Tender Value
₹65.5 L
EMD Value
₹65,496
Closing Date
3 Aug 2026, 2:00 pmClosed
MANGALAGIRI TADEPALLI MUNICIPAL CORPORATION
MANGALAGIRI TADEAPLI MUNICIPAL CORPORATION
Widening of BT Road from Prakasam Circle to Undavalli Skew Bridge at Seethanagaram in Tadepalli Urban of Mangalagiri Tadepalli Municipal Corporation under General Funds
968492
32/JTO/2026-27 - 19
OPEN - NCB
Road Work
GUNTUR, ANDHRA PRADESH
12 documents required · 11 mandatory · 1 optional
₹2,319
₹65,496
26 Jul 2026
26 Jul 2026
26 Jul 2026
Engaging of Backhoe Loader & Front end Dozer on Hire basis for removing & leveling, including wages of driver cleaner and cost of diesel engine oil and all consumables etc., completed as directed by the departmental officer
Hiring of Tractor including all Charges of Fuel, Crew charges and Lubricants and all incidental charges complete
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
Carting away the surplus excavated earth from the work site with a lead of 3.00 Km beyond initial lead including loading, unloading, conveyance and stacking charges etc., complete.
Construction of granular sub-base by providing well graded material/ close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller 80-100 kN/ Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH for Grading - III material.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH for finished item of work.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) etc., complete as per S.S. and as per directions of the departmental authorities. (Low porosity)
Providing and laying Bituminous Macadam with 100-120 TPH / 40-60 TPH hot mix plant producing an average output of 75 tonnes/ 37.50 t per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction as per Tech. specification No. 504 MORTH etc., complete in all respects for finished item of work as per directions of the departmental authorities
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.
Providing 25 mm thick compacted semi dense bituminous concrete by hot mix plant using hard blasted granite crushed aggregate of grading-II premixed with bituminous binder V.G.30 grade @ 5.00 per cent of mix and filler, transporting the hot mix to work site, laying with a Mechnical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification complete for finished item of work in all respects as directed by Engineer-in-charge.Note: The percent of bitumen is proposed for rate analysis only. The actual percent shall be arrived based on job mix formula.
Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorsing glass beads @ 250gms with reflectorising glass beads bituminous surface at 250 gms per sqm area, thickness of 2.5mm is exclusive surface applied glass bead as per IRC:35, the material should be of BERGER company/BERGER equivalent and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel. In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consingment of the said material and wila compell the vendor has to repalce the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department) b) Luminance factor of the material should be in the range of 80-85% at 45degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, part-1 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion: Strong E) Softening point:102 degree centrigrade F) Dried film finish: Smooth and uniform G) Night vision: High as directed by the Engineer-in-Charge and confirming to IS:164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-1997
Supply and fixing of Molded Shanks raised Pavement Markers made of polycarbonate and ABS molded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000Kg tested in accordance to ASTM D 4280 type H and complying to specifications of Category A of MORTH circular no RW/NH- 33023/10-97-Do III, Dt.11-06-1997. The height, width and length shall not exceed 50mm, 100mm and 100mm with minimum reflective area of 13 Sqm on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/- 2mm and height not less than 30+/- 2mm) from the body is to be a minimum value of 700Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete and as directed by the Engineer-in-Charge.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ BT Road Skew Bridge.xlsx
TENDER_DOCUMENT • 0.24 MB
DECLARATION.docx
TENDER_DOCUMENT • 0.02 MB
NIT and BOQ.xls
TENDER_DOCUMENT • 0.27 MB
Tender Doc.docx
TENDER_DOCUMENT • 0.16 MB
Tender Doc.zip
document • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .