Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
20 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
Vadodara Division: Replacement of old assets - Air Conditioners, Water Coolers and Refrigerators at various locations over BRC division.
BRC-EL-P-2460-25-26-R
BRC-EL-P-2460-25-26-R
Open
Works - General
6 Months
Vadodara, Gujarat
₹0
₹1.7 L
20 Feb 2026
22 Jan 2026
6 Feb 2026
19 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 82,68,536 | ||
| — | 222.00 | — | — | ||
| Dismantling of existing Split Air Conditioners of various capacities at various locations - The price shall cover for dismantling of Split Air Conditioners of various capacities installed at various locations of Vadodara division. The scope of work involves complete pumping down of the refrigerant into the compressor without any leakage, disconnection of copper piping between indoor and outdoor unit, disconnection of power cable, removal of indoor unit with base plate and removal of outdoor unit with stand. The complete job should be done in a safe and secure manner without causing damage to any equipment. The released Split Air Conditioners shall be transported to site engineer's store. | — | — | — | 2,53,968 | |
| — | 5700.00 | — | — | ||
| Supply and fixing of copper piping for suction and discharge lines of Air Conditioner unit - The price shall cover for supply, fixing, testing and commissioning of refrigerant copper piping suitable for R-22, R-134 A, R-407 refrigerant and conforming to IS: 10773/2006 (latest) from indoor unit to outdoor unit. The copper piping shall be insulated with polyurethane foam tubing duly covered with weather protection. The copper refrigerant pipe shall be suitable for bearing 350 PSI pressure and the thickness should be 19 SWG and diameter should be suitable for handling of refrigerant for capacity 3.5 TR of refrigerant quantity without creating any extra pressure due to quantity of refrigerant and as per manufacturer's recommendations. The exposed copper piping shall be suitably concealed as per site requirement. | — | — | — | 18,69,600 | |
| — | 2005.00 | — | — | ||
| Providing rigid PVC drain piping - The price shall cover for supply and fixing of rigid uPVC pipe medium grade of required diameter from indoor unit to main drain hole for draining of condensed water from cooling coil (Indoor unit) to main drain discharge point. | — | — | — | 84,210 | |
| — | 222.00 | — | — | ||
| Installation, testing and commissioning of Split Air Conditioner - The price shall cover for installation, fixing, testing and commissioning of the split AC as per the site-engineer's instructions/ requirements with all associated wiring, copper piping, existing drain piping, existing MS outdoor stand. This shall also cover for making a hole of suitable diameter in the existing brick masonry/RCC wall for laying of cables, pipes etc from indoor to outdoor unit in a neat and aesthetic manner. The hole shall be sealed with plaster of Paris to prevent entry of insects, rain water, lizards etc. Manufacturer's recommendations/ instructions shall be strictly followed. Split AC shall be supplied by railways from the site engineer's office/ stores. | — | — | — | 3,18,792 | |
| — | 8.00 | — | — | ||
| Supply, installation, testing and commissioning of Cassette type Split Air Conditioning unit of 4.0 TR capacity, five-star rating and removal of existing unit - The price shall cover for supply of Cassette type Split Air Conditioning unit of 4.0 TR capacity with a cooling capacity of 36,000 BTU/hour (approximately). The unit shall be provided with phase reversal/failure protection relay, auto control Fuzzy logic control, ON/OFF Timer, auto fan control, dry mode, wireless remote control and integrated drain pipe complete with indoor and outdoor unit. The Cassette type Split Air Conditioning unit shall be of BLUE STAR/ CARRIER/HITACHI/DAIKIN/VOLTAS/'O' GENERAL make. The price shall also cover for installation, testing and commissioning of Cassette type Split Air Conditioning unit complete as per Site In-charge's guidelines, site requirement and the recommendations of the manufacturer. The scope of work also involves safe and secure removal of existing Cassette type AC along with all the accessories and handing over to SSEE (RAC) PRTN at his store. | — | — | — | 8,64,000 | |
| — | 1.00 | — | — | ||
| Supply, installation, testing and commissioning of five star rated, cabinet type Air Conditioner unit of 2.0 TR capacity - The price shall cover for supply, installation, testing and commissioning of five star rated, cabinet type Air Conditioner unit of 2.0 TR capacity as per the specifications given in Annexure-XXI of tender document. | — | — | — | 4,99,000 | |
| — | 1.00 | — | — | ||
| Supply, installation, testing and commissioning of Air Handling Unit (AHU) of 11 TR (5.5 x 2) capacity along with dismantling of existing unit - The price shall cover for supply, installation, testing and commissioning of Air Handling Unit (AHU) of 11 TR (5.5 x 2) capacity as per the specifications given in Annexure-XXI of tender document. | — | — | — | 13,50,360 | |
| — | 3.00 | — | — | ||
| Supply, installation, testing and commissioning of Air Cooled 8.5 TR Ducted Air Conditioner unit completely charged with refrigerant gas and other accessories along with dismantling and removal of existing AC package units along with associated cables, pipes, trays etc. - The price shall cover for supply, installation, testing and commissioning of Air Cooled 8.5 TR Ducted Air Conditioner unit completely charged with refrigerant gas and other accessories as per the detailed specifications given in Annexure-XXI of tender document. | — | — | — | 5,10,486 | |
| — | 4.00 | — | — | ||
| Supply, installation, testing and commissioning of Air Cooled 11.0 TR Package Air Conditioner unit completely charged with refrigerant gas and other accessories along with dismantling and removal of existing AC ducted units along with associated cables, pipes, trays etc. - The price shall cover for supply, installation, testing and commissioning of supply, installation, testing and commissioning of Air Cooled 11.0 TR Package Air Conditioner unit completely charged with refrigerant gas and other accessories as per the specifications given in Annexure-XXI of tender document. | — | — | — | 25,18,120 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
RailwayBoardsletterNo.2018_CE-I_CT_9dated04.06.18.pdf
ATTACHMENT
BankGuaranteeverification.pdf
ATTACHMENT
2024_06_03InstructionforincorporatingtheJPOCircularetc_ProvisionsintheTenderDocumentforallworksrequiringdiggingworksclosetoRly1.pdf for cable
ATTACHMENT
TenderDocument-BRC-EL-P-17-2460-25-26-RNEWGCC.pdf
ATTACHMENT
2024_06_03InstructionforincorporatingtheJPOCircularetc_ProvisionsintheTenderDocumentforallworksrequiringdiggingworksclosetoRly1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .