| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.5 LAccepted-AOC | ₹44.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹49.4 L+₹4.9 L (11.1%)Rejected-AOC | ₹49.4 L+₹4.9 L (11.1%) | L2 | Rejected-AOC L2 |
| 3 | L3₹53.0 L+₹8.5 L (19.0%)Rejected-AOC SOUPARNIKA P O VELLUR | KERALA | ₹53.0 L+₹8.5 L (19.0%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | LIJILKUMAR POLA L1 | Radhakrishnan P K V L3 | abdul gafoor m L2 |
|---|---|---|---|---|---|---|
| 1.00Road work | ||||||
| 1.00 | 2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means | 0.1 | Hectare | 39,134.61 ₹3,913.46 Lowest | 46,588.82 ₹4,658.88 | 43,459.46 ₹4,345.95 |
| 1.00 | OD4512/2024-2025:Engaging HYdraulic Excavator of 1 cum bucket including driver and fuel | 8 | hour | 1,162.03 ₹9,296.24 Lowest | 1,383.36 ₹11,066.88 | 1,290.44 ₹10,323.52 |
| 1.00 | 2.3.A.1:Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. A. Lead upto 100 m (i) Girth above 300 mm to 600 mm | 8 | each | 602.28 ₹4,818.24 Lowest | 716.99 ₹5,735.92 | 668.83 ₹5,350.64 |
| 1.00 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 2,097.5 | cum | 550.07 ₹11,53,771.83 Lowest | 654.85 ₹13,73,547.88 | 610.86 ₹12,81,278.85 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 4.91 | cum | 7,480.57 ₹36,714.64 Lowest | 8,905.44 ₹43,707.9 | 8,307.26 ₹40,772.03 |
| 1.01 | 12.5.4:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> IV. R.C.C. grade M 25 | 17.98 | cum | 9,134.52 ₹1,64,238.67 Lowest | 10,874.43 ₹1,95,522.25 | 10,144 ₹1,82,389.12 |
| 1.01 | 13.1.2:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5<br>R.C.C M 25 | 5.88 | cum | 9,929.06 ₹58,382.87 Lowest | 11,820.3 ₹69,503.36 | 11,026.34 ₹64,834.88 |
| 1.01 | 9.7:Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets | 21 | metre | 2,387.7 ₹50,141.7 Lowest | 2,842.5 ₹59,692.5 | 2,651.57 ₹55,682.97 |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 1.79 | tonne | 83,467.42 ₹1,49,406.68 Lowest | 99,365.98 ₹1,77,865.1 | 92,691.59 ₹1,65,917.95 |
Tender Value
₹50.0 L
EMD Value
₹50,000
Closing Date
30 Jul 2026, 6:00 pmClosed
The Executive Engineer
The Executive Engineer Harbour Engg. Division Kannur Moplabay
GSB, DR Work, Box culvert,Pipe Culvert
2026_HED_859580_1
HED/CEHED/TR/821/2024_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
540 days
Cherukunnu
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
19 Sept 2026
7 Jul 2026
1 Aug 2026
7 Jul 2026
30 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road work | |||||
| 1.001 | 2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means | 1 | Hectare | - | - |
| 1.002 | OD4512/2024-2025:Engaging HYdraulic Excavator of 1 cum bucket including driver and fuel | - | hour | - | - |
| 1.003 | 2.3.A.1:Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. A. Lead upto 100 m (i) Girth above 300 mm to 600 mm | - | each | - | - |
| 1.004 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | - | cum | - | - |
| 1.005 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | - | cum | - | - |
| 1.006 | 12.5.4:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> IV. R.C.C. grade M 25 | - | cum | - | - |
| 1.007 | 13.1.2:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5<br>R.C.C M 25 | 1 | cum | - | - |
| 1.008 | 9.7:Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets | - | metre | - | - |
| 1.009 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | - | tonne | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd.pdf
Tender Documents • 21.25 MB
BOQ_1453453.xls
BOQ • 0.24 MB
ep.pdf
Tender Documents • 0.11 MB
c.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .