Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | L1 | Accepted-AOC lowest tenderer | |
| 2 | L2₹1.2 Cr+₹2.2 L (1.90%)Rejected-Finance 17E COLLECTOR OFFICE ROAD VENKATHESAPURAM SUNDAR NAGAR EXTENSION NEAR DIC PERAMBALUR 621 212 | PERAMBALUR | TAMIL NADU | 621212 | L2 | Rejected-Finance Higher than
Lowest
tenderer | |
| 3 | L3₹1.2 Cr+₹5.5 L (4.76%)Rejected-Finance | L3 | Rejected-Finance Higher than
Lowest
tenderer |
Tender Value
₹1.1 Cr
EMD Value
₹65,000
Closing Date
4 Feb 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer-H-CandM Circle Villupuram
Office of the Superintending Engineer-H-C and M- Circle Ellis Chatram Road-Vazhudareddy-Villupuram
Reconstruction of Minor Bridge at Km 4/8 of Puduvettaikudi - Labbaikudikadu road -Via- Veppur -VPM 048
2022_HWAY_219920_1
TN49/2021-22/HDO/Dt.10.01.2022
Open Tender
Civil Works - Highways
Percentage
120 days
Perambalur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹65,000
21 Apr 2022
17 Jan 2022
7 Feb 2022
17 Jan 2022
4 Feb 2022
21 Jan 2022
19 Jan 2022 - 19 Jan 2022
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Minor bridge | |||||
| 2 | Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for Random Rubble Masonry as per MORTH No.111,112,202 | 85.65 | cubic metre | 221.9 | ₹19,005.74 |
| 3 | Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for RCC Pipes as per MORTH No.111,112,202 | 45 | Running metre | 304 | ₹13,680 |
| 4 | Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for Plain Cement Concrete as per MORTH No.111,112,202 | 34.16 | cubic metre | 381 | ₹13,014.96 |
| 5 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL as per MoRT&H No.111, 112, 304 | 153.82 | cubic metre | 96.6 | ₹14,859.01 |
| 6 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND WINGS as per MoRT&H No.111, 112, 304 | 521.63 | cubic metre | 323.2 | ₹1,68,590.82 |
| 7 | Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal with M - Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plantsand employed etc., complete as per relevant standard specifications, for FOOTINGS OF ABUTMENTS, PIERS AND WINGS BELOW SILL LEVEL as per MORTH No.111, 112, 900, 1000, 1500, 1700, 2100 | 424.95 | cubic metre | 6,491 | ₹27,58,350.45 |
| 8 | Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal with M - Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS ABOVE SILL LEVEL as per MORTH No.111, 112, 900, 1000, 1500, 1700, 2200 | 163.53 | cubic metre | 7,617 | ₹12,45,608.01 |
| 9 | Vibrated Reinforced Cement Concrete of grade M30 design mix using ISS size HBG graded metal with M - Sand including cost and conveyance of all materials to site including cost of cement at site excluding cost and fabrication of steel. But including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS as per MORTH No.111, 112, 900, 1000, 1500, 1700, 2200 | 7.95 | cubic metre | 11,114 | ₹88,356.3 |
| 10 | Providing and fixing 110mm dia PVC seepage pipes of required length for abutments and wings including cost and conveyance of all materials to work site, cost and labour semi spherical backfill arrangements with 100mm size granite stone at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification as per MORTH No.2706 to drain of the backfill IN THE ABUTMENTS AND WINGS, - | 37.92 | Running metre | 193.5 | ₹7,337.52 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Receipt-and-opening.pdf
Tender Document • 0.38 MB
Tendernotice_1.pdf
Tender Document • 0.06 MB
48_Bid_21-22.pdf
Tender Document • 0.45 MB
BOQ_260082.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .