Tender Value
₹4.1 Cr
EMD Value
₹3.6 L
Closing Date
27 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
SR DEN CEN
20 conditions · 6 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tenderer's shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
Maintenance period : 06 Months
Similar nature of work : Construction of building work
If the tenderer does not submit MOU on Rs 300/- Non judicial Stamp dully notarized & Electrical license, the offer will be considered as incomplete and will be summarily rejected ( Click here to download Format)
58 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Applicability of rules for this tender
Indian Railways Standard General Conditions of Contract updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents. (GCC April 2022)
Indian Railways Unified Standard Specification (IRUSS-2019) updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents, if applicable in the contract
CPWD Specifications 2019 Vol I & II updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents, if applicable in the contract
IR Specifications/Guidelines updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents
Relevant B.I.S. Codes updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents
In these Special Conditions of Contract the following terms shall have the meaning hereby assigned to them except where the context otherwise requires.
General Condition of Contract shall mean General Condition of Contract - April 2022 corrected up to date as contained in Western Railway, Engineering department, Indian Railways Unified Standard Schedule of Rates 2019 and Indian Railways Unified Standard Specification 2019 with up to date correction slip, And /OR CPWD Delhi schedule of rate 2019( DSR-Vol.-I and Vol.-2 ,DSR Horticulture and landscaping, specification ( Vol-I and Vol-II) & Horticulture& landscaping with up to date correction slip. Whichever is applicable.
Standard specification shall mean'' Indian railway United standard specification ( Works and materials) Vol.-I &II) And /OR Indian Railway Unified standard schedule of rates (IR USSOR- 2019) and specifications. with up to date correction slip And /OR CPWD Delhi schedule of rate 2019 (DSR-Vol.-I and Vol.-2, DSR- Horticulture and landscaping, specification (Vol-I and Vol-II) & Horticulture& landscaping with up to date correction slip. Whichever is applicable.
Standard schedule Items/rates shall mean the Items/Rates in the Indian Railways Unified Standard Schedule of Rates 2019 and Indian Railways Unified Standard Specification 2019 with up to date correction slip, And /OR CPWD Delhi schedule of rate 2019( DSR-Vol.-I and Vol.-2 ,DSR Horticulture and landscaping, specification ( Vol-I and Vol-II) & Horticulture& landscaping with up to date correction slip. Whichever is applicable
Where there is any conflict in conditions/Specifications contained in various parts, order of precedence will be as given below
Any foot note given by the Railway in the schedule of quantities and rates.
Description of item in the Schedule of Quantities and rates.
Special Specifications
Additional Special Conditions/of Contract.
Standard Specifications.
Special Conditions of Contract & General Conditions of Contract April 2022 corrected upto date
Stamp Duty is applicable as per Stamp Act with latest amendments as applicable in the State.
Rights of the Railway to deal with Tender: As per GCC April 2022, Para 7, 8 & 9 Tender Form (Second Sheet), PART I Instructions to Tenderers (ITT).
The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender, and tenderer(s) shall neither demand any explanation for the cause of rejection of his/ their tender nor the Railway to assign reasons for declining to consider or reject any particular tender or tenders.
If the tenderer(s) deliberately gives / give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
(iii)If any partner(s) of a partnership firm expires after the submission of its tender or after the acceptance of its tender, the Railway shall deem such tender as cancelled/contract as terminated under clause 61 of the Standard General Conditions of Contract, unless the firm retains its character as per partnership agreement. If a sole proprietor expires after the submission of tender or after the acceptance of tender, the Railway shall deem such tender as cancelled / contract as terminated under clause 61 of the Standard General Conditions of Contract.
Payment of Royalty Charges
All taxes, royalty charges, etc. of whatever nature in connection with the work including extraction and supply of rubble stone/stone ballast/sand/moorum earth or any other material used on the work shall have to be borne by the Contractor. The Contractor will be required to obtain a royalty clearance certificate from the concerned Revenue Authorities/Collector and produce the same to the Engineer after completion of the supply but before release of the final bill.
Royalties and Patent Rights: (a)The Contractor shall defray the cost of all royalties, fees and other payments in respect of patents, patent rights and licenses which may be payable to patentee, licensee or other person or corporation and shall obtain all necessary licenses. (b)The contractor shall indemnify, the Railway or any agent, servant or employee of the Railway against any action, claim or proceedings relating to infringement use of any patent or design any alleged patent or design rights and shall pay any royalties or other charges which may be payable in respect of any articles or materials or part thereof included in the contract. In the event of any claim being made or action being brought against the Railway or any agent, servant or employee of the Railway in respect of any such matters, as aforesaid, The contractor shall indemnify notified thereof. Provided that such indemnify shall not apply when such infringement has taken place in complying with the specific direction issued by the Railway but the contractor shall pay any royalties or other charges payable in respect of any such use.
Final bills of Ballast supply contracts are to be passed on submission of Royalty Clearance Certificate by the contractor from the concerned Revenue Authorities/ Collectors.
SPECIAL CONDITION FOR TAX DEDUCTION
In respect of works, a deduction of 2% from each of the Contractor's bills shall be made in terms of section 194(C) of the Income Tax Act of 1961 & 1991 and as per instructions issued from time to time (Surcharge will also be deducted along with I. Tax as per extent rules).
The Railway will deduct sales tax if leviable in a particular state where the work is going on, the gross amount of each bill while making payment to the contractor(s). The recovery shall be governed as per the guide lines & rates prescribed by the concerned State Government.
Any Other taxes The Contractor shall bear in full all taxes and royalties levied by the State Government and/or Central Government from time to time. This would be entirely a matter between the contractor and State Government/or Central Government. Railway will recover the taxes and royalties through final bills if the contractor fails to pay the taxes and royalties to the Government.
DETAILS OF INSPECTION REGISTER AND RECORDS ARE TO MAINTAINED BY TENDERER ARE AS FOLLOWS:
The Contractor/s shall maintain accurate records, plans and charts showing the dates and progress of all main operations and the Engineer shall have access to this information at all reasonable times. Records of tests made shall be handed over to the Engineer/s representative after carrying out the tests. The following registers will be maintained at site by the Contractor/s.
Site Order Register: The Contractor/s shall promptly acknowledge by putting his signature in the site order against any order given therein by the Engineer or his representative or his superior officers and comply with them. The Compliance shall be reported by the Contractor/s to the Engineer in good time so that it can be checked.
Labour Register: This register will be maintained to show daily strength of labour in different categories employed by the Contractor/s.
LOG book of events: All events are required to be chronologically logged in this book shift wise and date wise.
Cement & steel registers shall be maintained by the contractor.
DISASTER MANAGEMENT "All the available vehicles and equipment's of the contractor can be drafted by the Railway Administration in case of accidents/ natural calamities involving human lives. The payment for such drafting shall be made according to the rates as shall be fixed by the Engineer. However, if the contractor is not satisfied with the decision of the Engineer in this respect he may appeal to the Chief Engineer within 30 Days of getting the decision of the Engineer, supported by analysis of the rates claimed. The Chief Engineer's decision after hearing both the parties in the matter would be final and binding on the contractor and the Railway".
EMERGENCY WORK In the event of any accident or failure occurring in the execution of work/ arising out of it which in the opinion of the Engineer requires immediate attention, the Railway may bring its own workmen or other agency/agencies to execute or partly execute the necessary work or carry out repairs if the Engineer-in-charge considers that the contractor(s) is/are not in a position to do so in time without giving any notice and charge the cost thereof, to be determined by the Engineer- in-charge, to the contractor.
DAMAGE BY ACCIDENT/ FLOOD/ TIDES OR NATURAL CALAMITIES The Contractor shall take all precautions against damages from accidents, floods tides or other natural occurrences. He shall not be entitled to any compensation for his tools, plants, materials, machines and other equipment lost or damaged by any cause whatsoever. The Contractor shall be liable to make good the damage to any structure or part of a structure, plant or material of every description belonging to the Railway covered under the Contract, lost or damaged by him due to any cause during the course of execution of work. The Railway Administration will not be liable to pay the contractor any charge for rectification or repair to any damage which may have occurred from any cause what so ever.
INCLUSION OF LETTER OF CREDIT AS MODE OF PAYMENT For all the tenders having advertised cost of Rs 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit(LC)arrangement. (Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.2018)
CHANGE IN ADDRESS: Any change in the address of the contractor shall be forthwith intimated in writing to the Railway. The Railway will not be responsible for any loss/ inconvenience suffered by the Contractor on account of his failure to comply with this.
Provisions of Contract Labour (Regulation and Abolition) Act, 1970 (Shramik Kalyan) (As per Para 55-A.1 to 55-A.5, 55-B, 55-C (i) (a to e), 55-C (ii) & 55-D, Page- 88-89, Part-II of GCC-April 2022)
Dhasa - Pipavav in PRCL Section - Providing Duty Bunk in place of porta cabin in the Jurisdiction of SR.DEN (C) (27 LCs).
271-2025-26
271-2025-26
Open
Works - General
6 Months
Bhavnagar, Gujarat
₹0
₹3.6 L
27 Feb 2026
4 Feb 2026
61 items across 3 schedules · ₹5,84,78,095.8 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | All kinds of soil. | cum | 1200 | 260.3 | 3,12,360 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | cum | 2400 | 700.5 | 16,81,200 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | cum | 192 | 2,123.75 | 4,07,760 |
| 4 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 720 | 7,294.7 | 52,52,184 |
| 5 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 600 | 9,045.75 | 54,27,450 |
| 6 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 360 | 10,852.95 | 39,07,062 |
| 7 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | 946 | 392.15 | 3,70,973.9 |
| 8 | Suspended floors, roofs, landings, balconies and access platform | Sqm | 708 | 927.25 | 6,56,493 |
| 9 | Lintels, beams, plinth beams, girders, bressummers and cantilevers | Sqm | 1174 | 736.4 | 8,64,533.6 |
| 10 | Columns, Pillars, Piers, Abutments, Posts and Struts | Sqm | 1666 | 961.3 | 16,01,525.8 |
| 11 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 66000 | 107.85 | 71,18,100 |
| 12 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 25898 | 107.85 | 27,93,099.3 |
| 13 | Providing and laying Autoclaved Aerated Concrete (AAC) blocks masonry with 150 mm to 300 mm thick with Grade -1 AAC blocks of density 551 to 650 kg/cum conforming to IS: 2185 (Part 3) in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in- Charge. (The payment of RCC band and reinforcement shall be made for separately). | cum | 12 | 8,333.65 | 1,00,003.8 |
| 14 | 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws | Sqm | 77 | 3,473.85 | 2,67,486.45 |
| 15 | 300x16 mm | Each | 72 | 216.55 | 15,591.6 |
| 16 | 125 mm | Each | 72 | 39.95 | 2,876.4 |
| 17 | 30 mm thick plain PVC door shutters | Sqm | 48 | 3,182.95 | 1,52,781.6 |
| 18 | Providing and fixing PVC Door Frame of size 50x47 mm with a wall thickness of 5 mm ( +/- 0.2 mm), made out of single piece extruded PVC profile, with mitred cut joints and joint with 2 nos of PVC bracket of size 190 mm x 100 mm long arms of cross section size 35 x 15 mm & self driven self taping screws, the vertical door profiles to be reinforced with 40x20 mm M.S. rectangular tube of 0.8 mm , including providing EPDM rubber gasket weather seal throughout the frame, including jointing 5 mm PVC frame strip with PVC solvent cement on the back of the profile. The door frame to be fixed to the wall using 8 x100 mm long anchor fasteners complete, all as per manufacturer's specification and direction of Engineer -in- charge. | Metre | 127 | 573.45 | 72,828.15 |
| 19 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Kg | 4368 | 133.7 | 5,84,001.6 |
| 20 | Raj Nagar plain | Sqm | 240 | 2,346.8 | 5,63,232 |
| 21 | Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete. | Sqm | 240 | 1,112.7 | 2,67,048 |
| 22 | Size of Tile 500x500 mm | Sqm | 840 | 1,524.3 | 12,80,412 |
| 23 | 75 mm diameter | Metre | 288 | 248.8 | 71,654.4 |
| 24 | 110 mm diameter | Metre | 240 | 377.4 | 90,576 |
| 25 | 1:4 (1 cement: 4 fine sand) | Sqm | 5280 | 347.05 | 18,32,424 |
| 26 | 1:3 (1 cement : 3 fine sand) | Sqm | 451 | 300.45 | 1,35,502.95 |
| 27 | New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre | Sqm | 2880 | 185.65 | 5,34,672 |
| 28 | New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | Sqm | 2400 | 171.1 | 4,10,640 |
| 29 | Two or more coats on new work | Sqm | 480 | 155.9 | 74,832 |
| 30 | One or more coats on old work | Sqm | 2400 | 102.8 | 2,46,720 |
| 31 | White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests | Each | 27 | 6,767.4 | 1,82,719.8 |
| 32 | White Vitreous China Flat back wash basin size 450x 300 mm with single 15mm C.P. brass pillar tap | Each | 27 | 1,513.6 | 40,867.2 |
| 33 | Waste coupling 31 mm dia of 79 mm length and 62mm breadth weighing not less than 45 gms | Each | 27 | 115.3 | 3,113.1 |
| 34 | 25 mm dia nominal bore | Metre | 216 | 551.7 | 1,19,167.2 |
| 35 | 20 mm dia nominal bore | Metre | 120 | 635.2 | 76,224 |
| 36 | 25 mm nominal bore | Each | 27 | 622.4 | 16,804.8 |
| 37 | 25 mm nominal bore | Each | 27 | 439.25 | 11,859.75 |
| 38 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. | Per Litre | 24923 | 11 | 2,74,153 |
| 39 | 15 mm nominal bore, 86 mm long, weighing not less than 88 gms | Each | 27 | 125.6 | 3,391.2 |
| 40 | Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) | Kg | 480 | 495.05 | 2,37,624 |
| 41 | Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) | Kg | 600 | 598.6 | 3,59,160 |
| 42 | With float glass panes of 4.0 mm thickness (weight not less than 10kg/sqm) | Sqm | 144 | 1,176.8 | 1,69,459.2 |
| 43 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 720 | 7,387.25 | 53,18,820 |
| 44 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 1080 | 9,844.65 | 1,06,32,222 |
| Schedule total | ₹5,45,41,609.8 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SpecialConditionsforthework.pdf
SafetyatWorkSiteLatest18-07-2025.pdf
RBcircularforDiggingwork.pdf
PCECircular88forQualityofWorks.pdf
JointProcedurefordiggingwork.pdf
Annexure-IListof27LCsforPotaCabin.pdf
ElectricalTS-DutyBunk27LCs.pdf
GCCApril2022ACS1to10.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .