Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹1.9 L+₹2,427.97 (1.32%)Rejected-AOC | L2 | Rejected-AOC accepted |
| Sl No | Description | Qty | Unit | RAHUL C M L1 | RAGESH C M L2 |
|---|---|---|---|---|---|
| 1.00SIDE WALL | |||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 27 | cum | 65.05 ₹1,756.35 Lowest | 84 ₹2,268 |
| 1.00 | OD523455/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. | 45.23 | cum | 3,779 ₹1,70,905.28 Lowest | 3,780 ₹1,70,950.5 |
| 1.00 | 3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 17.82 | cum | 595 ₹10,602.9 Lowest | 700 ₹12,474 |
Tender Value
₹1.9 L
EMD Value
₹4,633
Closing Date
10 Sept 2026, 11:00 amClosed
ASSISTANT ENGINEER ,MOODADI GP
ASSISTANT ENGINEER ,MOODADI GP
ROAD
2026_LSGD_867308_26
AE/MDY/TENDER/01/P/2026-27
Open Tender
Civil Works - Roads
Item Rate
MOODADI
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹4,633
Yes
26 Sept 2026
3 Sept 2026
12 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
3 Sept 2026 - 8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SIDE WALL | |||||
| 1.001 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | - | cum | - | - |
| 1.002 | OD523455/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. | - | cum | - | - |
| 1.003 | 3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1468806.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.26 MB
Tendernotice_4.pdf
PDF • 0.24 MB
Tendernotice_5.pdf
PDF • 0.24 MB
Tendernotice_6.pdf
PDF • 0.24 MB
Tendernotice_7.pdf
PDF • 0.97 MB
BOQ_1468806.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .