Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.9 L
EMD Value
₹42,365
Closing Date
24 Oct 2026, 5:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Assistant Executive Engineer (Fort)
OFFICE OF ASSISTANT EXECUTIVE ENGINEER , FORT ZONAL ,TVPM CORPORATION
444/27 Interlocking Maintanance and construction of Rain pit at Cheruresmi center veppinmoodi Donbosco Karuppayiroad St Xeviers, St Marys Fathima Matha, FCI Lissy,Jussa, Lena ,Kosi Cargo,GVraja Rajeevnager kannanthura in valiyathura ward
2026_LSGD_879622_6
LSGD/CELSGD/AEE4/FORT26-27(7)
Open Tender
Civil Works - Roads
Item Rate
180 days
TVPM CORPORATION FORT ZONAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,365
Yes
15 Oct 2026
15 Oct 2026
26 Oct 2026
15 Oct 2026
24 Oct 2026
15 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance | |||||
| 1.001 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 32.7 | cum | - | - |
| 1.002 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 2.6 | cum | - | - |
| 1.003 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 12.46 | cum | - | - |
| 1.004 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.94 | tonne | - | - |
| 1.005 | OD141252/2026-2027:Mancoolie for cleaning | 5 | Day | - | - |
| 1.006 | OD141253/2026-2027:PVC Weep Holes | 25 | metre | - | - |
| 1.007 | OD141254/2026-2027:Lifting, conveying and placing in position precast RCC Covering Slab of 1.0m x .50m or nearest size over Open Drain/ Cross Drain etc. including all charges complete. | 10 | no | - | - |
| 1.008 | OD141255/2026-2027:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 4.95 | cum | - | - |
| 1.009 | OD141259/2026-2027:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. (Modi. Spec. 16.83) | 780.05 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1496124.xls
BOQ • 0.31 MB
444PA.pdf
Tender Documents • 0.25 MB
444AFFIDAVIT.pdf
Tender Documents • 0.23 MB
444FOT.pdf
Tender Documents • 0.25 MB
epayment.pdf
Tender Documents • 0.24 MB
integrity.pdf
Tender Documents • 0.24 MB
SBD.pdf
Tender Documents • 1.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .