Tender Value
Refer Docs
Closing Date
21 Dec 2021, 10:00 amClosed
DGM CCnPHS
DGM CCnPHS MES DEPT, RCF TROMBAY, CHEMBUR MUMBAI
Value based biennial rate contract for maintenance jobs of scraper and conveyors in ANP bagging of Bagging plant at RCF Trombay Unit
2021_RCFL_661638_1
ET - MES/235/L/2122/300
Open Tender
Miscellaneous Services
Works
720 days
MES DEPT, RCF TROMBAY, CHEMBUR MUMBAI
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
Exempted
17 Jan 2022
7 Dec 2021
21 Dec 2021
7 Dec 2021
21 Dec 2021
7 Dec 2021
Amount
JOB NO 1 – MECHANICAL MAINTENANCE JOBS OF SCRAPER.
1-Replacement of tie rod of boom chain
2-Replacement of top shaft of B.E.
3-Tightening of B.E. / Scraping boom chain
4-Replacement of tie rod of B.E.
5-Repair / Joining of broken duplex drive chain
6-Replacement of Duplex drive chain
7-Replacement of blades of boom chain / Bucket of B.E. chain
8-Replacement of links of boom chain / Bucket of B.E. chain including inner, outer & center link
9-Replacement of take up unit of boom chain
10-Replacement of traveling G/B
11-Replacement of slewing G/B
12-Replacement of Main Drive G/B
13-Replacement of Fluid Coupling FC-16.75
14-Replacement of cup-springs of B.E. (One set contains 14 nos. of cup springs)
15-Replacement of cup-springs of Scraping boom chain (One set contains 14 nos. of cup springs)
16-Replacement of oil seal of output shaft of slewing gear box
17-Replacement of input pinion of slewing G/B with new bearings and oil seal
18-Replacement of two idlers with bearings of gear train.
19-Replacement of idler pin of gear train.
20-Opening, Cleaning the internals and box up of cover of main drive chain and gear train
21-Replacement of lantern sprocket with shear boss and shear pins
22-Replacement of shear boss with shear pins
23-Replacement of shear pins ( One set contains 4 nos. of shear pins)
24-Replacement of bottom shaft of B.E.
25-Replacement of main drive shaft of scraper
26-Replacement of Luffing rope
27-Repositioning of derailed chain with bucket / blades from guide angle of scraper
28-Replacement of simplex traveling chain of scraper
29-Repair / Joining of broken simplex traveling chain
30-Tightening of Slewing/ Main drive/Long travel Gear box & Idler cover Foundation bolt
31-Replacement of Idler Gasket
32-Replacement of BE Top shaft bracket
JOB NO 2 – MECHANICAL MAINTENANCE JOBS OF BELT CONVEYOR IN ANP BAGGING PLANT
1-Replacement of pulley’s with bearings -
1.a-Head Pulley (ET-1 to ET-8A conveyors) (dia. 16” to 24”)
1.b-Tail /Take up pulley (ET-1 to ET-8A conveyors)(dia. 12” to 20”)
1.c-Bend / Snub pulley (ET-1 to ET-8A conveyors) (dia. 12” to 20”)
1.d-Head pulley - Slat conveyors
1.e-Tail pulley - Slat conveyors
2-Replacement of Gear Box -
2.a-Gear Box Size - 6" to 8"
2.b-Gear Box Size – 10” -14”
3-Replacement of Coupling half (one side only)
3.a- Size from 6" to 8" (Grid member couplings)
3.b- Size from 9" to 13” (Grid member couplings)
3.c-4 to 6 holes ( pin bushes of coupling)
3.d-8 to 10 holes ( pin bushes of coupling)
4-Replacement of bearings of pulley
4.a-Replacement of bearings of conveyor pulley (one side only – Non drive side only) & re-positioning of pulley
4.b-Replacement of bearings of conveyor head pulley (gear box side only) & re-positioning of pulley
5-Replacement of Oil seals of gear box
5.a-Replacement of oil seal of G/B - non drive end
5.b-Replacement of oil seal of G/B - drive end by removing coupling and realignment with dial gauge.
6-Replacement of Skirt rubber/ Skirt Board/ Scrapers of Conveyor belt.
6.a-Replacement of skirt rubber/Scraper rubber of conveyor belt
6.b-Replacement of Skirt Rubber board of conveyor belt
7-Replacement of Frames and rollers of Conveyor belt
7.a-Replacement of troughing rollers (conveyor width 500-1000 mm)
7.b-Replacement of return rollers(conveyor width 500-1000 mm)
7.c-Replacement of guide rollers(conveyor width 500-1000 mm)
7.d-Replacement of troughing roller frame along with rollers
7.e-Replacement of return roller bracket (2 No) / Frames along with rollers
8-Repair/ replacement of tensioning arrangement of conveyors
9-Replacement of hold back of G/B online position with oil seal
10-Removal of conveyor belt off centre
11-Crack welding after edge preparation and grinding in running feet
11.a-Repair of chute / Diverter of bulk material and Equipment’s
11.b-Equipment related structure
12-Conveyor steel structure related jobs
13-MDS Trolley related jobs
13.a-Removal of derailment
13.b-Wheel replacement
13.c-Drive pinion replacement
13.d-Driven wheel replacement
13.e-Drive end bearing replacement
14 - Stitching machine related jobs
14.a-Overhauling of stitching machine stand at workshop.
14.b-Replacement of stitching machine stand.
14.b-Replacement of V-belts of Stitching machine.
14.b-Shifting & replacement of Stitching Machine from store/central workshop to work place.
Balaji Engineering Works
Jyotsna Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .