Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC NANGAL CHOWK ROPAR PUNJAB 140001 | ROPAR | ROPAR | PUNJAB | 140001 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹1.6 L+₹13,594 (9.04%)Rejected-AOC | L2 | Rejected-AOC Being Highest |
Tender Value
Refer Docs
EMD Value
₹3,200
Closing Date
22 Dec 2023, 10:00 amClosed
Gaurav
Divisional Engineer Twell Const Division PWRMDC Ltd,Ropar SYL Shed No 02,Near Nehru Stadium Ropar
E-tenders are invited for the Repair and Rewinding of Submersible Motor pump of T/well Under 36 No Twell scheme of Sh. Anandpur Sahib block of Dist Ropar
2023_WR_113416_1
74/2023/TCD/ROPAR
Open Tender
Repair and Maintenance Services
Item Rate
7 days
Shri Anandpur Sahib Block of Distt Ropar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹3,200
Yes
12 Jan 2024
4 Dec 2023
22 Dec 2023
4 Dec 2023
22 Dec 2023
4 Dec 2023
Amount
Rewinding of Sub Motor pump set of 27.5 HP including supply of ISI Marked rewinding wire GM motor bush , rotor sleeve, CI Bowl , wooden sticks,neckring , Rotor grinding polishing & balancing inc. cost of other misc. items labour after deduction of scrap value .Twell= Brahampur
Carriage charges for bringing sub pump set b/w twell site to sub division store & repaired sub motor pump set to twell site inc.labour charges for loading & unloading of material (to & Fro)(18 km approx. one side). Twell= Brahampur
Rate for each side of carriage charges for bringing MS Pipes b/w twell site to sub division store inc. labour charges for loading & unloading of material(to & Fro)( 18 km approx. one side). Twell= Brahampur
Labour for Extraction of pump set for 4 inch pipe with Electrical chain pulley (upto 140ft).Twell= Brahampur
Labour for Lowering of pump set for 4 inch pipe with Electrical chain pulley (upto 140 ft). Twell= Brahampur
MS Mut Bolt 5/8''*3 fully threaded
PVC Rubber jain 4'' dia 4 holes
Rewinding of Sub Motor pump set of 20 HP including supply of ISI Marked rewinding wire GM motor bush , rotor sleeve, CI Bowl , wooden sticks,neckring , Rotor grinding polishing & balancing inc. cost of other misc. items labour after deduction of scrap value .Twell= Behlu
Carriage charges for bringing sub pump set b/w twell site to sub division store & repaired sub motor pump set to twell site inc.labour charges for loading & unloading of material (to & Fro)( 15 km approx. one side). Twell= Behlu
Rate for each side of carriage charges for bringing MS Pipes b/w twell site to sub division store inc. labour charges for loading & unloading of material(to & Fro)( 15 km approx. one side). Twell= Behlu
Labour for Extraction of pump set for 4 inch pipe with Electrical chain pulley (upto 80ft).Twell= Behlu
Labour for Lowering of pump set for 4 inch pipe with Electrical chain pulley (upto 80ft).Twell= Behlu
MS Mut Bolt 5/8''*3 fully threaded
PVC Rubber jain 4'' dia 4 holes
Rewinding of Sub Motor pump set of 25 HP including supply of ISI Marked rewinding wire GM motor bush , rotor sleeve, CI Bowl , wooden sticks,neckring , Rotor grinding polishing & balancing inc. cost of other misc. items labour after deduction of scrap value .Twell= Jindwari 2
Carriage charges for bringing sub pump set b/w twell site to sub division store & repaired sub motor pump set to twell site inc.labour charges for loading & unloading of material (to & Fro)( 17 km approx. one side). Twell= Jindwari 2
Rate for each side of carriage charges for bringing MS Pipes b/w twell site to sub division store inc. labour charges for loading & unloading of material(to & Fro)( 17 km approx. one side). Twell= Jindwari 2
Labour for Extraction of pump set for 4 inch pipe with Electrical chain pulley (upto 100ft).Twell= Jindwari 2
Labour for Lowering of pump set for 4 inch pipe with Electrical chain pulley (upto 100 ft).Twell= Jindwari 2
MS Mut Bolt 5/8''*3 fully threaded
PVC Rubber jain 4'' dia 4 holes
Manjindra Traders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .