Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.4 L+₹37,822.68 (2.36%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹19 L
EMD Value
₹38,000
Closing Date
30 Jan 2023, 11:00 amClosed
E.E. M.G.C.C.D-5, Bijnor
M.G.C.C.D-5, Bijnor
Construction of V.R.B. at km.8.335 and Canal From Km. 8.300 to km. 8.400 of Kundarki Dy. Under Madhya Ganga Canal Stage-II. (LOT-4)
2023_UPIDC_764774_22
05/EE/2022-23
Open Tender
Civil Works - Bridges
Item Wise
90 days
kundarki
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹38,000
17 Feb 2023
24 Jan 2023
30 Jan 2023
24 Jan 2023
30 Jan 2023
24 Jan 2023
Amount
Earth work in embankment in ordinary soil in 20cm layer including ramming , dressing the surface to the requried level and slopes also i/c avg carriage 600 m up to work site with all lead & lift , T&P , etc. as per direction of Engineer-in -Chief. per Cum
Earth work in excavation or digging for making Rajwaha including lead upto 30 m and lift upto 1.50 m i/c cost of labour, T&P, ramming , dressing , etc. complete as per direction of Engineer-in-Chief per Cum.
Earth work in excavation foundation in ordinary soil (lomy,clay or sand) including lift 1.50 M & lead upto 30 M and including filling watering and ramming of excavation earth into the trench.
Cement concrete in footing (M10)1:3:6 including all cost of material,labour,T&P etc .
Reinforcment Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Cement concrete with stone ballast in R.C.C. 1:1:2 (M-25) including all cost of material, labour , T&P etc. for completion of work per cum.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work.
Centering & Shuttering of line ply wood or steel shuttering for R.C.C. Work including all cost of material, labour and T&P etc. for proper completion of work per Sqm.
Centering & Shuttering C.C. Work including all cost of material, labour and T&P etc. for proper completion of work .
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Cement Pointing 1:2 (struck deep ) on brick masonry.
Supply and laying Tarfelt sheet in two layers on Bed Block including all cost of material, labour and T&P etc. complete.
S/F of 100 mm dia 0.60M length G.I. pipe as drainage spout including cost of all material , labour and T&P etc. for proper completion of work.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete.
Supplying and laying of brick on edge, filling joint including all cost of material, labour and T&P etc. all complete.
Supplying and laying of R.B.M. i/c cost of all material ,labour ,T&P etc required for proper completion of work
Earth work for making diversion in ordinary soil in 20cm layer including ramming , dressing the surface to the requried level and slope also i/c avg carriage 1.00Km up to work site with all lead & lift , T&P, etc. as per direction of Engineer-in -Chief. per Cum
Earth work in cutting or in embankment in ordinary soil for Removal of diversion including 1.50 m lift and up to 100 m lead Including cost of all materials, labour, T&P etc. required for proper completion of work.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete. Per RM.
Supply and Fixing sign board size 1.50 x1.00M, Including cost of all materials, labour, T&P etc. required for proper completion of work/ No.
KHURSID AHMAD
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .