Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.9 LAccepted-AOC | L1 | Accepted-AOC Lowest rate quated bidder selected | |
| 2 | L2₹50.8 L+₹3.9 L (8.35%)Rejected-Finance | L2 | Rejected-Finance lowest rate quated bidder selected |
| Sl No | Description | Qty | Unit | VIJESH M L1 | ABDULMAJEED PV L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and stacking in standard profile and heap for measurement at site Quarry waste ,including all cost and conveyance and all labour charges including stacking etc complete | 415.44 | 1 M3 | 1,345 ₹5,58,766.8 Lowest | 1,345 ₹5,58,766.8 Lowest |
| 2.00 | Collection of STONE including all cost conveyance labour charges etc complete. | 110.68 | 1 M3 | 1,577 ₹1,74,542.36 Lowest | 3,307.83 ₹3,66,110.62 |
| 3.00 | Collection ofStone aggregate 40 mm nominal sizeincluding all cost conveyance labour charges etc complete. | 323.77 | 1 M3 | 2,217.6 ₹7,17,992.35 Lowest | 2,217.6 ₹7,17,992.35 Lowest |
| 4.00 | Supplying and stacking in standard profile and heap for measurement at site Stone aggragate 20 mm nominal size ,including all cost and conveyance and all labour charges including stacking etc complete | 142.9 | 1 M3 | 2,217.6 ₹3,16,895.04 Lowest | 2,217.6 ₹3,16,895.04 Lowest |
| 5.00 | Supplying and stacking in standard profile and heap for measurement at site Stone aggragate 10 mm nominal size ,including all cost and conveyance and all labour charges including stacking etc complete | 70.49 | 1 M3 | 2,217.6 ₹1,56,318.62 Lowest | 2,217.6 ₹1,56,318.62 Lowest |
| 6.00 | Supplying and stacking for measurement at site Portland Cement (ISI standard) , including all cost and conveyance and all labour charges including stacking etc complete | 205.82 | 1 MT | 8,800 ₹18,11,216 Lowest | 9,982.26 ₹20,54,548.75 |
| 7.00 | Supplying and stacking in standard profile and heap for measurement at site Coarse Sand - zone III (M sand for concrete work) ,including all cost and conveyance and all labour charges including stacking etc complete | 276.38 | 1 M3 | 2,448.6 ₹6,76,744.07 Lowest | 2,448.6 ₹6,76,744.07 Lowest |
| 8.00 | Collection of 100mm channel shoulder 2.5m long
cost conveyance labour charges etc complete. | 0.53 | each | 1,884.46 ₹998.76 Lowest | 1,884.46 ₹998.76 Lowest |
| 9.00 | Collection of wall form panel 1250x500mm
cost conveyance labour charges etc complete. | 1 | each | 1,706 ₹1,706 Lowest | 1,706.28 ₹1,706.28 |
| 10.00 | Higher charges of concrete mixer 0.25 to 0.40 cum hopper | 47.7 | 1day | 4,058 ₹1,93,566.6 Lowest | 4,058 ₹1,93,566.6 Lowest |
Tender Value
₹53.3 L
EMD Value
₹50,000
Closing Date
15 Oct 2025, 3:00 pmClosed
Secretary balussery grama panchayath
Secretary balussery grama panchayath
Material supply of mgnrega works
2025_DP_799984_2
SEC/BLSY/MGNREGS/12/2025-26
Open Tender
Civil Works - Others
Item Rate
Balussery grama panchayath
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹50,000
Yes
21 Dec 2025
7 Oct 2025
16 Oct 2025
7 Oct 2025
15 Oct 2025
7 Oct 2025
Amount
Supplying and stacking in standard profile and heap for measurement at site Quarry waste ,including all cost and conveyance and all labour charges including stacking etc complete
Collection of STONE including all cost conveyance labour charges etc complete.
Collection ofStone aggregate 40 mm nominal sizeincluding all cost conveyance labour charges etc complete.
Supplying and stacking in standard profile and heap for measurement at site Stone aggragate 20 mm nominal size ,including all cost and conveyance and all labour charges including stacking etc complete
Supplying and stacking in standard profile and heap for measurement at site Stone aggragate 10 mm nominal size ,including all cost and conveyance and all labour charges including stacking etc complete
Supplying and stacking for measurement at site Portland Cement (ISI standard) , including all cost and conveyance and all labour charges including stacking etc complete
Supplying and stacking in standard profile and heap for measurement at site Coarse Sand - zone III (M sand for concrete work) ,including all cost and conveyance and all labour charges including stacking etc complete
Collection of 100mm channel shoulder 2.5m long cost conveyance labour charges etc complete.
Collection of wall form panel 1250x500mm cost conveyance labour charges etc complete.
Higher charges of concrete mixer 0.25 to 0.40 cum hopper
Higher charges of Vibrator (needle type 40 mm )
ABDULMAJEED PV (BID ID -2391249)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .