
TERRACE, R.C.DUTT ROAD, ALKAPURI, VADODARA - 390007 Natraj
11NIKI (Refer to Ch.4.1 (13)) Cinema, Ashmram Road, Ahmedabad - 380
12.JAINFLEX (Refer to Ch4.1 (22)) 3.ANCHOR[ (Refer to Ch 1.1(B)Cat -III (1))
13.SINTEX (Refer to Ch4.1 (28)) 4.CROMPTON (Refer to Ch.2.1, Cat -III (4))
14, DARSBAN PLUS 5. BAJAJ (Refer to Ch,2.1. Cat -II (3))
M/S DARSHAN CABLE INDUSTIRES C/1 135/A, PHASE -I, 6.Philips (Refer to Ch.1.1 (C) Cat.-III (4))
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
VATVA GIDC ESTATE NR PUSHPAK ESTATE, AHMEDABAD 7.KHAITAN
16. INDOASIAN {Refer to Ch,1.1. (C) Cat.-II (8)) M/s Khailtan Electric, ale, 101/102, Mahakant Complex;
16LEADER (Refer to Ch1 .1.(C) Cat.-II (10)) Opp, V.S. Hospital, Ashram Road, Ahmedabad - 380
17.GEMSCAB (Refer to Ch.-4.2 (3)) 8 DECON
18,ACT{ON / ADHUNIK (Refer to 2.7 Approved (1)) M/s Decon Lighting, Y-43, Okhak Phase - II New Delhi-l10023
19. ANCHOR (Refer te Ch1.1, (B)Cat.-III (1) 9.HAVELL'S (Refer to Ch.1.1, i) Cat.-III (1))
20. BENTON (Refer to Ch.-4, (11)) 10. ALMONDARD
8. RIDER 11. CINNI
9. OCLEG 12. REMI
10. ELLICO 13. KEDIA
11. PULSE 14. NOVA
EXHAUST FANS, BRACKET FANS & PEDESTAL FANS 16. ORIENT
(A).CATEGORY - I 17. INDO PLUS
M/s. The Universal Appliances (India) Nalagarh Dist Sona(H.P)
1. ANCHOR (Refer to Ch 1.1 (B)Cat III (1))
2. ORPAT (Refer to Ch.1.1. (A)Cat.III(2)) ENERGY SAVING 50 WATT CEILING FAN
4. NOVA 1. HAVELL'S (Refer to Ch.1.1 (C) Cat.-III(1)
5.EPC 2. CROMPTON (Refer fe Ch.2,1. Cat.-III (4))
6. REMI 3. BAJAJ (Refer to Ch.2.1, Cat (3))
7. KHAITAN 4. USHA (Refer to Ch.-5. (2)
8.INDOPLUS(RefertoCh-5.1 (17)) 5. ORIENT
· CATEGORY-II 7. KELTRON
1.USHA (Refer to Ch.5 (2)) 7.Pulse l Nano (Reter to Ch 2.6 Cat I (1))
2.HAVELL'S (Refer to Ch 1.1. (C) Cat.-III (1)) CAPACITOR
3,CROMPTON (Refer to Ch.2.1. Cat. III (4))
4.BAJAJ (Refer to Ch.2 1. Cat.-II (3)) 1.HAVELL'S(RefertoCh 1.1 (C) Cat-III(1))
M/S Matrix Control & Engineering P.L, E 725, DSIDC Indusidal
6. ORIENT Complex, Narela, Delhi-110040
8.G.E.C. M/s. Power Matrix Solution P.L. 4018 & 4019, Bhandup Ind
CHAPTER -VI Estater PannalalCompound, Off LBS Read, Bhandup [WI,
SMC PRESS MOULDED BOX FOR STREET LIGHTS Mumbai
1.SINTEX - APPROVED 4,JILCO (Refer to Ch 2.1. Cat-Ii (6))
M/S SINTEX INDUSTRIES LTD KALOL 5.UNIVERSAL
(NORTH GU JARAT) PIN - 382 721 M/s Care Enterprise FF-9 ShalimarComplex,
2, EVEREST-APPROVED Maha]laxmi Five Road, Paldi, Ahmedabad-380007
M/S EVEREST ELECTRICALS 133, PRINCESS STREET,
GOPAL NIWAS,1 ST FLOOR, ROOM NO 9/10/11, MUMBAI - ON LINE UPS
3.ESCO - APPROVED (Refer to Ch 3.7. Approved (4)) 1.GRE (Refer to Ch.2 4. Cat II(2))
4.NATIONAL 2.SUVIK (Refer to Ch.-6 (3))
M/s. R M Enterprise 203/B, Gurukul Tower, Jaywant Sawant 3.KEPREJ (Refer to Ch.*6 (4))
Road, Dahisar [W] Mumbai - 400068 4.OCLEG (Refer to Ch.2.12 Cat -II (11))
5. EPP 5.CONSUL (Refer to Ch 6 (6))
M/s EP Composites PL Plot No 2646, Kranti Gate Main Road, 6.SERVOTECH (Refer to Ch -6 (5))
GIDC Lodhika Ind Estate, Kalawad Road, Metoda, Rajkot-860021 7.NUMERICUPS
M/S, Numeric Power System Limited umeric House NO. 5 Sir P.
AIRCONDITIONERS, WATER COOLERS APPROVED SI
Sivasamy Salai, Mylapore, Chennai 600004 India
1. DIAKIN 8.KELTRON
M/s Daikin Air-conditioning India PL. 12th Floor, Building No. 9, WATER HEATERS
Tower A, DLF Phase IIl, Gurgaon-122022. Haryana. CATEGORY - I
2.MISHIBISHU ELECTRIC 1.BAJAJ (Refer to Ch.2.1. Cat -II (3))
M/s. Mitsubishi Electric India PL Primate 303/A, 3rd floor 2.USHA (Refer to Ch.-5 (2))
Judges Bungalow Cross Road, Bodakedev, Ahmedabad. 3.INDO PLUS (Refer to Ch 5 1. (17))
MIRC Electronics, ONiDA House, G-l, MIDC CATEGORY - II
Mahakali Caves Road, Andheri [E] Mumbai -
4OGENRAL 1.JILCO 2.SPHEREHOT3, RECOLD 4. VENUS
5.BLUE SATAR MOTOR PUMPS
6. PANASONIC MOTOR PUMP STARTERS & STARTER ACCESSORIES
7.VOLTAS APPROVED
8.CARRIERS 1. GELCO (Referto Ch.1.1 (B) Cat-III (6))
9.AMTREX 2. OCLEC
SERVO CONTROLLED VOLTAGE STABILIZER& ELECTRONICS 3. PULSE
POWER CONDITIONERS 4. ELLICO
1. GRE (Refer to Ch 2 4, Cat.-II (2)) 5. L.S.
2. GELCO (Refer to Ch.1.1. (B) Cat.-III (6)) CATEGORY - II
3. SUVlK 1. CROMPTON (Refer to Ch 2.3. Cat.-III (4))
M/S SUV[K ELECTRONICS RL. SECTOR NO 28, INDUSTRIAL 2. JYOTI
ESTATE, GANDHINAGAR. 3. AEW
4.KEPREJ 4.PECO
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
M/S KEPREJ ELECTRONICS, SECTOR NO. 28, INDUSTRIAL M/s. Poco Industries Estate, Nr. Gota Flyover Gota Road,
ESTATE, GANDHINAGAR. Ahmedabad-382481
5 SERVOTECH CATEGORY III
M/S. SERVOTECH POWER SYSTEM PVT LTD. D-212, 1. HAVELL'S (Refer to Ch.1.1. (C) Cat -III (1))
Sector-2, DSIDC, Bawana Indi Area, Delhi. 2. BCH (Refer to Ch 3.4. Cat.-III (3))
6. CONSUL 3. C&S GEWISS (Refer to Ch.1.1, (C) Cat -II (8))
CONSUL CONSOLIDATED PVT LTD 4/329A, Old 4. L & T (Refer to Ch 3.2. Cat-III (4))
MahabalipuramRoad,Chennai - 600041 5. Siemens (Refer to Ch 3.3. Cat.-II (6))
SINGLE PHASE MONO BLOCK PUMPS 6. ALSTHOM
CATEGORY-II 7. SUECO
1. AMIT /Refer to Ch.1.2(13) POWERAND CONTROL PANEL I PANELACCESSORIES
2LUBI 1. C&S GEWISS (Refer to Ch.1.1 (C) Cat.-III (8))
B\h Lubi Elect Memco. Naroda Road Ahmedabad 2. GELCO (Refer to Ch1.1.(B) Cat-II (9))
8. UNEEL 3.TRINITY (Refer to Ch,3 I0 Cat-I (5))
M/S UNNATI INOUSTIRAL CORPORATION D-61. Diamond 4. NIPPEN (Refer to Ch 3.10 Cat-I (1))
Park G I D C. Nr Nana Chiloda N H NO 8. Naroda - 5.STANDARD (Refer to Ch.2.4. Cat.-II (5))
Ahmedabad - 382330 6. L&T (Refer to Ch.32 Cat.-III (4))
4. PRIMA 7. OCLEG (Refer to Ch 2.12. Cat -II (11)
M/s. Prima Pumps P L34 GV.M Au VasanaT Odhav 8.ELICO -APPROVED
Ahmedabad - 382410 9, L,S, - APPROVED
5. SABAR 10, PRATHAM - APPROVED
M/s SABAR PUMP PVT LTD 3704/A. G I D C Estate Phase - IV 11. SAHIL - APPROVED
B/h New Nirma Chemicals vatva Ahmedabad - 382445 12. MEGAWIN-APPROVED
CATEGORY III 13. ACTION /ADHUNIK (Refer to Ch ~2.7 Approved (1))
1. CROMPTGN Refer to Ch 2 1 Cat.III(4) 14. SKY
2SIEMENS RefertoOh23. Cat-III(6) M/s. Sky Control System 160, Vikas Estate, Opp Anil Starch Mill
3KIRLOSKAR Road Nr Vrma Yojna Hospital Bapunagar Ahm¢dabad
OPEN WELL TYPE HORIZONTAL MONO BLOCK PUMPS CATEGORY - II
CATEGORY - I 1.CROMPTON (Refer to Ch.2 1. Cat-III (4))
1. PRIME 2 DUKE
2. SABAR M/s Duke PlastoTechnique PL N.H 14 Deesa Highway
CATEGORY -II Opp'. Hotel Green Wood, Badarpura. Palanpur -
1. UNEEL Refer to Ch.9(3) 3.SABAR (Refer to Ch 9. (5))
2. AMRUT 4.JASCO
M/sAmit Engineering PL PO No 4141 2ndFIoor, Motilal Centre Nr WS JASCO PUMPS PVT LTO 47, Phase -I, G.I.D.C., Mangal
Dinesh Hall Ashram Road Ahmedabad - 3800009 Estate, Naroda, Ahmedabad -
3AMlT(RefertoCh1.2(13)
4. LUB (Refer to Ch.9 (2) CATEGORY - III
5.CROMPTON (Refer to Ch.2.3 Cat-III(4) 1. UNEEL (Refer to Ch.9 (3))
6,DUKE 2. AMRUT '~Refer te Ch 9 (2)
7PRIMA 3. LUBI (RefertoCh9(2))
8. KIRLOSKAR 4. DUKE (RefertoCh.9Cat II (2))
STARTER PANELS [APPROVED] 5. KEB
1. GELCO RefertoCh1.1(B) Cat-III (6) 6. KIRLOSKAR
2. SAHIL CHAPTER X
M/s SAHIL ELECTRO SYSTEM 163 Vi kas Industrial Estate SUB STATION EQUIPMENTS
Opp Anii Starch Mills Nr Vlmayojna hospital Nutan Mills Road APPROVED
3. HAVELL'S Referto Ch1.1 (C)Cat-III(1) 1BIECCO (Refer to Ch3 5. (Approved)-1)
4. OCLEG RefertoCh2.12 Cat-(11)) 2.HAVELL'S (Refer toCh 1.1 (C) Cat-III (1))
5.L&T Refer to Ch 3.2. Cat III( 4) 3,VOLTAMP
6. SAMUDRA 4.MATRIX
M/S Samudra Power Products, PIot No. 32, Road No, 5/A, 5MEGHAWIN
G ID.C. Kathawada, Ahmedabad - 380415 6 PMX
7. SUECO CATEGORY - II
M/s SHREE UMIYA ELECTRICAL CO. 304 SHAILLY HOUSE, 1. UNIVERSAL
HARIHAR PARK SOCIETY Nr OLD HIGH COURT, RAILWAY M/s Unirversal Power Xmer Ltd. 26/A 2nd Phase,
UNDERBRIDGE, NAVRANGPURA, AHMEDABAO - 380009 Peenya Industrial Area, Bangalore -
8. ELLICO 2. SKP
CATEGORY - III CATEGORY - III
1. C&S GEWISS (Refer to Ch.1.1, (C) Cat-III(8)) 1.CROMPTON (Refer to Ch.2 3. Cat.-III(4))
2. BCH (Referto Ch3.4 Cat-III(3)) 2.L&T(Refer to Ch 32 Cat -III(4))
SUBMERSIBLE PUMPS 3.KIRLOSKAR
CATEGORY - I 4ALSTOM
1.AROMA 5C&SEFACCCE
M/S ARtHANT PUMPS PVT. LTD., Near Ladbi TRANSFORMER
Nala, Deesa Highway Palanpur- 385 001 TRANSFORMER SHOULD COMPLY E.C.B.C, CODE CRITERIA
2. PLUGA-APPROVED 1. TRANSFORMER-APPROVED
M/S Shroffs Engineering Limited, 850/2, MIS Danke Electncars Ltd 778/780 G. IDC Estate,
G I.DC Estate Makarpura, Vadodara - 390 010 Weghod~a - 391760, Baroda - Gujarat
3. JEE-APPROVED
M/S Jee Pumps (Gui,) P.L PIot No L 1 & 2, GIDC Nr. Water Tank, CATEGORY - I
Odhav - Ahmedabed - 382415 1. POWERLITE
4. FALCON -APPROVED 2. INSTA POWER
M/s Falcon SubmerSible PL. Survey No 39/4, Vavdi Industiral 3. SHILCHAR
4, VARDHMAN ELECTRO-MECH
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
area gondal road Ralkot –
M/S. Koklla Electricals TB Hoapmtal Road, Viiapur-382770 Dist
4. ARYA-ELECTRONICS (AE)
Plot No 198/1, GIDC-IV SIhor Ghanghali Road, B/h. Sitaram
weight Bridge, sihor Gist Bhavnagar
Raychem. RPG House, 463, Dr. Annie Basant Road,
Worli, Mumba~.40039.
M/s Powelite Electricals PIot No 627, Nr Gayatri Temple,
Phase- 4, G.I.D.C. Estate, Naroda, Ahmedabad -382330
Note:- Other products are supposed to be included as per latest approval of Superintending
Engineer, Electrical (R &B ) Circle Gandhinagar as on or before last date of submission of tender.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
NEW ITEMS APPROVED
N Name of Company Brand Name Description of Make Remarks
1 M/S Vijayshree Electromech (p) Ltd WELLTECH 1. Swaged Steel Tubular poi /Stel Cat-II
103, vedant complex, 7 Kalpana Octagonal pole / Steel conical pole/GRP
Society, / FRP Pole Approved
B/h N.V.P.R.O off CG Road, 2. SMC/DMC Junction bax/G I Race way
Navrangpura,Ahmedabad - 009 -Trunking/GRP Cable Tray/G.I. Cable Tray
2 M/S Bajaj Electricals BAJAJ 1. High Mast / Octagonal pole / GRP poles Cat -III
LimitedAhmedabad / Decoralive Polesi Conical GI Pole
3 M/sJayCopper&Alloys P.L. ELECTRO- 1 GalvanizingEarthing[ChemicalBarthing Approved
Plot No 2219, Nr Shah Alloys Ltd., EARTH - 1/2/3 Mtr
Science City To 2 Copper Earthing [ Chemical Earthing Approved
Khatraj Road, Village - Santeh - 1/2/5 Mtr
4 M/S Prestolite Corporation (Refer Ch PRESOLITE 1 High Mast pole upto 30 Mtr Approved
2.6 Cat qll (3)
5 Mis Surya Roshni Ltd Ahmedabad S URYA 1 High Mast / Octagonal Pole Cat. III
6 MIs Kemrook India KEMROK 1 FRP Lighting pole Approved
7 Mis Accurate Eng. LTd. ACCURATE I High Mast / Tower Approved
8 M/s. Sumip Compostes Pvt. Ltd SUMIP 1 FRP Light Pole / FRP Cable Tray / Trefoil Approved
Clamp / Luminaries / FRP Leader
9 Mis.Aster ASTER HIGH Mast Pole Cat II
10 M/S Ammini Eng. System P.L. AMMINI Out Door Street Light Approved
11 M/S GELCO ELECTRONICS P.L. GELCO Motor control cubical panel, Electrical Approved
(Refer. Ch1.1 Cat -III (B) (6)) Starter for A.C. etc
12 Transrail Lighting Ltd TRANSRAIL 1 High mast Pole 2 Street Light Pole Cat III
A-201/209, Boomerang Complex, (Conical / Hexagonal / Octagonal / swage Cat III
ChandivaIi Farm pole)
Road, Andheri [E], Mumbai -
13 M/s Halonix HALONIX 1 Land Scape & Garden Light / High Mast /
(Refer Ch2.1 Cat -III (4)) All type ~uminers Ill
14 M/S, Megawin MEGAWlN # United Sub-Station upto 12kw # Control Approved
relay panels custom built # SF 6 Ring main
units upto 36 kv # Auto reclosers &
capacitor switch upto 36 kv # Air insulated
load break switchgear upto 36 kv # Metal
porcelain clad VCB switchgear upto 36 kv
15 M/s. THRON LIGHTING THRON Street Light / Landscape & Garden Light III
C/o 10, ParshwanathAptt Somnath
Lane, Opp. Tole Exchange Sahibaug,
Ahmedabad-380004
16 M/s. Control & Switchgears C&S # Indoor Air insulated Metal Clad III
Contractors Ltd Switchgear with VCB # Compact SF6
9th Floor, HERITAGE, Nr. Gui. insulated Ring main units for Indoor &
University, Ashram Outdoor installation
Road, Ahmedabad-380009,
17 Mis. Keselec Schrader Pvt. LTd SCHREDER # Indoor & Outdoor Decorative Pole & III
69 Friends Colony, West, New Delhi - Bracket # Premium Light Fixture # Furyol
110065 140 w compolis with dimmable electronics
ballast # Contemporary / classic /
Traditional City Lighting # Urban Lighting
# Indirect / direct lighting I free standing Mi
lighters # Compact recessed & surface
mounted luminaries # Modular recessed &
surface mounted luminaries#Wall ceilin
& pendent mounted luminaries # Row
lighting system # Spot Lighting & track
system #Luminaires with increased IP
rating & special luminaries # Emergency
Luminaries / Outdoor luminaries # Access
cries & light sources
18 M/s. Regent Beleuchtungs Korper AG REGENT Description of Make III
Dornacherstrasse
OH 4018 Basel Swizerland
CIo Bharat Becb Corporation,
Abhigam,Opp Dr. House, Nr. Padmal
Rly. Crossing,Ahmedabad.
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
No Name of Company Brand Name Description of Make Remarks
19 M/S Sylvania India Ltd SYLVANIA # Down lighter # Fluorescent Recessed III
ORG Towers 2D Sector 126, # Florescent surface mounted/suspended
Expressway Noida # Spot Lights # Track # Ambient/Decorative
[UP] - 201304 # Pendants # Battens / Trunking system
# High protection # High Bay / Low Bay
# Amenity / Bolla rd # In Ground / wall lights
# Flood light # Pole top
20 M/s Ligman Lighting india Pvt Itd LIGMA # Architeural Outdoor Lighting III
Plot No. 4th Floor, Gulmohar Plaza,
ITl Road,Aundh Pune-411007.
21 M/S Philips India Ltd PHILIPS # Indoor Lfghting # Public Lighting III
M/S Philips Electronics India Ltd System
# Spods Lighting # Urban Decorative
Lighting # Landscape Lighting # Special
Application Lighting # Lighting Control for
Indoor & Outdoor Lighting system
22 M/S ABB (Re ABB # Composed Substation # Ring Main III
fer Ch 1.1 (C) Cat III (4) unit
23 M/s. WIPRO WIPRO # High Mast Motorized & Not Motorized III
(Refer Ch-2.1 (C) Cat-III(5) #( Pole - Octagonal, Decorative
Swaged and All type of tubular pole
24 M/S Aspire Composites, Survey No ASPIRE FRP Industrial Lighting Products Approved
Opp Reliance Petrol Pump.
Madhapur-Anjar Highway
Village Madhapur, Bhuj Kutch
25 M/s REX POLYEXTRUSION LTD, REX # DOUBLE WALL CORRUGATED PiPE Approved
Kumar Plaza,1st Floor, 1077, North # NON THREADABLE COMMUNICATION &
Shivajinagar, ELECT, INST' CONDUIT PIPES
Opp K.W C. College, Sangli -
26 M/s DURA-UNE INDIA PVT LTD, Plot DURA - # Conduit Systems for Electrical installation Approved
No. 24-25Verna Etectronics City GUARD : & Communication tnstaliation Non
Phased!A, Verna Salcete Threadable of size upto 200mm OD
GOA-403722 (North Goa)
27 M/s Trupati Plastomatice Pvt Ltd GEMINI # HDPE Corrugated Sheathing Ducts & HDPE Approved
F-543 Road, No 6 D VKI Area, Jaipur - Double Wall Corrugated Pipe (DWC)
28 M/s Aashcube Lightng PL (Refer, Aash Cube # Gate / Bollard Light Cat-I
ch.26 Cat.-I (7))
29 M/S Havell's India Ltd, HAVELL's # Hume Free Electronics Regulator Approved
(RefertoCh 1.1 (C) Cat-III(1))
30 M/S GRE Electronics Pvt Ltd Approved
Plot NO 423, G.I.D.C II, Dediyasan GRE # Hume Free Electronics Regulator
31 M/s. GELCO ELIZCTRONICS PVT LTD GELCO # Hume Free Electronics Regulator Approved
(Refer to Ch. 1 1 (B) Cat.-III (6))
32 M/s VALMONT STRUCTURES PL, VALMONT # High Mast, Octagonal Pole, Conical Cat-III
909/910, FILIX LBS Marg, Bhandup Pole,decorative Pole, Stadium Mast
33 M/s MAXCEL PLAST 133, Shree Ram MAXCEL # YUVA Gang Box, Modular Box, Mudlar Plastic Approved
Ind Estate, PLAST Concealed Box, G.I Metal Modular Box, Plastic
B/h C M C.Anum Eng Compound, Nr. Fan Box, Point Box, Polycarbonate Lamp
Sonis Chawl Holder, Nice Holder Plate / Fan Plate Pipe
Cross Road, ODHAV, Ahmedabad- Fitings Accessories
34 M/s,THE UNIVERSALAPPLIANCE INDO PLUS # Geyser ISl [Geyuser Metal Approved
(India) 1,6,10,15,25,Ltr]
Nalagarh Dist Sona (HP) # [Geyser ABS 5 Star Rating-15, 25 Itr] Approved
[Geyser ABS [1,6,10, LTdr, 50 Ltd
# Immersion Heater ISI [1.5,2.0 KW] Approved
# Heat Convertor ISI [Super ISI, Super Approved
Dlx IS U Type (HOTAIR ISI)
35 M/s PECO industries,, PECO # HRC Fuse & Fuse Link
(Refer to Ch 9 Cat-II (4))
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
LIST OF PREFERRED MAKE & CATEGORY OF EQUIPMENTS & MATERIALS
Sr. NAME OF EQUIPMENT/ PREFERRED MAKE
1. MCCB/MCB/ELCB/RCCB/spp & ABB / L&T /Schneider
other Switch gear(Plug &
2. LT Cable/ Wire RR kabel/ Finolex / Polycab / KEC
3. LED indoor/outdoor light Halonix/ Bajaj/ Crompton/ Philips/
4. Contactor ABB / L&T /Schneider
5. LT Panel CPRI approved
6. Cable Joint Kit 3M/Denson/raychem
7. Time switch ABB / L&T /Schneider
8. Motor Lubi/texmo/cromptan/CG
1. The approved makes given above are applicable in general. However final approval has to
be taken from the GMB before execution of any item. GMB has the right to choose any of the
2. The successful contractor has to obtain approval for all the samples from the GMB before
use. Without approval, GMB has the right to ask to remove that material from the site.
3. Another make will be as per approval of EIC. Contractor should bound for that.
Signature of Executive Engineer (M),D’cell
Contractor. GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. Along with LT cabling works & all other relevant work
at GMB Port of GMB as mentioned in. This document along with standard specifications,
and installation standards and other related drawings / documents in this package will
form part of the contractor's scope of work.
DETAILED SCOPE OF WORK:
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. Along with LT cabling works & all other relevant work
at GMB Port of GMB as mentioned in Schedule-B. At Porbandar Port of GMB.
Date of starting of the work will be mentioned in the work order and time limit for the
same will be considered accordingly. If site is not ready, execution may possible any
time within 24 twelve months on issuance of acceptance letter, for which separate work
order will be issued and time limit will be considered from the date mentioned in the
The contractor has to buyback scrap material generated during the work at Recovery
rate of GMB at actual weightiest base/ no. base/ meter base as applicable with due
consultation of EIC and amount will have to deposit to GMB NON PLD Account with tax
(as applicable).EIC or his representative’s decision will be final if they want to keep any
The tenders will be decided after detailed Technical scrutiny.
Signature of Executive Engineer (M),D’cell
Contractor. GMB, PIU-Porbandar
Maintenance and Repairing of High Mast lighting towers of various area at GMB
Porbandar Port for 24 months. 2026-27
ITEM SPECIFICATIONS
Item No.1 & 2: Providing of wireman and Electrical Helper everyday
Providing of wireman Electrical Helper, everyday 8 hr shift x 365 days including the
cost of meals, accommodation, tools, tackles, safety equipment, insurance etc. to attend
daily fault and to daily routine maintenance of all electrical installation as directed by
Electric section. Electrician must possess relevant educational qualification and have an
experience of LT electric maintenance works. Required tools, tackles, hand gloves,
safety shoes, helmet or other safety equipment should be provide to them by the
contractor, and which should be verified to DEE (E) PBR. Necessary daily attendance
should be register at local GMB office. Necessary salary binding OR self-acknowledge
certificate for monthly salary as per Govt norms should be submitted by contractor as
and when required by the GMB office. They should be remain present whole months
and no any holydays should be given by GMB. If any electrician or helper will go on
leave then necessary alternate arrangements should be made by the contractor. Its
necessary insurance policy should be obtained from authorized insurance Co. and which
will have to submit to concern Electric sub division Porbandar if ask by GMB. They
should be given mobile facility by the contractor to keep daily communication with
Electric section Porbandar. They should be physically good enough to carry out hard
site work. Necessary daily transportation expenses will be bare by the contractor.
Item No:- 3.1 Replacing S.S. wire as specified
The job includes the safely bringing down position, removal of old existing wire rope,
Supply and installation of new wire rope , testing for up and down position and any
other work require for replacement of wire rope. Replacing S.S. wire ISI approved for
High Mast having size of 06 mm., construction of 7x19 main core. 6x19 construction
wire rope is available with either FC (fibre core) or WSC (wire strand core). When
supplied with a wsc the rope is more commonly referred to as 7x19. The wire rope will
replaced with all safety precautions and under concern site engineer.
Stainless steel wire ropes are of AISI 316 grade and 7/19 construction with central core
of AISI 316 grade diameter. Breaking load of each rope is not less than 2400 kgf for
mm diameter and 3900 kgf for 8 mm diameter, giving a factor of safety of system. The
end connections of ropes to the winch drum are fitted with copper talurit. The thimbles
are secured on ropes by compression splices. Two lengths of stainless steel wire ropes
are used in the system and no intermediate joints are offered in view of safety.
OPERATION OF WIRE ROPES:
1 Inspect, rope lay on winch and section of rope visible at mast door opening for
frays, kinks, or corrosion.
2 Inspect anchorage point of winch rope at compensation pulley (if fitted).
3 Inspect winch rope throughout length for frays, kinks or corrosion where
4 Inspect rope anchorage points on winch drum and lantern carriage. Check
Thimble and splicing for any crack.
5 From the base of the mast observe ropes from lantern carriage in lowered
position to mast head for any obvious defects.