| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Finance | ₹4.0 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 LAdmitted-Finance | ₹4.2 L | L2 | Admitted-Finance |
| 3 | L3₹4.7 LAdmitted-Finance | ₹4.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Zakir Hussain L1 | DINA NATH L3 | NOOR HUSSAIN L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc in earth work lift up to 15 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick Jumper work. | 188.58 | Cum | 355 ₹66,945.90 | 450 ₹84,861 | 365 ₹68,831.70 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 40 mm nominal size) in all leads and lifts. | 3.5 | Cum | 8,170 ₹28,595 | 7,500 ₹26,250 | 8,150 ₹28,525 |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5: 3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) in all leads and lifts. | 2.4 | Cum | 9,450 ₹22,680 | 9,050 ₹21,720 | 9,300 ₹22,320 |
| 3.01 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, huttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) in all leads and lifts. | 5.16 | Cum | 10,100 ₹52,116 | 11,450 ₹59,082 | 11,500 ₹59,340 |
| 3.02 | Reinforced cement concrete work in beams suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of entering, shuttering, finishing and reinforcement with 1:1.5: 3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) in all leads and lifts. | 1.71 | Cum | 10,100 ₹17,271 | 11,550 ₹19,750.50 | 11,500 ₹19,665 |
| 4.00 | Centering and shuttering including strutting. propping etc and removal of form for all heights Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc in all leads and lifts. | 68.81 | Sqm. | 385 ₹26,491.85 | 550 ₹37,845.50 | 402 ₹27,661.62 |
| 4.01 | Centering and shuttering including strutting. propping etc and removal of form for all heights Suspended floors, roofs, landings, balconies and access platform in all leads and lifts. | 15.2 | Sqm. | 480 ₹7,296 | 670 ₹10,184 | 500 ₹7,600 |
| 5.00 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars in all leads and lifts. | 648.9 | Kg | 93 ₹60,347.70 | 101 ₹65,538.90 | 94 ₹60,996.60 |
| 6.00 | Providing and Fixing of MS Fabricated Protection Panel 750 mm x 750 mm made with MS Angle 40 x 40 x 4 mm for frame, MS Angle 30 x 30 x 3 mm for cover, MS Flat 25 x 5 mm for fixing of sliding door bolt and MS Sheet 3 15 mm thick for protection of manhole covers of storage tanks including the cost of cutting and welding of MS angle, MS Flat & MS Sheet, embedding in RCC Slab by drilling holes in MS angle & in RCC slab, provision for providing and fixing sliding door bolt 300 x 16 mm, MS Handle 100 mm, Lock and applying a coat of red lead paint & painting two coat with steel paint (Firoza Blue) complete job in all respect in all leads and lifts and to the entire satisfaction of the Engineer in Charge. | 1 | No. | 5,750 ₹5,750 | 5,900 ₹5,900 | 5,850 ₹5,850 |
| 7.00 | -Laying, jointing and testing (by way of circumfrential butt welded joints by electrical arc welding) and testing of GMS pipe (Medium Class) of following dia meters confirming to BIS: 1239 (Part-1), grade specified below (latest with upto date amendments) having as specified below with bevelled ends and capable of withstanding required test pressure in a random length of 4 to 7 meters, including manufacturing reducers / tapers, all short pieces, beds etc. as per site requirement made from parent tubes. The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees etc including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. GMS Pipe 65 mm (L) WT3.60 mm thick | 900 | Rmt. | 126 ₹1.1 L | 155 ₹1.4 L | 130 ₹1.2 L |
Tender Value
₹4.6 L
EMD Value
₹9,200
Closing Date
15 Jan 2026, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
C/O RCC Circular Storage Tank at Kotadhar and Laying Jointing Testing Cutting and Butt Welding of GI pipe 65mm dia RD 2600 to 3500 900 Rmt
2026_HPIPH_125102_1
15914-16013
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹9,200
17 Jan 2026
6 Jan 2026
16 Jan 2026
6 Jan 2026
15 Jan 2026
6 Jan 2026
Amount
Excavation in foundation trenches etc in earth work lift up to 15 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick Jumper work.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 40 mm nominal size) in all leads and lifts.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5: 3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) in all leads and lifts.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, huttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) in all leads and lifts.
Reinforced cement concrete work in beams suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of entering, shuttering, finishing and reinforcement with 1:1.5: 3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) in all leads and lifts.
Centering and shuttering including strutting. propping etc and removal of form for all heights Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc in all leads and lifts.
Centering and shuttering including strutting. propping etc and removal of form for all heights Suspended floors, roofs, landings, balconies and access platform in all leads and lifts.
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars in all leads and lifts.
Providing and Fixing of MS Fabricated Protection Panel 750 mm x 750 mm made with MS Angle 40 x 40 x 4 mm for frame, MS Angle 30 x 30 x 3 mm for cover, MS Flat 25 x 5 mm for fixing of sliding door bolt and MS Sheet 3 15 mm thick for protection of manhole covers of storage tanks including the cost of cutting and welding of MS angle, MS Flat & MS Sheet, embedding in RCC Slab by drilling holes in MS angle & in RCC slab, provision for providing and fixing sliding door bolt 300 x 16 mm, MS Handle 100 mm, Lock and applying a coat of red lead paint & painting two coat with steel paint (Firoza Blue) complete job in all respect in all leads and lifts and to the entire satisfaction of the Engineer in Charge.
-Laying, jointing and testing (by way of circumfrential butt welded joints by electrical arc welding) and testing of GMS pipe (Medium Class) of following dia meters confirming to BIS: 1239 (Part-1), grade specified below (latest with upto date amendments) having as specified below with bevelled ends and capable of withstanding required test pressure in a random length of 4 to 7 meters, including manufacturing reducers / tapers, all short pieces, beds etc. as per site requirement made from parent tubes. The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees etc including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. GMS Pipe 65 mm (L) WT3.60 mm thick
NOOR HUSSAIN (BID ID -607655)
DINA NATH (BID ID -607658)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Form6.pdf
Tender Documents • 0.58 MB
Form8.pdf
Tender Documents • 1.23 MB
BOQ_184185.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid