| 1 | L3₹38.1 L+₹3.1 L (8.77%)Accepted-AOC | L3 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | L1₹35.0 LRejected-Finance | L1 | Rejected-Finance Rejected due to not considering profit | |
| 3 | L2₹38.1 L+₹3.1 L (8.77%)Rejected-Finance 195 MAHESH NAGAR AMBALA CANTT 133001 | AMBALA | HARYANA | 133001 | L2 | Rejected-Finance Rejected due to not considering profit | |
| 4 | L4₹38.1 L+₹3.1 L (8.86%)Rejected-Finance 59 NEW MARKET CLOCK TOWER DEHRADUN UK PIN 248001 | DEHRADUN | UTTARAKHAND | 248001 | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹38.8 L+₹3.7 L (10.7%)Rejected-Finance 50 SARASWATI VIHAR SINGHAWALA AMBALA CITY | AMBALA CITY | L5 | Rejected-Finance Other than lowest bidder |
Tender Value
₹39.9 L
EMD Value
₹79,700
Closing Date
28 Feb 2020, 6:00 pmClosed
GE UTILITY AMBALA CANTT
GE UTILITY AMBALA CANTT - 133001
MANNING AND OPERATION OF WATER SUPPLY INSTALLATIONS IN SECTOR C UNDER GE UTILITY AMBALA CANTT
2020_MES_318928_1
GE(U)/AMB-50/2019-20
Open Tender
Civil Works
Item Rate
330 days
AMBALA CANTT
As per tender documents
8 documents required · 8 mandatory
₹500
GE UTILITY AMBALA CANTT
₹79,700
Yes
21 Mar 2020
1 Feb 2020
29 Feb 2020
1 Feb 2020
28 Feb 2020
15 Feb 2020
1 Feb 2020 - 14 Feb 2020
Amount
SCHEDULE 'A' (SECTION-I) Manning and Operation of complete water supply System by Technically qualified teams for round the clock i.e three shift per day (01 FGM Skilled per shift of 8 hrs) including Sunday and Holidays. The installation comprrises of 50HP submersible pump set at TW -50 Sec C Area complete all as specified and directed by Engr-in-Charge. The scope of work primarily comprises of :-
(a) Running of pump set and to fill connected over head tanks complete round the clock all as directed by Engr-in-Charge othrewise a panelty of Rs 500/- per day will be imposed for not running pump sets without any fault or over funning the pump set resulting in over flow of OHT and wastage of water.
(b) Operation of chloronome plats, Contractor will be responsible for proper chlorination of water i.e 2 ppm at installation and maintain the register of daily results otherwise a panelty of Rs 250/- per day will be imposed for not operation of chloronmome plants and Rs. 350/- per day penalty will be imposed for not maintain the results of 2.00 ppm at installtion.
(c) Minor repair such as gland packing , Nut Bolts if reqd at site otherwise a panelty of Rs 100/- per day will be imposed for not providing gland packing/leakage of valves within the installation.
(d) Rectifying any electric complaints within the installation which is essential to run instalaltion will be carried out by the contractro otherwise a panelty of Rs. 500/- per day will be imposed for not rectifying the lectric complaints within the installation.
(e) The contractor will submit log sheet of pump set, Generator and Chloronome Plant per month to Engr-in-Charge. In Case of non submission of log sheets a panelty of Rs. 2500/- will be imposed per month.
(f) Area of installation will be kept neat & clean by removing growth of vegetation, grass and bushes at of installation, at the path of installation and upto whole installation, Suitable endorsement for this will be made daily in a register kept at installatin. Penal recovery at the rate of Rs. 1000/- per day will be recovered in case of installation and surrounding area found unsatisfactory.
(g) Proper accounting and security of Govt Asset. Any loss will be made good by the contractor. All the pumpsets installed in pump house will be sole responsibility of the contractor. Any damage or loss of the govt property will be made good by the contractor.
(h) All type of stationary, T&P for maintenance & operation will be provided by contractor.
(j) All safety provision contained in IE rules will be followed by the contractor.
Description all as per Srl Item No. 1 (including it's sub clauses) here in before but 01 FGM (Skilled) and 01 helper (Unskilled) per shift of 8 hrs for three shifts for operation of SYL phase-II and old SYL installation comprises of 14 centrifugal pumps of capacity 3x45KW, 3X30KW, 3X40KW, 3X37KW (Turbine pump set), 2X18KW, DG Set of capacity 400KVA, LT Panel, AMF Panel and chloronome plats Sector C area complete all as specified and directed by Engr-in-Charge.
Manning and operation of water supply, distribution system by technically qualified teams including Sunday and holiday 01 Valve man (Skilled) per shift of 08 hours for one shift for OHT No. 4, 10, 10A, 14, 43, 48 & 50 and 01 valve man (Skilled) per shift for Three shifts of 08 hours for OHT No. 02, 18, 31 and 268 Engr Regt of Sector C and their dependent area by controlling of sluice valves in the area. The scope of work comprises of:- (a) M&O of sluice valve and regulation of drinking water. Penalty Rs. 200 per OHT per shift will be imposed for non opening the sluice valve and non supply of water. (b) Cleaning of valve pit. Penalty Rs. 100 will be imposed for not cleaning of valve pit, a register will be maintained for the same. (c) Minor repair such as gland packing if required. Penalty Rs. 100 will be imposed for leaking of valve. (d) Area of installation below and upto 3 mtr surrounding over head tank and its path will be kept neat and clean. Penalty Rs. 250 per overhead Tank per day will be charge. (f) Log sheet to be maintain and submitted at the month end otherwise Panelty of Rs 200/- will be imposed. (f) Proper accounting and seurity of Govt assests. (g) All type of stationary shall be provided by contractor. (h) All safety provn to be maintained by contractor.
Note . (a) The Contractor shall qoute his rates not less than minimum wages as applicable including all taxes, ESI, contractor's profit etc. In this connection please refer Note 20 of Sch A/BoQ Notes mentioned in tender documents.
S&F in replacement contactor complete set of 3 pole MNX 25, MNXA, A2, MNX 70, AC rating 220V to 440V suitable for 30KW, 40KW, 45KW and 22 KW motor starters complete all as specified.
S&F in replacement timer switch type ST 100 suitable for 240 Volts with mounting kit of capacity 3-30Sec, 50 Hz complete as as specified.
S&F in replacement cast iron sluice valve PN-1.6 with flanged ends 150 mm nominal bore ISI marked complete with stainless steel spindle and cast iron cap including rubber /fiber board gasket, nuts, washers etc including taking down old unserviceable sluice valve complete all as specified and as directed by Engineer-in-Charge.
Supply and fix in replacement cast iron Non return valve with foot valve (flanged) reflux 150mm nominal bore ISI marked conforming to IS-5312 including rubber/fiber board gasket , nuts, washers etc including taking down old unserviceable Non return valve (flanged) reflux complete all as specified and directed by Engr-in-Charge.
Disconnecting all electrical connections from electric motor 60 HP and decoupling from pump assembly and dismantling from foundation and transporting to local workshop approved by Accepting Officer for opening the motor taking out of burnt winding and thorough cleaning of the slotes, rewinding the complete motor with supper enamaled copper wire of same size and provn of supper quality insulating materials, warnishing and drying and taking back from wksp including laths and other any type of machine work such as rotor work, welding, metalling, machining and grinding for bearing sheet etc and mounting, connecting all electrical connections alongwith reassembling pump set and testing complete all as directed by Engr-in-Charge.
Description all as per item no. 08 above but 50 HP motor and ditto-
Description all as per item no. 08 above but 40 HP motor and ditto-
S&F Float valves of size 20 mm high pressure of PTMT with epoxy coated Aluminium rod & high-density plastic ball screwed for iron pipe and fixed in repair complete all as specified and directed.
Raman Electric Trading Co
POWER ELECTRONICS ENGINEERS
M/s badrinath Traders
R N Enterprises
G M CONSTRUCTION COMPANY
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .