Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹88.3 LAdmitted-Finance | -12.51% | ₹88.3 L | L1 | Admitted-Finance |
| 2 | L2₹90.0 LAdmitted-Finance | -10.87% | ₹90.0 L | L2 | Admitted-Finance |
| 3 | L3₹90.1 LAdmitted-Finance | -10.76% | ₹90.1 L | L3 | Admitted-Finance |
| 4 | L4₹99.9 LAdmitted-Finance | -1.00% | ₹99.9 L | L4 | Admitted-Finance |
Tender Value
₹1 Cr
EMD Value
₹2 L
Closing Date
24 Jan 2026, 5:00 pmClosed
Commissioner Nagar Nigam Jodhpur
Nagar Nigam Jodhpur
Construction of Boundary Wall around Keru Waste Management Site in NNJ
2026_DLB_524749_1
NIT 3505 DATE 02.01.2026
Open Tender
Civil Works
Jodhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Commissioner Nagar Nigam Jodhpur and MDRISL
₹2 L
Yes
2 Feb 2026
2 Jan 2026
26 Jan 2026
3 Jan 2026
24 Jan 2026
3 Jan 2026
Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In ordinary rock
Carriage of Materials by mechanical transport including loading, unloading and stacking ::Stone, boulders, gravelly material
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in Dry Masonry.
Coursed rubble masonry (first sort) with hard stone in foundation and plinth with :Cement mortar 1:6 (1 cement : 6 coarse sand)
Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Cold twisted bars
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Columns, Pillars, Piers, Abutments, Posts and Struts.
Columns, Pillars, Piers, Abutments, Posts and Struts.
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) :Flush/ Ruled pointing
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar :40mm thick
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
BOQ_936372.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid