| 1 | L1₹56.4 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹57.7 L+₹1.3 L (2.30%)Rejected-Finance | L2 | Rejected-Finance Highest Rate Quoted by bidder | |
| 3 | L3₹58.8 L+₹2.3 L (4.15%)Rejected-Finance 00 KANDHARPUR NEAR JUNIOR HIGH SCHOOL KANDHARPUR BAREILLY UTTAR PRADESH 243004 UDYAM UP 15 0021222 | BAREILLY | UTTAR PRADESH | 243004 | L3 | Rejected-Finance Highest Rate Quoted by bidder | |
| 4 | L4₹61.6 L+₹5.1 L (9.08%)Rejected-Finance 317 GALI NO 2 GANGA NAGAR RISHIKESH | RISHIKESH | UTTARAKHAND | L4 | Rejected-Finance Highest Rate Quoted by bidder | |
| 5 | L5₹63.9 L+₹7.5 L (13.3%)Rejected-Finance GRAM KANGRI POST SHYAMUR DISTRICT HARIDWAR UTTARAKHAND | L5 | Rejected-Finance Highest Rate Quoted by bidder |
Tender Value
₹59 L
Closing Date
9 Jun 2021, 3:00 pmClosed
Project Manager
Office of PROJECT MANAGER CONSTRUCTION UNIT UTTARAKHAND PEYJAL NIGAM RISHIKESH
CONSTRUCTION OF BOUNDARY WALL OF KABRISTAN AT VILLAGE SULTANPUR ADAMPUR, BLOCK LAKSAR, DISTT. HARIDWAR
2021_MDPEY_33135_1
517/Nivida/28 Dated 28/05/2021
Open Tender
Civil Works
Item Rate
90 days
SULTANPUR ADAMPUR, BLOCK LAKSAR, DISTT. HARIDWAR
Please refer tender document
3 documents required · 3 mandatory
₹4,720
PM,Const.Unit, UKPJN, Rishikesh
Exempted
3 Aug 2023
31 May 2021
10 Jun 2021
31 May 2021
9 Jun 2021
31 May 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Columns, Pillars, Piers, Abutments, Posts and Struts.
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement: 6 fine sand)
Finishing walls with Premium Acrylic Smooth exterior paint withSilicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
M/s Rakesh Kumar Contractor
Shri Balaji Enterprises
OM Associates
RIJWAN ALI
indian trading company
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .