| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 104 FIRST FLOOR LSC NATIONAL ARCADE GHAZIPUR MAIN ROAD GHAZIPUR MAIN ROAD GHAZIPUR EAST DELHI DELHI 110096 | EAST DELHI | DELHI | 110096 | Rejected-Technical Disqualified |
| 4 | Rejected-Technical | Rejected-Technical Disqualified |
Tender Value
Refer Docs
Closing Date
24 May 2021, 3:00 pmClosed
Deputy Vice President (HCD)
HLL Lifecare Limited, HLL Bhavan, No26/4, Tambaram-Velachery Main Road, Pallikaranai, Chennai 600 100, Tamilnadu, India Ph 044 -2981 3732/34
Tender for establishment of Oxygen Generation Plant at Govt. Hospital Someshwar in Uttarakhand on TurnkeyBasis
2021_HLL_77627_1
HLL/CMO/HCD/UK-OGP/SMR/2021-22
Open Tender
Pipes and Pipe related activities
Item Rate
15 days
Govt. Hospital Someshwa
Please refer Tender documents.
14 documents required · 14 mandatory
₹7,500
Yes
Payable To
Exempted
17 Jun 2021
18 May 2021
25 May 2021
18 May 2021
24 May 2021
18 May 2021
Amount
Supply, Installation, Testing & Commisioing of Oxygen Generation Plant (300 LPM)
Supply, Installation, Testing & Commisioing of Oxygen Generation Plant (300 LPM)
Optional Item
Servo Voltage Stabilizer - 1 KVA
UPS - 1 KVA
Description of Work / Item(s)
Amount
Oxygen Manifold Cylinder Oxygen Manifold would be suitable to withstand a pressure of 140 Kg/Cm2and above along with high pressure copper annealed tail pipes with end Brass adapter suitable for Oxygen Cylinders and manifold. Top frame comprising of high pressure copper pipes of size 12mm I.D x 1.5mm wall thick, with high pressure brass fittings made of high tensile brass and connections through non-return values; high pressure copper tail pipes, made of high pressure copper pipe of size 7mm I.D x 1.5mm wall thick. The design of middle and bottom frames would be provided to fit both round and flat bottom cylinders safely. The manifold would be tested (hydraulically) at 3500 pig
4+4 Oxygen Manifold , High Pressure Tail Pipe with NRV
1 +1 Cylinder oxygen Emergency
Supply, Installation, Testing & Commisioing of Oxygen Generation Plant (300 LPM)
Fully Automatic Oxygen Control Panel The fully automatic control panel would be the following features: • Would be enclosed in a metal cabinet with a hinged cover. The side covers of the panel would be made of fiber glass. • Panel cover would be fitted with a lock to prevent unauthorized access can be swung open for maintenance. • Would be Fully Automatic Changeover operation and no manual action • The service gas would pneumatically operate gas change over system. • Delivery of gas through control panel would not be dependent on electricity. • Would be capable of delivering very high flow rate not less than 1300 litres per minute at delivery pressure. • Would have Visual indication of the • state of the manifold by 3 gauges within the control panel, which would be clearly visible through the transparent cover. • Would have Audio – visual alarm indication for changeover of empty cylinder bank to filled cylinder bank. • Built in transformer to ensure safe operation by low voltage. Microprocessor based alarm signal control with high ‘db’ Siren system.
Copper Piping & Fitting : All copper pipes would be Solid drawn, seamless, deoxidized, non-arsenical, half hard, tempered and degreased materials conforming to BS:EN :13348:2001 + A1:2005 Pipes sizes would be used as under: Copper Fittings: Fittings would be made of copper and suitable for a stem of working pressure of 17 bar and would confirm to BS 864 with specially made for brazed socket type connections.
15mmX0.9mm
22mmX0.9mm
12mm X 0.7mm
GAS OUTLET POINTS with Probe Would have terminated properly Double locking Front Loaded which have a parking facility which also avoids interchanging of outlets and keys including all accessories .(Fully Metal Outlet))
Oxygen
BPC Oxygen Flow meter with Humidifier Bottle: • Flow meter would be Backpressure Compensated. • Flow meter would be accurate gas flow measurement and control within a range of 0-15 litres per minute. • It would meet strict precision and durability standards. • Flow meter body would be made of brass material. • Flow tube and shroud components would be made of clear, impact resistant polycarbonate. • The humidifier bottle would be unbreakable polycarbonate material and autoclavable at 134 degrees centigrade. The humidifier would have built in safety valve.
ISOLATION VALVES: LEAK CLASS Would be 900 turn, ball valves of brass body, duly chrome plated on the outer periphery, SS ball with high quality Teflon seated, connected to pipeline with brass ferrule for easy maintenance. ID of the copper pipe and the ball valve would have same dimensions to avoid the flow frictio
Hand shutoff valve
Area Alarm Area Gas alarm panel Six Lines, Would audio- visual alarms for each gas used on the floor and come fitted with test and mute button. Running on electricity 220V, these units are suggested to be fitted on each floor as well as areas of heavy usage. It would be fitted with a pressure gauge. It indicates low, medium & high pressure sensors. (Digital)
Area Alarm for one Line
Zonal Valve Box: An Zonal area valve box would have bellow spec. Wall mounted M.S box with powder coated & lockable . Front glass mounting easily visible & using imported brass body quarter turn ball valves Using for opening & closing position The valve box door cannot be close during valve closing position.
Zonal valve box for ONE Gas Services
Description of Work / Item(s)
Amount
Supply, Installation, Testing & Commisioing of Oxygen Generation Plant (300 LPM)
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th year
8th year
9th year
10th year
PARAM MEDICAL SYSTEM
PARAM MEDICAL SYSTEM
PARAM MEDICAL SYSTEM
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .