Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹20.8 L+₹3.6 L (21.2%)Rejected-Finance WARD NO 10 DEVINAGAR PAONTA SAHIB DISTRICT SIRMOUR H P | L2 | Rejected-Finance L2 | |
| 3 | L3₹21.7 L+₹4.6 L (26.8%)Rejected-Finance VILLAGE DHANERNI P O TEH DALHOUSIE DISTT CHAMBA HP | L3 | Rejected-Finance L3 |
Tender Value
₹25.6 L
EMD Value
₹51,500
Closing Date
16 Apr 2026, 10:00 amClosed
Yogesh Sharma
Executive Engineer Division HPPWD Shillai
SH. Formation Cutting 5/7 mtrs wide road from Km 0/0 to 2/00) Under MNP (PDNA)
2026_PWD_133487_3
NIT-SHI-01-100 dated 01.04.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Shillai
Refers to tender document
10 documents required · 10 mandatory
₹2,000
₹51,500
23 Apr 2026
7 Apr 2026
16 Apr 2026
7 Apr 2026
16 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work in all heights and depths in all kinds of soil, including saturated soil comprising of pick work, jumperwork and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soil including, dewatering wherever required, setting out to the required lines, levels as shown on the drawing and directed by the Engineer-in-Charge at site., according to HP.PWD specifications of 1990 ( One thousand nine hundred ninety) volume-I (One) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor at his own cost) as per satisfaction of Engineer - in - chrage through all modes of transportation including head load , animal load or mechanical means along with its leveling fine dressing and with all kinds of lobour , machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required). All usefull material, such as stones, shingles, aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation and used / removed as per the direction of the Engineer -in- Chrage. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. Note:- The contractor has to stock at least 533.16(five Hundred thirty three point Sixteen ) Cubic meter of stones along with road and road over to the department other wise recoverd of un stacked quanitity will be recoverd @ of Rs. 300/- (Three hundred seventy) per Cubic meter. | - | Per Kilometre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.80 MB
Tendernotice_2.pdf
PDF • 1.87 MB
SBDPanogmarket3.pdf
Tender Documents • 3.94 MB
BOQ_197473.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .