Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC VILL SURAN P O KHADYAD TEH KOTLI DISTRICT MANDI H P | ₹2.6 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹2.7 Cr+₹17.0 L (6.64%)Rejected-Finance VILLAGE GRARI PO BHOGDHAR SIRMOUR HP | SIRMAUR | HIMACHAL PRADESH | 171226 | ₹2.7 Cr+₹17.0 L (6.64%) | L2 | Rejected-Finance 2nd lowest bidder |
| Sl No | Description | Qty | Unit | Jai Parkash L2 | YOGESH KUMAR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads and lifts.All kinds of soil. | 424.21 | Cum | 150 ₹63,631.5 Lowest | 150 ₹63,631.5 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level - 1:4:8 (1 Cement : 4 coarse sand : 8 crushed graded stone aggregate 40 mm nominal size) | 63.99 | Cum | 4,500 ₹2,87,955 | 3,600 ₹2,30,364 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering for upto top level -1:3:6 (1 Cement : 3 coarse sand: 6 crushed graded stone aggregate 20 mm nominal size) | 10.4 | Cum | 5,000 ₹52,000 | 4,200 ₹43,680 Lowest |
| 4.01 | Centering and shuttering including strutting, propping etc. and removal of form for : (a) Foundations, footings, bases of columns, etc. for mass concrete | 71.92 | Sqm | 200 ₹14,384 Lowest | 200 ₹14,384 Lowest |
| 4.02 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 23.1 | Sqm | 350 ₹8,085 Lowest | 350 ₹8,085 Lowest |
| 4.03 | Columns, Pillars, Piers, Abutments, Posts and Struts | 566.76 | Sqm | 450 ₹2,55,042 | 400 ₹2,26,704 Lowest |
| 4.04 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 863.71 | Sqm | 350 ₹3,02,298.5 | 300 ₹2,59,113 Lowest |
| 4.05 | Suspended floors, roofs, landings, balconies and access platform | 1,058.21 | Sqm | 420 ₹4,44,448.2 | 400 ₹4,23,284 Lowest |
| 4.06 | Stairs, (excluding landings) except spiralstaircases | 28.8 | Sqm | 420 ₹12,096 | 400 ₹11,520 Lowest |
| 4.07 | Edges of slabs and breaks in floors and walls | 258.4 | Mtr | 120 ₹31,008 | 50 ₹12,920 Lowest |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
22 Jun 2026, 5:00 pmClosed
Executive Engineer
HPSIDC Shimla
Construction of RTO Office Building
2026_SIDC_136318_1
Job No. 4
Open Tender
Civil Works
Item Rate
360 days
Sirmour
Please refer Tender documents.
12 documents required · 12 mandatory
₹7,000
₹5.6 L
18 Sept 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads and lifts.All kinds of soil. | 424.21 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level - 1:4:8 (1 Cement : 4 coarse sand : 8 crushed graded stone aggregate 40 mm nominal size) | 63.99 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering for upto top level -1:3:6 (1 Cement : 3 coarse sand: 6 crushed graded stone aggregate 20 mm nominal size) | 10.4 | Cum | - | - |
| 4.01 | Centering and shuttering including strutting, propping etc. and removal of form for : (a) Foundations, footings, bases of columns, etc. for mass concrete | 71.92 | Sqm | - | - |
| 4.02 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 23.1 | Sqm | - | - |
| 4.03 | Columns, Pillars, Piers, Abutments, Posts and Struts | 566.76 | Sqm | - | - |
| 4.04 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 863.71 | Sqm | - | - |
| 4.05 | Suspended floors, roofs, landings, balconies and access platform | 1,058.21 | Sqm | - | - |
| 4.06 | Stairs, (excluding landings) except spiralstaircases | 28.8 | Sqm | - | - |
| 4.07 | Edges of slabs and breaks in floors and walls | 258.4 | Mtr | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_201747.xls
BOQ • 0.47 MB
correcttqc_merged.pdf
Tender Documents • 2.75 MB
Agreement.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .