Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹90,977.42Accepted-AOC KOTTAVILA PUTHUVAL PUTHENVEEDU PARASALA P O PAVATHIYANVILA | THIRUVANANTHAPURAM | KERALA | 695001 | 1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Reject | |
| 3 | Rejected-Technical | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | JESWIN JIJO L2 | SAJU K L1 | SREEJITH R S L2 |
|---|---|---|---|---|---|---|
| 1.00sidewall | ||||||
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 3.8 | cum | 962.76 ₹3,658.49 | 655.54 ₹2,491.05 Lowest | 962.76 ₹3,658.49 |
| 1.00 | OD440243/2025-2026:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 3.6 | cum | 6,320.34 ₹22,753.22 | 4,303.51 ₹15,492.64 Lowest | 6,320.34 ₹22,753.22 |
| 1.00 | OD440240/2025-2026:Stone Masonry Work in cement mortar in foundation of Head walls complete as per drawing and technical specification Clause 1109<br> (A) In 1:5 cement mortar<br>III. Random Rubble Masonry | 13.53 | cum | 7,920.93 ₹1,07,201.87 | 5,393.36 ₹72,993.73 Lowest | 7,920.93 ₹1,07,201.87 |
Tender Value
₹1.3 L
EMD Value
₹3,340
Closing Date
25 Feb 2026, 6:00 pmClosed
Assistant Engineer
O/o the Assistant Engineer, LID EW Section, Vilappil, Peyad P.O, Thiruvananthapuram
Annual Plan-227/2025-26 KAKKULAM THODU SIDEWALL CONSTRUCTION IN WARD NO.15-OF VILAPPIL GP
2026_LSGD_836674_9
11/AE/LSGD/VPLGP/2025-26
Open Tender
Civil Works - Roads
Item Rate
90 days
Vilappil
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹3,340
Yes
18 Jun 2026
18 Feb 2026
27 Feb 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
sidewall
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
OD440243/2025-2026:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
OD440240/2025-2026:Stone Masonry Work in cement mortar in foundation of Head walls complete as per drawing and technical specification Clause 1109<br> (A) In 1:5 cement mortar<br>III. Random Rubble Masonry
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tendernotice_2.pdf
PDF • 1.83 MB
Tendernotice_3.pdf
PDF • 0.25 MB
Tendernotice_4.pdf
PDF • 0.29 MB
Tendernotice_5.pdf
PDF • 0.25 MB
Tendernotice_6.pdf
PDF • 0.25 MB
BOQ_1409576.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .