Superintending Engineer, UGVCL, Circle Office, Mehsana
Supplying & Installtion of automation for existing SLIDING GATE & Other Civil Work At UGVCL Mehsana Campus , MEHSANA
271607
MSNCO/12/2026
Open
Civil Works
Mehsana
1 document required · 1 mandatory
₹590
Yes
UGVCL
₹7,500
Yes
31 Jan 2026
31 Jan 2026
31 Jan 2026
12 Feb 2026
31 Jan 2026
3 Excavation for foundation upto 1.5 m depth including sorting out and 25.00 210.42 CMT
stacking of useful materials and disposing off the excavated stuff upto
Meter lead.(A)Loose or soft soil (Manually Labour)
4 Filling available excavated earth (excluding rock) in trenches. plinth, sides of 25.00 135.56 CMT
foundations etc. in layers not exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
5 Providing and laying cement concrete 1:4:8 (1-Cement:4-coarse sand:8- 23.00 2733.19 CMT
machine crushed stone aggregates 40 mm nominal size) and curing
complete excluding cost of formwork in (A) Foundation and Plinth
6 Providing and laying ordinary cement concrete M200 and finishing smooth 2.50 6861.08 CMT
with,curing etc. complete including the cost of formwork but excluding the
cost of reinforcement for R.C.C work in (A) BEAMS :(iii) Having cross-
sectional area more than 0.12Sq.M and upto 0.18 Sq.M : (Note: Cement
consumption rate diff. added Rs.348.14 M150 to M 200)
7 Providing & Laying C.C. (1:1.5:3) / M20 or for plain or R.C.C. work for Road 8.00 4654.88 CMT
pavement, using 12mm. To 20mm. Size black trap machine crushed metal
including necessary centering for all sides as required , mixing the concrete
in mixer machine, ramming with Vibrator, including keeping the joints
between road panels & finishing the Honeycombed surface if any,
immediate finishing of Top layer of road with Trowel & spunch to create
anti skid hard surface with curing etc.. complete as per drawing &
specification, & as directed by E.I.C. with supply of cement by the
contractor.Note: Cement consumption rate diff. added Rs.435.37 for
ordinary concrete to M-200. ( REINFORCEMENT IF ANY WILL BE PAID
8 Compaction and finishing of cement concrete road by trimix process 70.00 51.87 SMT
providing extra labour charges for the trimix vacum dewatering service
process on cement concrete road surface by using vacum dewatering pump
floater surface vibrator including making groves and rough finish to surface
as per in including levelling the complete.
9 Providing TMT Bar FE 500D reinforcement for R.C.C. work including 350.00 76.52 KG
bending, binding and placing in position complete upto floor two level
10 Brick work using common burnt clay building bricks having crushing 9.00 3390.61 SMT
strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement
Mortar 1:6 (1- Cement : 6 -fine sand)(B) Conventional
11 Providing and laying cement concrete flooring 1:2:4 (1-cement : 2-coarse 18.00 348.52 SMT
sand : 4-graded stone aggregate 20mm nominal size) laid in one layer and
finished with a floating coat of neat cement. (B) 50mm thick
12 Providing 20 mm thick double coat mala cement plaster on interior brick / 55.00 281.51 SMT
concrete work for plastering comprising of base coat of 12 mm thick
cement plaster in cement mortar (1 Cement : 4 coarse sand) in rough
finishing and 8 mm thick top coat of cement mortar 1:2 (1 Cement :
Coarse sand) finished with trovel including scaffolding curing etc.
complete.Up To Floor Two Level
13 Providing laying (to level or slopes) and jointing reinforced concrete Light 20.00 671.19 RMT
duty non-pressure pipes I.S. class NP2 of the following internal diameter
with collars and butt ends prepared for collar joints including testing of
joints complete.(D) 300mm
14 Steel work, welded in built up sections framed work including cutting, 13.00 9018.30 Quintle
hoisting, fixing in position and applying a priming coat of red lead paint.
(A)In beams and joists, channels angles Tees, flats, with connecting plates
or angle cleats as in main and cross beams. Hip and jack rafters, purlins
conneted to common rafters and
15 Painting two coats (including priming coat) on new steel and other metal 75.00 127.76 SMT
surfaces with enamel paint, brushing interior to give an even shade
including cleaning the surface of all dirt, dust and othr foreign matter.
16 P/F Uninterupted Power Supply 2200 VA-APC 1.00 38300.00 No
17 Intalation Programming , Testing & Commissioning Sliding Gate With motor 1.00 404640.00 No
weight capacity up to 1500kgs. , Controlled board with radio receiver card
with LCD display , with safety fuse & stable relays for bull 15mtr. , with
flashing light RF trnasmeter , safety sensor , support roller XL , Tie rod for
gate fixing kit & Fixing plate , Roller Guide XL , Gate Limit Stop , existing
gate fabrication work (GATE AUTOMATION WITH AUTOMATION - BENINCA)
18 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete 60.00 692.91 SMT
block 60mm thick with grade of concrete M300 pnumatic compressed /
vibrated mechanically and as per approved design Confirming to IS 15658 :
2006 including 35 mm Sand layer for levelling and filling the joint with sand
in proper line and level as
per guidlines of IRC : SP 63-2018 etc. Complete.
A Estimated Cost Rs.
B Bidder’s Offer (+ / -) in % ------------- [B]
C Grand Total C = A +/- (A*B)]
C Grand Total C = A +/- (A*B)]
D Add 1% Welfare cess on C 1.00%
Goods & Service Tax E = (C+D )x GST% i.e. 18% as applicable on the date of
Grand Total including welfare & GST ----- F = C + D+E -------------------------------
Grand Total including welfare & GST ----- F = C + D+E -------------------------------
Final Offer (in Rs.)
Final Offer (Rs. In Words)
We have read and clearly understood the terms, conditions, Schedule ‘B’ and Technical specifications put up by UGVCL on WEB site. I/We hereby
accept all the conditions and specifications of this tender document, and accordingly, I/We am/are willing to carry out the work at quated rate as
SIGNATURE OF CONTRACTOR Superintending Engineer
(With rubber stamp/seal of the company) Circle Office, Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
03.Technical Bid.pdf
03. Sch - B.pdf
Download all tender documents and submit your bid