Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical GRAM RUDRAPUR NAGWA KHAS DISTRICT DEORIA | Admitted-Fee/PreQual/Technical |
Tender Value
₹25.0 L
EMD Value
₹2.5 L
Closing Date
24 Jun 2026, 4:00 pmClosed
EXCUTIVE OFFICER
NPP MUBARAKPUR
Alinagar Ward No 11 Construction of an RCC slabcovered drain extending from Habibur Rahmans premises to Shamsuddins premises
2026_DOLBU_1156688_2
277/NNPMUBARAKPUR/2026-27 DT-02-06-2026
Open Tender
Civil Works
Percentage
120 days
MUBARAKPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,945
EO
₹2.5 L
25 Jun 2026
3 Jun 2026
25 Jun 2026
3 Jun 2026
24 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Store Room | |||||
| 1.01 | Diversion of water during the work etc. all comp. | - | JOB | 30,000 | - |
| 1.02 | E/W foundation in liquid mud mixed soil etc as per S.I. No. 252 | - | m3 | 135 | - |
| 1.03 | E/W Ecutting cartage & filling out side 5.00 km with loading & 1s km kacha road etc all cost complete | - | m3 | 237.85 | - |
| 1.04 | S/L Grandular Sub-Base with Coarse Graded Material (Table-400.2) etc all cost complete | - | m3 | 3,286.5 | - |
| 1.05 | M-150 B/work in 1:4 cement & f/sand mortar etc all cost complete as per S.I.No-305b | 1 | m3 | 4,620 | ₹4,615.38 |
| 1.06 | P/I c.c. in 1:2:4 cemebt, c/sand & 20 mm gauge dalla grit including all cost complete as per S.I. No.-279(b) | - | m3 | 6,700 | - |
| 1.07 | Plaster Work in 1:4 cement & f/sand mortar etc all cost complete as per S.I. NO. 584 | - | m3 | 145 | - |
| 1.08 | R.C.C. Patiya in 1:2:4 cement, c/sand & 20 mm gauge dalla grit etc all cost complete as per S.I.No.-284(a)-(RCC Grade M20 Using Concrete Mixer) | - | m3 | 8,200 | - |
| 1.09 | S/f reinforcement in R.C.C. working including All comp. | - | qtl | 5,400 | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_2167420.xls
BOQ • 0.28 MB
02.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .