Expenditure
Capital (Works)
SOUTH
20 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less, where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure -VI B, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Format of Annexure VI B is attached with document tab for reference.
Date of inviting tender shall be the date of publishing tender notice on IREPS website if tender is published on website or the date of publication in newspaper in case tender is not published on website.
The balance sheet and all other financial documents attested/certified by CAs to substantiate fulfillment of financial eligibility criteria should be with UDIN (Unique Document Identification Number), failing which the 1.1.1 offer is likely to be rejected without any further reference. (Authority: Chief Engineer/Works/SER/GRC's letter no. CE/G/Arb&Cont. Mgt./Tender Circular/Pt.I/317, dated 11.03.2025)
(a)The tenderer must have successfully completed orsubstantially completed any one of the following categories of work(s)during last 07 years,ending last day of month previous to the one in which tender is invited:iThree similar works each costing not less than the amount equal to 30% of advertised value of the tender,oriiTwo similar works each costing not less than the amount equal to 40% of advertised value of the tender,oriiiOne similar work costing not less than the amount equal to 60% of advertised value of the tender.b(1)In case of tenders for composite works(e.g.works involving more than one distinct component,suchasCivil Engineering works,S&T works,Electrical works,OHE works etc.and in the case of major bridges- substructure,superstructure etc),tenderer must have successfully completed or substantially completed any one of the following categories of work(s)during last07(seven)years,ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender,or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender,or(iii)One similar work each costing not less than the amount equal to60% of advertised value of each component of tender.Note for b(1):Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components.(b)(2) In such cases,what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.(b)(3)To evaluate the technical eligibility of tenderer,onlycomponents of work as stipulated in tender documents for evaluation of technical eligibility,shall be considered.The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause7of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause7of the Standard General Conditions of Contract or jointly i.e,partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However,if required in tender documents by way of Special Conditions, a formal agreement duly notarised,legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s),and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility.Such subcontractor must fulfill technical eligibility criteria as follows:The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years,ending last day of month previous to the one in which tender is invited through a works contract.Note:for subletting of work costing up to Rs 50lakh,no previous work experience of subcontractor shall be asked for by the Railway.In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor,the same shall be done with subcontractor(s)fulfilling the requirements as per clause7oftheIRSGCC,with prior approval of Chief Engineer in writing.
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Explanation for Eligibility Criteria- 1. Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2. In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials. 3. If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials 4. In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work. 5. If a 1.1.1 bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or public listed company as defined in Note for Item 10.1 Para 10 of the Tender Form (Second Sheet) of GCC APRIL 2022, the same shall be considered for the purpose of fulfillment of credentials. 6. In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility. 7. In case of newly formed partnership firm, the credentials of individual partners from previous propriety firm(s) or dissolved previous partnership firm(s) or split previous partnership firm(s), shall be considered only to the extent of their share in previous entity on the date of dissolution / split and their share in newly formed partnership firm. For example, a partner A had 30% share in previous entity and his share in present partnership firm is 20%. In the present tender under consideration, the credentials of partner A will be considered to the extent of 0.3*0.2*value of the work done in the previous entity. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc.
8. In case of existing partnership firm, if any one or more partners quit the partnership firm, the credentials of remaining partnership firm shall be re-worked out i.e., the quitting partner(s) shall take away his credentials to the extent of his share on the date of quitting the partnership firm(e.g. in a partnership firm of partners A, B & C having share 30%, 30% & 40% respectively and credentials of Rs 10 crore; in case partner C quits the firm, the credentials of this partnership firm shall remain as Rs 6 crore). For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc.9. In case of existing partnership firm if any new partner(s) joins the firm without any modification in the name and PAN/TAN no. of the firm, the credentials of partnership firm shall get enhanced to the extent of credentials of newly added partner(s) on the same principles as mentioned in item 6 above. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deeds, dissolution/splitting deeds and proof of surrender of PAN No.(s) in case of dissolution of partnership firm etc. 10. Any partner in a partnership firm cannot use or claim his credentials in any other firm without leaving the 1.1.2 partnership firm i.e., In a partnership firm of A&B partners, A or B partner cannot use credentials of partnership firm of A&B partners in any other partnership firm or propriety firm without leaving partnership firm of A&B partners. 11. In case a partner in a partnership firm is replaced due to succession as per succession law, the proportion of credentials of the previous partner will be passed on to the successor.12. If the percentage share among partners of a partnership firm is changed, but the partners remain the same, the credentials of the firm before such modification in the share will continue to be considered for the firm as it is without any change in their value. Further, in case a partner of partnership firm retires without taking away any credentials from the firm, the credentials of partnership firm shall remain the same as it is without any change in their value. 13. In a partnership firm "AB" of A&B partners, in case A also works as propriety firm "P" or partner in some other partnership firm "AX", credentials of A in propriety firm "P" or in other partnership firm "AX" earned after the date of becoming a partner of the firm AB shall not be added in partnership firm AB.14. In case a tenderer is LLP, the credentials of tenderer shall be worked out on above lines similar to a partnership firm. 15. In case company A is merged with company B, then company B would get the credentials of company A also.
Date of inviting tender shall be the date of publishing tender notice on IREPS website if tender is published on website or the date of publication in newspaper in case tender is not published on website.
Defination of Similar Work :- Execution of P. Way works on running line.
70 conditions · 6 needing a document upload
If a tender is accepted on the quoted rates of bidder which is below the advertised tender value, an additional performance security shall be submitted by the bidder as below: (i) If Bid quoted in % of advertised cost is below 0 - 5% (Inclusive), then an additional performance guarantee (in %) will be Nil. (ii) If Bid quoted in % of advertised cost is below 5%, then an additional performance guarantee (in %) will be 5%. (Authoirity : Advance Correction Slip No. 11 to IRSGCC April-2022)
Following is the checklist for submission of documents while submitting the tender. :-
(I) A certificate as per annexure - V(A) enclosed in document tab. (II) Fulfillment of Standard Technical and Financial Criteria as per tender documents wherever applicable as per Tender Documents.
For Sole Proprietorship Firm: All documents in terms of Para 10 2.1.1 of the Tender Form (Second Sheet) of IR Standard GCC April 2022.
For Partnership Firm
The tenderer shall clearly specify that the tender is submitted on behalf of a partnership firm.The following documents shall be submitted by the partnership firm, with the tender:(i) A notarized copy of the Partnership Deed or a copy of the Partnership deed registered with the Registrar.(ii) A notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm.(iii) An undertaking by all partners of the partnership firm that they are not blacklisted ordebarred by Railways or any 2.2.1 other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP in which they were / are partners/members. Any Concealment / wrong information in regard to above shall make the bid ineligible or the contract shall be determined under Clause 62 of the Standard General Conditions of Contract. (iv) All other documents in terms of Para 10 of the Tender Form (Second Sheet) of IR Standard GCC April 2022
For Company registered under Companies Act-2013
Following documents shall be submitted by the tenderer:Company registered under Companies Act2013: (i) The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii) A copy of Certificate of Incorporation (iii) A copy of Authorization/Power of Attorney 2.3.1 issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (iv) All other documents in terms Para 10 of the Tender Form (Second Sheet) of IR Standard GCC April 2022.
Joint Venture (JV): The tenderer shall submit documents as mentioned in Clause 17 of IR Standard GCC April 2022 (Wherever Applicable)
Following documents shall be submitted by the tendererRegistered Society & Registered Trust: (i) A copy of Certificate of Registration (ii) A copy of Memorandum of Association of Society/Trust Deed (iii) A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust. (iv) A copy of Rules & Regulations of the Society (v) All other documents in terms of Para 10 of the Tender Form (Second Sheet) of IR Standard GCC April 2022.
Following documents shall be submitted by the tenderer: LLP (Limited Liability Partnership): (i) A copy of LLP Agreement (ii) A copy of Certificate of Incorporation (iii) A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iv) An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from 2.5.1 participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (v) All other documents in terms of Para 10 of the Tender Form (Second Sheet)of IR Standard GCC April 2022.
Following documents shall be submitted by the tenderer: HUF: (i) A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the 2.5.2 position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (ii) All other documents in terms of Para 10 of the Tender Form (Second Sheet) of IR Standard GCC April 2022.
Declaration regarding Retd Railway Employee as per Para 16 (a), (b) & (c) of IR Standard GCC April 2022.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society /Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall 2.6.1 enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be.
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure VIA and shall be valid for a period of 90days beyond the bid validity period.NOTE- Bank Guarantee for Bid Security shall be Acting Through DRM/ENGG/CKP and Beneficiary shall be FA & CAO/S.E.Rly/Garden Reach/ Kolkata.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The Contractor will fill up and update the details of Contracts, Contractual Labour employed by him/her and related details as required by Railway on "Contract Labour Management Portal" or any other portal or in Register - as Directed by Engineer-in- Charge for which no extra payments shall be made.
Letter of Credit as Mode of Payment in Works Tender or Service Tender has been introduced as per Rly Board's letter no. 2018/CE-I/CT/9, New Delhi, dtd: 04.06.2018 (Documents are attached in uploaded section named as Conditions for LC Credit)). Tenderers are advised to see the uploaded section carefully for availing LC Credit at the time of bidding in IREPS Portal.
Retd. employ :- declaration regarding employment/ partnership etc. of retired railway employees. as per Clause 16 of IRSGCC APRIL 2022. Format is attached in document tab.
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure VI A and shall be valid for a period of 90 days beyond the bid validity period. The tenderer are advised to upload the Bid Security in case of BG as per Annex VI A for BID SECURITY uploaded in document Tab. Also, the original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids .( i. e excluding the last date of submission of bids ).Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal(IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. NOTE- Bank Guarantee for Bid Security shall be Acting Through DRM/ENGG/CKP and Beneficiary shall be FA & CAO/S.E.Rly/Garden Reach/Kolkata.
Mandate form should be uploaded as per attached format in document tab.
(I) Through Sleeper Renewal (Primary){TSR(P)} by PQRS machine/Manually including deep screening work by BCM/Manually, construction/repair of drain & other miscellaneous P-Way related works for 22.650 Tkm in Padapahar -Nayagarh & 7.586 Tkm in Barajamda Jn. - Bolanikhadan Section. (II) Through Sleeper Renewal (Primary){TSR(P)} by PQRS machine including deep screening work by BCM & other miscellaneous P-Way related works for 2.850 Tkm in Rajkharsawan Jn. - Padapahar (DN) Section. (III) Through Sleeper Renewal (Primary){TSR(P)} by PQRS machine including deep screening work by BCM & other miscellaneous P- Way related works for 3.964 Tkm in Noamundi Yard - Padapahar & 12.901 Tkm in Deojhar - Jaroli section, under the jurisdiction of Sr. DEN(South)/CKP. (2nd Call)
CKP-SOUTH-26-27-19
CKP-SOUTH-26-27-19
Open
Works - General
12 Months
West Singhbhum, Jharkhand
₹0
₹13.5 L
30 Jul 2026
30 Jul 2026
10 Aug 2026
80 items across 3 schedules · ₹6,43,81,411.81 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Using Soil Class SQ3 | cum | 21000.00 | 278.97 | 58,58,370 |
| 2 | In all conditions and classifications of soil except rock | cum | 3500.00 | 106.59 | 3,73,065 |
| 3 | Providing and fixing Weep Holes in Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in- Charge. | Metre | 750.00 | 246.59 | 1,84,942.5 |
| 4 | For PSC wider base sleepers - For location of work involving deep screening. (deep screening to be paid separately) | Each | 26062.00 | 199.48 | 51,98,847.76 |
| 5 | Locations other than Ballasted Deck Bridge | Each | 1019.00 | 473.84 | 4,82,842.96 |
| 6 | Ballasted Deck Bridge | Each | 29.00 | 559.63 | 16,229.27 |
| 7 | Depth of 300 mm below bottom of sleeper - For Plain Track : | TRM | 16331.00 | 582.05 | 95,05,458.55 |
| 8 | 25mm gap 'in-situ' welding during traffic block using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in- Charge after release from track. | Each | 375.00 | 1,599.21 | 5,99,703.75 |
| 9 | For 60 Kg Rail, Single shot crucible fitted with Automatic Tapping Thimble, 3 pieces Mould (Zircon washed) and Compressed Air Petrol/LPG pre heating technique | Each | 227.00 | 1,088.69 | 2,47,132.63 |
| 10 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 16331.00 | 137.85 | 22,51,228.35 |
| 11 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 16331.00 | 106.04 | 17,31,739.24 |
| 12 | Without Rail tensor | TRM | 49951.00 | 34.46 | 17,21,311.46 |
| 13 | Drilling holes of 16mm to 22mm dia. on all types of PSC sleepers and fixing the dowels with adhesive of RDSO approved quality for fixing check rails & guard rails, as directed by Engineer in-charge. | Each | 728.00 | 242.04 | 1,76,205.12 |
| 14 | PQRS: Pre Block activity: Removing of the existing ballast from crib portion of the full length of existing PSC sleeper and further up to the bottom of sleepers to accommodate new sleeper and dumping the ballast so removed on the shoulders/cess with contractor own labour, tools and plants etc, complete with all lead and lift and as directed by the Engineer-in-charge at site including crossing of track wherever necessary. | TRM | 34251.00 | 32.32 | 11,06,992.32 |
| 15 | PQRS: During line block activity: Dismantling existing track, levelling disturbed and uneven surface of bed up to bottom of sleeper, Loading the released panels in to BFR with Railway's portal cranes, Placing new panels from BFRs on to track with Railway's portal crane, Linking of Track with all fittings, placing ballast as required in crib and shoulders, aligning and surfacing of track, attending track parameters and initial packing to track to allow traffic at restricted speed of 20 kmph with contractor's labour, tools etc, complete and lead & lift as directed by the Engineer-in-charge at site including crossing of track wherever necessary. Note: The PQRS cranes with fuel and operators will be provided by Railway. | TRM | 34251.00 | 41.04 | 14,05,661.04 |
| 16 | PQRS: Post Block activity, Pulling back the left over ballast from shoulders/cess in to track and dumping in cribs and shoulders, regulating and boxing with available ballast to facilitate surfacing of track during lifting with contractors own labour, tools etc, complete and lead & lift as directed by the Engineer-in-charge at site including crossing of track wherever necessary. | TRM | 34251.00 | 21.72 | 7,43,931.72 |
| 17 | Laying of auxiliary track with all types of rails, already available on cess, fixing rails on wooden blocks / CST-9 pots at 2m interval, true to square, to required alignment & level, fixing with spikes / screws / keys, linking rails with fish plates, bolts & nuts to a gauge of 3400mm (with reference to centre line of existing BG track), levelling both the rails to same plane as that of BG track over stone ballast by way of removing ballast from shoulders of existing track, providing one round of packing. Subsequently, dismantling auxiliary track after completion of PQRS work at site by way of removing wooden blocks / CST-9 pots and carrying same to next stretch / location, if required, where auxiliary track has to be laid and spreading the same at required locations and leaving rails there itself for carrying out TRR work later. | TRM | 34251.00 | 44.15 | 15,12,181.65 |
| 18 | For rails above 40m length | TRM | 34251.00 | 109.02 | 37,34,044.02 |
| 19 | Through Rail renewal with free service rails of all types by removing existing running rails, already cut into free rails / rail panels for making auxiliary track, including attending alignment, cross level, gauging, packing; wherever required including crossing of track, as directed. | TRM | 34251.00 | 115.89 | 39,69,348.39 |
| 20 | Carrying out preparatory works for operation of Ballast Cleaning Machine (BCM) which includes making trench in track for inserting cutter bar, supporting track on wooden block supplied by Railway, removal of ballast along with muck from shoulder which is out of reach of cutter chain and putting the same in cutting width or between rails. Rate includes all miscellaneous works, e.g. opening and re- fixing of joggled fish plates, OHE Bonds, dismantling & removing obstructions etc. | TRM | 33751.00 | 16.24 | 5,48,116.24 |
| 21 | Carrying out various works during operation of BCM, like filling up of ballast at deficient location from locations where ballast is excess or from adjoining tracks, required initial packing, adjustment of PSC Sleepers, provision wooden blocks supplied by department and attending track parameters etc. complete so as to make track fit for 20 kmph speed. | TRM | 33751.00 | 39.25 | 13,24,726.75 |
| 22 | Removal of screened muck discharged by BCM, where muck disposal on side slope is restricted due to platform, cutting, OHE mast etc. and disposing it beyond 5m from edge of cutting up to 3m deep or alternatively carting it up to 50m for disposing off beyond the end of cutting / platform and making up cess wherever low. | TRM | 33751.00 | 29.8 | 10,05,779.8 |
| 23 | Removing the ballast from shoulders, left over after BCM working, screening the same removing the muck and putting back the screened ballast into track, boxing the ballast to profile and using released muck for cess making or throwing away within 50m lead and 3m lift when not required for cess repairs and as directed by the Engineer-in-charge. Note: This item shall be used only when BRM is not available. | TRM | 33751.00 | 20.64 | 6,96,620.64 |
| 24 | Ballast equalisation & ballast profiling after completion of deep screening work by BCM and/or after unloading of ballast by DMT (Ballast Train), as directed by Site Engineer as per IRPWM including heaping of ballast in tamping zone keeping rails & sleeper top free from ballast, spacing and squaring of sleeper, gauging, cleaning of muck, proper fixing of fastening, attention during each round of sleeper tamping in relation to pre & post working Note: Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile and cess profile. | TRM | 2850.00 | 37.02 | 1,05,507 |
| 25 | Making cess in deep screened track by using screened muck discharged by BCM where cess is low or cutting cess to required depth up to 4m from centre of track, where cess is high and disposing off extra muck beyond 5m from edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms, so as to make cess as per standard profile including providing proper slope. | TRM | 21631.00 | 33.1 | 7,15,986.1 |
| 26 | Carrying out Through packing of sleepers to make track fit for 30 KM speed as per procedure stipulated in latest version of IRPWM, behind BCM including filling ballast when only lifting is carried out by BCM. | TRM | 6750.00 | 85.14 | 5,74,695 |
| 27 | For day time block working | TRM | 17126.00 | 19.07 | 3,26,592.82 |
| 28 | For night time block working | TRM | 17126.00 | 21.36 | 3,65,811.36 |
| 29 | BCM/FRM/UNIMAT (7.5 KVA generator and 12x500 W) | Night | 38.00 | 3,924.04 | 1,49,113.52 |
| 30 | CSM / DUO / 3X with or without DGS (7.5 KVA generator and 8x500 W) | Night | 38.00 | 3,715.32 | 1,41,182.16 |
| 31 | 60 Kg - 110/90 UTS - Outside Track | Each | 1493.00 | 162.22 | 2,42,194.46 |
| 32 | 60 Kg - 110/90 UTS - On Running Line | Each | 1843.00 | 210.39 | 3,87,748.77 |
| 33 | Outside Track | Each | 3285.00 | 53.88 | 1,76,995.8 |
| 34 | On Running Line | Each | 3285.00 | 70.49 | 2,31,559.65 |
| 35 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 200.00 | 119.83 | 23,966 |
| 36 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 590.00 | 118.89 | 70,145.1 |
| 37 | From Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer. | MT | 200.00 | 88.97 | 17,794 |
| 38 | For lead up to 500 metres | MT | 730.00 | 300 | 2,19,000 |
| 39 | Lead beyond 30 Km and up to 50 km | MT | 27.00 | 439.46 | 11,865.42 |
| 40 | Lead beyond 50 Km and up to 100 Km | MT | 54.00 | 656.22 | 35,435.88 |
| 41 | Lead beyond 100 Km and up to 150 Km | MT | 662.00 | 980.11 | 6,48,832.82 |
| 42 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 198600.00 | 3.3 | 6,55,380 |
| 43 | Lead up to 5 Km | MT | 20.00 | 53.41 | 1,068.2 |
| 44 | Lead beyond 5 Km and up to 10 km | MT | 20.00 | 96.02 | 1,920.4 |
| 45 | Lead beyond 10 Km and up to 20 km | MT | 40.00 | 154.24 | 6,169.6 |
| 46 | Lead beyond 20 Km and up to 30 km | MT | 40.00 | 225.42 | 9,016.8 |
| 47 | Lead beyond 30 Km and up to 50 km | MT | 90.00 | 324.62 | 29,215.8 |
| 48 | Lead beyond 50 Km and up to 100 Km | MT | 180.00 | 541.38 | 97,448.4 |
| 49 | Lead beyond 100 Km and up to 150 Km | MT | 400.00 | 865.27 | 3,46,108 |
| 50 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 60000.00 | 3.3 | 1,98,000 |
| 51 | From Truck / Trailer | MT | 590.00 | 119.99 | 70,794.1 |
| 52 | Fabrication including cutting, bending/machining and fixing of check rails of all rail sections over PSC Sleepers as per Railway's approved drawings & specifications for level crossings / trolley paths/inspection lines in yards duly cutting rail flanges, wherever required to correct alignment and level, drilling of holes with machine in check rails and fixing to Running rail and sleepers with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets, packing pieces, bolts, washers etc including grinding of brackets if required, fixing of Railway's wooden blocks at flare ends duly cutting and plaining, crossing of tracks and as directed by the engineer in-charge Note: 1. Drilling of holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2. Required P.Way materials will be supplied at SSE/P.Way stores. | TRM | 80.00 | 1,099.35 | 87,948 |
| 53 | Caution Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 43.00 | 6,298.57 | 2,70,838.51 |
| 54 | Speed Indicator Board of equilateral triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 43.00 | 5,420.97 | 2,33,101.71 |
| 55 | Stop Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 20.00 | 6,298.57 | 1,25,971.4 |
| 56 | Termination Indicator Board of Circular shape having diameter of 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long | Each | 43.00 | 7,699.44 | 3,31,075.92 |
| 57 | Manufacturing, supplying and fixing Curve Indicator / Point Indicator / SEJ Boards to be provided at various locations on formation, made out of MS sheet 2mm thick of size 450mm x 300mm duly fixed with MS frame of 25mm x 25mm x 3mm angle welded to 50mm x 50mm x 3mm MS angle, 1000mm long post split and bent 100mm at bottom end with all lead & lift as per specification and including painting of details with enamel paint, as directed by Engineer in-charge (Earthwork & concreting will be paid separately) | Each | 40.00 | 1,061.27 | 42,450.8 |
| 58 | Providing and erecting water proof Gypsy Tent of size 3m x 3m for a specific period of time and removal of the same after completion of work or as directed by Engineer in-charge. | Day | 730.00 | 529.15 | 3,86,279.5 |
| Schedule total | ₹5,17,31,692.16 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-April-2022-ACS11.pdf
ATTACHMENT
NEWANNEUREVA.pdf
ATTACHMENT
Location_2.pdf
ATTACHMENT
SPECIALCONDITIONSFORPQRSWORK.pdf
ATTACHMENT
Acceptance of e Bank Guarantee
ATTACHMENT
TrackWorkSpecialCondition.pdf
ATTACHMENT
NEWSPECIALCONDITIONSOFCONTRACT.pdf Spl condition of All contract
ATTACHMENT
ANNEXUREVIAforBIDSECURITY.pdf
ATTACHMENT
ANNEXUREVIBforFINANCIALCRITERIA.pdf
ATTACHMENT
ConditionsforLCCredit.pdf
ATTACHMENT
VendorMandateForm.pdf
ATTACHMENT
Tele_Cir_9-2023-New.pdf
ATTACHMENT
GCC-2022-uptoACS-10.pdf
ATTACHMENT
DECLARATIONOFRETDRLYEMPLOYEE.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].