| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹45.0 L+₹18,622.56 (0.42%)Admitted-Fee/PreQual/Technical/Finance DOOR NO 2 859J KBNSS LTD BUILDING II FLLOOR ERANHIPALAM P O KOXHIKODE 673006 | KOZHIKODE | KERALA | 673006 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹46.3 L+₹1.4 L (3.16%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹53.5 L+₹8.7 L (19.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | AK.DINESHAN L4 | Muhammed Uwais T T L3 | TECTONICS ENGINEERING PROJECTS L2 | Santhosh Kumar K.V. L1 |
|---|---|---|---|---|---|---|---|
| 1.00Detailed Estimate | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 690 | sqm | 10 ₹6,900 Lowest | 14.3 ₹9,867 | 16.7 ₹11,523 | 14 ₹9,660 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 11 | each | 1,000 ₹11,000 | 432.1 ₹4,753.1 Lowest | 505 ₹5,555 | 500 ₹5,500 |
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 222.48 | cum | 400 ₹88,992 | 515 ₹1,14,577.2 | 300 ₹66,744 Lowest | 492 ₹1,09,460.16 |
| 1.00 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 48.4 | cum | 200 ₹9,680 | 184.3 ₹8,920.12 | 200 ₹9,680 | 180 ₹8,712 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9.3 | cum | 7,000 ₹65,072 | 6,222.7 ₹57,846.22 | 6,200 ₹57,635.2 | 6,000 ₹55,776 Lowest |
| 1.01 | OD94276/2025-2026:Providing and laying in position machine batched and machine mixed design mix M- 30 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. Note : Cement Content
considered in this item is @340kg/cum. All work up to plinth level
Note: Excess or less cement used as per mix design is not payable or recoverable separately | 58.31 | cum | 9,500 ₹5,53,926 | 8,611.6 ₹5,02,125.17 Lowest | 9,500 ₹5,53,926 | 9,075 ₹5,29,145.1 |
| 1.01 | OD94277/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge.
Note:- Cement content considered in this item is @ 340 kg/cum. Excess or less cement used as
per design mix is not payable or recoverable separately. All work above plinth level up to
floor V level | 59.4 | cum | 11,000 ₹6,53,400 | 10,207.4 ₹6,06,319.56 Lowest | 10,800 ₹6,41,520 | 10,750 ₹6,38,550 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 5,787.84 | kilogram | 98 ₹5,67,208.32 | 89 ₹5,15,117.76 | 80 ₹4,63,027.2 Lowest | 80 ₹4,63,027.2 Lowest |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 10,942.92 | kg | 98 ₹10,72,406.16 | 89 ₹9,73,919.88 | 80 ₹8,75,433.6 Lowest | 80 ₹8,75,433.6 Lowest |
Tender Value
₹54.0 L
EMD Value
₹50,000
Closing Date
4 Aug 2026, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer, PWD Buildings Division, Kozhikode
GENERAL Construction of Medical Record Library Near Old Casuality Attached to Govt Medical College Kozhikode General Civil Work
2026_PWD_862843_1
11/EEBK/2026-27
Open Tender
Civil Works - Buildings
Item Rate
365 days
Medical college
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
10 Aug 2026
28 Jul 2026
6 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Estimate | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | - | - |
| 1.003 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 1 | cum | - | - |
| 1.004 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 1 | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.006 | OD94276/2025-2026:Providing and laying in position machine batched and machine mixed design mix M- 30 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. Note : Cement Content
considered in this item is @340kg/cum. All work up to plinth level
Note: Excess or less cement used as per mix design is not payable or recoverable separately | 1 | cum | - | - |
| 1.007 | OD94277/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge.
Note:- Cement content considered in this item is @ 340 kg/cum. Excess or less cement used as
per design mix is not payable or recoverable separately. All work above plinth level up to
floor V level | 1 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.009 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | - | kg | - | - |
stage.html
html • 0.02 MB
finance_1459420.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.64 MB
OfficeMemorandum.pdf
Other Document • 0.23 MB
BOQ_1459420.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .