Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹4.5 Laccepted-aoc | ₹4.5 L | accepted-aoc |
Tender Value
₹5.1 L
EMD Value
₹5,126
Closing Date
23 Mar 2026, 4:30 pmClosed
MUNICIPAL CORPORATION TIRUPATI
Thirupathi
Construction of damaged drains from 19-4-345/A to 19-4-372 and from 19-4-335 to 19-4-345 at STV Nagar in Ward No. 14 (Reserved for SC/ST and Waddera).
908946
424/TPT/25-26/GEN/TO, DT. 04-03-2026
OPEN - NCB
Civil Engineering Works
TIRUPATHI
8 documents required · 7 mandatory · 1 optional
₹182
₹5,126
7 Apr 2026
7 Mar 2026
7 Mar 2026
BLD-CSTN-12-1 Demolishing and disposal of unserceable materails within 100 Mts lead For brick work (Revised standard data) BLD-CSTN-14-9
BLD-CSTN-12-1 Demolishing and disposal of unserceable materails within 100 Mts lead for CC Ramps
BLD-CSTN-12-2 Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 Mts lead for RCC Ramps
(RBR -FNDN-1 (i)) Earthwork excavation for Structures as per drawing and technical specifications clause 305.1 including dewatering, setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50mtrs, dressing of sides, bottom and back filling in trenches with excavated suitable material as per technical specification 305 MORD / 304 MORth
(RBR-FNDN-2) Providing bedding with sand for necessary areas as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge (as per SSR 14-15- Amendment)
(RBR-FNDN-4G-4V-i) Providing Plain cement concrete M 15 Grade Nominal Mix as approved by the department using 20 mm graded hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge (may be used as CC 1:2:4)
for Drain Walls
(BLD-CSTN 6-3) Plastering with CM (1:5) prop., 12 mm thick, with sponge finishing including cost and conveyance of all materials to site, tools and plants, labour charges, leads, lifts, curing, scaffolding and all other incidental and operational charges etc., complete for finished item of work
(BLD-CSTN 2-13) RCC M- 20 Nominal Mix as approved by the department Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For M20 Culvert SLABS - above 150 mm - Up to 300 mm thick
(BLD-CSTN-2-18) Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete
Carting away the surplus excavated material i.e., earth from the site to a suitable distance of about 5 kms including loading, unloading, conveyance, labour charges, all leads and lifts and other incidental and operational charges etc., complete.
Stone Type Materials
Earthern Type Materials
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ No 424-25-26.xlsx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .