Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.5 L+₹34,558.22 (5.62%)Admitted-Fee/PreQual/Technical/Finance | ₹6.5 L+₹34,558.22 (5.62%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SABU C L1 | Arunima Creation L2 |
|---|---|---|---|---|---|
| 1.00Oldage Home Construction | |||||
| 1.00 | OD481568/2025-2026:Engaging Coolie | 5 | each | 982.61 ₹4,913.05 Lowest | 1,037.81 ₹5,189.05 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 7.8 | cum | 326.62 ₹2,547.64 Lowest | 344.97 ₹2,690.77 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.62 | cum | 7,203.06 ₹40,517.21 Lowest | 7,607.64 ₹42,792.98 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.54 | cum | 8,386.26 ₹12,889.68 Lowest | 8,857.3 ₹13,613.67 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 58.88 | sqm | 350.63 ₹20,645.09 Lowest | 370.33 ₹21,805.03 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 160.16 | kilogram | 102.09 ₹16,350.73 Lowest | 107.82 ₹17,268.45 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.29 | cum | 9,047.24 ₹20,700.09 Lowest | 9,555.41 ₹21,862.78 |
| 1.01 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 10.1 | cum | 404.7 ₹4,089.09 Lowest | 427.44 ₹4,318.85 |
| 1.01 | OD466611/2025-2026: Providing and laying 60mm thick factory made cement concrete interlocking paver block of M
30 grade made by block making machine with strong vibratory compaction, of approved size,
design and shape, laid in required colour and pattern over and including 50mm thick compacted
bed of 6mm stone aggregate, filling the joints width fine sand ect... | 49.13 | sqm | 1,043.92 ₹51,283.61 Lowest | 1,102.56 ₹54,164.36 |
Tender Value
₹6.8 L
EMD Value
₹16,938
Closing Date
5 Sept 2026, 6:00 pmClosed
Assistant Engineer
O/O A.E, L.I.D and E.W Section, Kaduthuruthy G.P
Annual Plan-Project no - 223-2026 - KDTY Day house for Old ages in W-6 of Kaduthuruthy G.P-General Civil Work
2026_LSGD_866649_1
ET1/AE/LID and EW/KDTY/2026-27/223
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kottayam
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,495
₹16,938
8 Sept 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
5 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Oldage Home Construction | |||||
| 1.001 | OD481568/2025-2026:Engaging Coolie | - | each | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.007 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.008 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 1 | cum | - | - |
| 1.009 | OD466611/2025-2026: Providing and laying 60mm thick factory made cement concrete interlocking paver block of M
30 grade made by block making machine with strong vibratory compaction, of approved size,
design and shape, laid in required colour and pattern over and including 50mm thick compacted
bed of 6mm stone aggregate, filling the joints width fine sand ect... | 1 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
223.pdf
Tender Documents • 2.77 MB
BOQ_1466868.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .