| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance LION TOWER PLOT NO 97 ELEGANT ESTATE BAIRAGARH CHICHLI KOLAR ROAD BHOPAL M P | BHOPAL | MADHYA PRADESH | Admitted-Finance |
Tender Value
₹70 L
Closing Date
30 Aug 2023, 5:00 pmClosed
CHIEF ENGINEER PROJECT DEEPAK
HQ CHIEF ENGINEER PROJECT DEEPAK HARI NAGAR CHAKKAR BARRIER SHIMLA 171005
RETENDER FOR CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT AND PROVIDING PRE CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF HIGHWAY TUNNEL BETWEEN KM 10pt250 TO KM 10pt650 ON MAR UNDER 108 RCC 759 BRTF P DPK IN THE STATE OF HP
2023_BRO_602999_1
CE (P) DPK/03/2023-24
Open Tender
Civil Works
Lump-sum
180 days
MALLING ALTERNATE ROUTE
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹5,000
Yes
CHIEF ENGINEER PROJECT DEEPAK
Exempted
SHIMLA
18 Oct 2023
13 Jun 2023
31 Aug 2023
13 Jun 2023
30 Aug 2023
28 Jun 2023
13 Jun 2023 - 22 Jun 2023
24 Jun 2023
Amount
Remuneration for Local/Expatriate Staff (inclusive of per diem allowance) A. Key Professionals
Team Leader cum Senior Tunnel Expert
Tunnel Design Expert
Senior Ventilation and Fire Safety Expert
Senior Geotechnical Expert
Directional Coring Expert / Senior Geologist
B. Other Professionals (Mandatory)
Quantity Surveyor/ Documentation Officer
Senior Surveyor Engineer
Environmental Engineer
Material Engineer
Highway cum Pavement Engineer
Quantity Surveyor/ Documentation Officer
Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and minimum 06 Nos to be deployed)
Support Staff (inclusive of per diem allowance) Note: To be assessed by consultant as per requirement of assignment
Office Manager
Typist
Office Boy
Night Watchman
Transportation (Fixed Costs)
The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
Duty Travel to Site (Fixed Costs)
Trips
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.
Office Rent
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies Drafting
Supplies Computer
Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
Office Furniture and Equipment (Fixed Costs)
Survey and Investigation
Topographic Survey (Fixed Rate) & Investigation (All investigations surveys including Material Survey and Investigation, Sub-grade Investagation, Traffic Survey, Socio-economic & Census Survey/Studies.)
Land Acquisition Team including suppot staff and logistics/transportation
Land Acquisition Team including suppot staff
Ex-Land Revenue Inspector/ Officer or equivelent
Ex-Kanoogo/ Girdawar or equivelent
Ex-Patwari or equivelent
Typist
Logistics for Land Acquisition Team
Computer including necessary peripherals
Printers
Vehicles
Sub-Soil Investigation and Other Works The rate includes transportation of all plant, manpower, drilling accessories, sampling equipment work site, erection on site, for Coring (Soil drilling testing and rock coring), trial pit, hand auguring, reinstatement of borehole etc including grouting in zones of weakness
a) Vertical Boring in all type of soils (other than hard rock)
b) Vertical Boring in hard rock
Directional Coring Inclined soil, artificial hard material or boulder drilling and directional coring in rock arterial hard material or boulder from the launch site at ground level to the commencement of the HDC trajectory (Length reckoned from commencement of HDC trajectory). The rate includes transportation of all plant, manpower, drilling accessories, sampling equipment work site, erection on site for Horizontal Directional Coring (Soil drilling testing and rock coring), trial pit hand auguring, reinstatement of borehole etc. including grouting in zone of weakness.
Not exceeding 100 m in length
Exceeding 100 m in length but not exceeding 200 m length in rock
Exceeding 200 m in length but not exceeding 300 m length in rock
Exceeding 300 m in length but not exceeding 400 m length in rock
Reports and Document Printing
Monthly Report (3 copies per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report& RAP
Final Environmental Assessment report& RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Document
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each)
LA & Clearances II Report
Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway/Tunnel at 50 m interval.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .