| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAdmitted-Finance | ₹14.3 L | L1 | Admitted-Finance |
| 2 | L2₹19.9 LAdmitted-Finance | ₹19.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M.K. ENTERPRISES L2 | Shree Navdurga Electrical L1 |
|---|---|---|---|---|---|
| 1.00 | Regular operation and Maintenance of High mast light in Ranpur , Kota including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i At any moment a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO/association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. iii Contractor will have to employ trained and qualified electricians for the work. iv Corporation shall not be responsible for any kind of accident during execution of work. v Contractor will be responsible for safety and security of fixtures and all concerned materials. vi Contractor will be responsible for arrangement of all T&P required for the work vii Cost of all labour and material like lamp / balllast wire etc. will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance of fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. viii No extra payment will be made for fixing/removal of extra/existing fixture in the industrial area. ix Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. Payment of electricity bill will be made by RIICO. x Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintain the On/Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. xi Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. xii Contractor will maintain cubical panel board and assessories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. xiii Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100/- per fixture per day will be imposed on the contractor. | 216 | PER HIGH MAST PER MONTH | 3,500 ₹7,56,000 | 2,500 ₹5,40,000 Lowest |
| 2.00 | Regular operation and Maintenance of Street Light Fixtures HPSV/ HPMV (70W/150W) in Ranpur, Kota including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i At any moment a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO/association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. iii Contractor will have to employ trained and qualified electricians for the work. iv Corporation shall not be responsible for any kind of accident during execution of work. v Contractor will be responsible for safety and security of fixtures and all concerned materials. vi Contractor will be responsible for arrangement of all T&P required for the work vii Cost of all labour and material like tube, rod, starter, ballast, HPSV lamp / balllast wire will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance HPSV fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. viii No extra payment will be made for fixing/removal of extra/existing fixture in the industrial area. ix. If any cable or fixtures are completely damaged due to any other reason and are not serviceable, RIICO shall re-installed them at their own level after verification. x. Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. Payment of electricity bill will be made by RIICO. xi Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintain the On/Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. xii Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. xiii Contractor will maintain cubical panel board and accessories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. xiv Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100/- per fixture per day will be imposed on the contractor. | 264 | per point per month | 90 ₹23,760 | 74.6 ₹19,694.4 Lowest |
| 3.00 | Maintenance of LED light Fixture (45 to 90 Watt) in Ranpur , Kota including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i At any moment a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO/association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. iii Contractor will have to employ trained and qualified electricians for the work. iv Corporation shall not be responsible for any kind of accident during execution of work. v Contractor will be responsible for safety and security of fixtures and all concerned materials. vi Contractor will be responsible for arrangement of all T&P required for the work vii Cost of all labour and material like tube, rod, starter, ballast, HPSV lamp / balllast wire will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance HPSV fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. viii No extra payment will be made for fixing/removal of extra/existing fixture in the industrial area. ix. If any cable or fixtures are completely damaged due to any other reason and are not serviceable, RIICO shall re-installed them at their own level after verification. x. Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. Payment of electricity bill will be made by RIICO. xi Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintain the On/Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. xii Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. xiii Contractor will maintain cubical panel board and accessories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. xiv Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100/- per fixture per day will be imposed on the contractor. | 13,440 | per point per month | 90 ₹12,09,600 | 65 ₹8,73,600 Lowest |
Tender Value
₹17.0 L
EMD Value
₹34,070
Closing Date
7 Jul 2026, 6:00 pmClosed
Unit Head RIICO Kota
RIICO Office, Road NO. 5, IPIA near Gobaria Babri Kota
As per BoQ
2026_RIICO_571416_1
22/2026-27(2)/1641-1647
Open Tender
Electrical and Maintenance Works
Item Rate
730 days
Ranpur industrial area Kota
As per TD
3 documents required · 3 mandatory
₹1,180
RIICO head office payment gateway
₹34,070
14 Jul 2026
26 Jun 2026
8 Jul 2026
26 Jun 2026
7 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Regular operation and Maintenance of High mast light in Ranpur , Kota including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i At any moment a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO/association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. iii Contractor will have to employ trained and qualified electricians for the work. iv Corporation shall not be responsible for any kind of accident during execution of work. v Contractor will be responsible for safety and security of fixtures and all concerned materials. vi Contractor will be responsible for arrangement of all T&P required for the work vii Cost of all labour and material like lamp / balllast wire etc. will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance of fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. viii No extra payment will be made for fixing/removal of extra/existing fixture in the industrial area. ix Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. Payment of electricity bill will be made by RIICO. x Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintain the On/Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. xi Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. xii Contractor will maintain cubical panel board and assessories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. xiii Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100/- per fixture per day will be imposed on the contractor. | - | PER HIGH MAST PER MONTH | 2,500 | - |
| 2 | Regular operation and Maintenance of Street Light Fixtures HPSV/ HPMV (70W/150W) in Ranpur, Kota including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i At any moment a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO/association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. iii Contractor will have to employ trained and qualified electricians for the work. iv Corporation shall not be responsible for any kind of accident during execution of work. v Contractor will be responsible for safety and security of fixtures and all concerned materials. vi Contractor will be responsible for arrangement of all T&P required for the work vii Cost of all labour and material like tube, rod, starter, ballast, HPSV lamp / balllast wire will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance HPSV fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. viii No extra payment will be made for fixing/removal of extra/existing fixture in the industrial area. ix. If any cable or fixtures are completely damaged due to any other reason and are not serviceable, RIICO shall re-installed them at their own level after verification. x. Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. Payment of electricity bill will be made by RIICO. xi Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintain the On/Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. xii Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. xiii Contractor will maintain cubical panel board and accessories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. xiv Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100/- per fixture per day will be imposed on the contractor. | - | per point per month | 80 | - |
| 3 | Maintenance of LED light Fixture (45 to 90 Watt) in Ranpur , Kota including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i At any moment a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO/association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. iii Contractor will have to employ trained and qualified electricians for the work. iv Corporation shall not be responsible for any kind of accident during execution of work. v Contractor will be responsible for safety and security of fixtures and all concerned materials. vi Contractor will be responsible for arrangement of all T&P required for the work vii Cost of all labour and material like tube, rod, starter, ballast, HPSV lamp / balllast wire will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance HPSV fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. viii No extra payment will be made for fixing/removal of extra/existing fixture in the industrial area. ix. If any cable or fixtures are completely damaged due to any other reason and are not serviceable, RIICO shall re-installed them at their own level after verification. x. Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. Payment of electricity bill will be made by RIICO. xi Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintain the On/Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. xii Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. xiii Contractor will maintain cubical panel board and accessories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. xiv Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100/- per fixture per day will be imposed on the contractor. | - | per point per month | 85 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_1016762.xls
BOQ • 0.40 MB
TDLIGHTSNEW.pdf
Tender Documents • 2.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].