| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 CrAccepted-AOC | ₹11.5 Cr | L1 | Accepted-AOC Qualified |
| 2 | L2₹12.6 CrRejected-Finance WARD NO 19 BRAHMNAGAR GAFI NO 2 ROBERTSGANJ DIST SONBHADRA | ROBERTSGANJ | SONBHADRA | UTTAR PRADESH | ₹12.6 Cr | L2 | Rejected-Finance Disqualified |
| 3 | Not Admitted-Fee/PreQual/Technical 104 DOON ROYAL APPARTMENTS SEWLA KALAN DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹13 Cr
EMD Value
₹26 L
Closing Date
20 Nov 2021, 5:00 pmClosed
Superintending Engineer
Office of Superintending Engineer Construction Circle Uttarakhand Peyjal Nigam Dehradun
Rawali Mehdood Block Bahadrabad water supply scheme including supply of all material labour T and P etc complete
2021_MDPEY_38156_1
5547/Nivida/520 dated 02.11.2021
Open Tender
Composite Works
540 days
Rawali Mehdood Block Bahadrabad
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Executive Engineer Construction Division UKPJN
₹26 L
Dehradun
3 Jul 2025
6 Nov 2021
23 Nov 2021
6 Nov 2021
20 Nov 2021
9 Nov 2021
8 Nov 2021
Amount
Rising Main -Supply carting, laying, Jointing of full length 150 mm DI K-9 pipes, including gaskets with testing of pipe line complete. Zone-1 and Zone 2
Supply of DI K-7 Pipe including laying jointing including supply of rubber gasket testing , commisioning completed, transportation, loading, unloading & stacking etc.
Zone-1 and Zone-2
Supply of HDPE pipe including laying jointing Field testing,commissioning complete at site of HDPE (pe100 grade compound)pipe as per IS 4984 and specifications for water application including all cost of material, labourrequired,transpotation,loading,unloading& stacking etc.
Zone- 1 and Zone- 2
Supply, carting and fixing in position of following CI D/F sluice / Gate valve for flow regulation & scouring including cost of valve specials, labour & T&Pcomplete.
C.I. D/F Sluice Valves Confirming to IS: 14846-2000 ( Kirloskar or equivalent) of Pressure PN 1.0
Zone- 1 and Zone- 2
Air valve 25 mm dia
Fire Hydrants
Excavation of pipe line in soil mixed with course sand, shingle, kankar, including refilling of trenches after laying of pipe line including watering ramming etc.
House Hold connection from main pipe line to House Boundary supply including all material etc complete. as per type design / Drawing provided by department and as per direction of engineer incharge.
Repairing of Existing Pipe Line Damaged during Excavation of Trenches including all material labour T&P etc. and as per Direction of Engineer Incharge.
Dismantling of following type of road surfaces for laying of pipe line including sorting out of serviceable materials and disposal of unserviceable materials.
Cement concrete road
Reinstatement of following type of road surfaces after laying of pipe line including supply of all material ,labour,T&P etc complete.
Cement concrete road
Constructing masonry Chamber 90x90x100 cm, inside with 75 class designation brick work in cement mortar 1:4(1 cement: 4 coarse sand) for sluice valve,with C.I. surface box 100x100x75 mm with hinge cover fixedin RCC slab 1:2:4 cement sand and 20mm grit necessary excavation foundation concrete 1:5:10 and inside plastering with cement mortar 1:3:12 mm chambers as per type design including supply of all materials labour t&p etc complete.
(i) Sluice valve/ wheel valve chamber(90X90X100)
(ii) Air valve chamber / Fire Hydrant chamber
(Over Head Tank) Supply of all materials, T&P etc.and construct an RCC over head tank of following size with RCC staircase & 1 m wide balcony, G.I. pipes railing consisting of 3 rows of 20 mm dia. G.I. pipe and angle iron posts around balcony & at the dome periphery, M.S. ladder from balcony to top of tank and inside the tank, supply and fixing M.H. cover with locking device, 1.2m dia ventilator, lightening conductor, water level indicator, supply and fixing of pipes, CI D/F pines, supply and fixing M.S. clamps with RCC column 40mm PCC 1:2:4 over 80 mm PCC 1:4:8 in apron, 150 mm semicircular drain around the tank, escape channel of 20 m length, box type enclosure at the entrance of the staircase having locking arrangements, two coats of apex paint and testing of tank for water tightness and also including cost of supply and fixing of all necessary pipes and valves etc. all complete with inlet, outlet, overflow and washout pipes with bypass arrangement and necessary fittings and specials and testing of bearing capacity.
18 m staging (800 KL) Zone-1
18 m staging (1950 KL) Zone-2
Construction of Pump House cum staff Quarters including and its all Apprutment work including all material Labour T&P etc complete as per drawing provided by deptt. and as per Direction of Engineer Incharge. Zone-1
Construction of Pump House and its all Apprutment work including all material Labour T&P etc complete as per drawing provided by deptt. and as per Direction of Engineer Incharge. Zone-2
Construction of boundary wall around water works compound for each zone as per type design / Drawing provided by department and as per direction of engineer incharge.
Fixing of 3.6m wide M.S. gate with wicket gate including fabrication and supply of steel and construction of boundary pillars etc. all complete for each zone as per type design / Drawing provided by department and as per direction of engineer incharge..
Providing and laying 60 mm thick faciory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with line sand etc. All complete as per the direction of Engineer-in-charge.
Earth filling in water works compound
ZONE 1 TUBEWELL NO 1 Transportation of Rig Machine, Air Compressor, O P Unit and camp equipages, connected T&P and necessary material required for drilling up to site of work, including loading, unloading etc. complete.
Errection and leveling of rig machine and barricading at site of work `
Dismantling of rig machine and clearance of site after satisfactory completion of work
Drilling of borehole by Dual rotary/ DR/ DC-RC/Percussion Rig machine.
Drilling of 600 mm dia borehole from GL to required depth.
Preparing & lowering of tube well assembly starting from G.L to the required depth including cutting, welding as required at site complete with all T&P required.
Supply and lowering of 300 mm dia MSERW plain pipe, 7.9 mm thick as per IS code 4270
Supply and lowering of 300 mm dia MSERW slotted pipe, 7.9 mm thick as per IS code 4270
300 mm dia bail plug
300 mm dia MS tube-well cap
Supply & fixing of 300 mm dia M.S.D.I. housing clamp & girder set
Supply & shrouding of pea gravel in between bore & tube well assembly to the entire depth of tube well.
Development of TW by 350 PSI/1100 CFM Air compressor as below including Erection of compressor at site of work.
Running of compressor for development and testing of tube well.
Development of TW by suitable size of OP Unit as below including Erection of OP Unit and camp equipage at site of work.
Lowering of suitable size submersible pump motor set with column pipe and running of D.G. Set, running of OP Unit for development and yield test of tube well.
Geological survey of site
Chemical & bacteriological testing of water sample
Supply of submersible pump capable of delivering 1700 Lpm discharge at 55 mt. head with suitable electric motor to be operated on 415 volt (+\- 10% ), 3 phase,50 C\s AC supply with 5 Mtr. submersible cable.
Supply of spare pumping plant as above .
Smart electrical panel cum starter suitable for automation of 40 HP capacity .
Supply of 125 amp. 3 phase with neutral main switch with enclouser and HRC fuses.
Supply of submersible cable 1x3x25 sq.mm .
Supply of aluminum armored cable 70 sq.mm 3.5 core .
SUPPLY OF MAIN PIPING AND VALVE OF 150mm DIA HAVING FOLLOWING ITEM .
C class M S column pipe (confirming IS: 4270 or latest IS code) in 3 mt. length with interlocking arrangement (flanged/socketed) .
CI D\F PN-1.6 Sluice Valve with hand wheel .
CI D\F PN-1.6 Reflux Valve .
MS D\F pipe of 1.5 Mt. length- 2 Nos, MS D/F pipe of 1.0 Mt. length-1 No., Ventury - 1 No, Tee-1 No, CI D\F bend-2 Nos, TW Cap-1 No., Packing & nut bolt etc. - 1 Lot.
S/o 150 mm dia M.S.D.I. clamp set .
S/o Jointing material for wiring connection including lugs, thimble, insulation tapes etc.
S/o Pressure Gauges with control cock & fitting, nipple, pipe, elbow etc complete- 10Kg/Sq Cm.
Installation & testing of pumping plants and accessories.
SITC of dozing pump with all necessary connecting accessaries complete.
Testing of pumping plants at manufacture`s works.
Earthing with G.I Earth plate of 600mmx600mmx 6mm size including accessories and providing masonry enclosure with providing and fixing 25mmx5mm GI strip on surface or in recess for connections with charcoal, salt as required.
Supply of 3 ton capacity and 4.5 mt. lift chain pulley block .
Supply of rubber resistance insulated sheet 2M x 1M x 25mm thick .
Supply of three phase rolling contact servo voltage stabilizer 80 KVA capacity with input voltage range 300 to 480 with constant output of 415+/-1% complete in all respect ONAN Type.
Earthing with G.I Earth plate of 600mmx600mmx 6mm size including accessories and providing masonry enclosure with providing and fixing 25mmx5mm GI strip on surface or in recess for connections with charcoal, salt as required.
Installation, Testing & commissioning of Three phase servo voltage stabilizer.
Wiring for light point, fan point etc. with 1.5 sq mm FR PVC insulated copper conductor single core cable in surface PVC conduit with piano type switch, phenolic laminated sheet, suitable size GI box, with earth wire of 1.5 sq mm FR PVC insulated copper conductor single core cable etc as required.
Wiring for circuit/sub main along with earth wire with the following size of FR PVC insulated copper conductor single core cable in surface PVC conduit as required.
2x2.5 sq. mm + 1x2.5 sq. mm earth wire
2x4 sq. mm + 1x4 sq. mm earth wire
Supply and fixing of metal box of 180 rnmx100mmx160 mm deep on surface with suitable size phenolic laminated sheet cover in front including providing and fixing 6 pin 5/6 amp and 15x16 amp socket outlet and 15/16 amp piano type switch, connections, painting etc as required.
Supply and fixing of following way S.P.N. sheet steel, MCB DB, 240 V on surface complete with copper bus bar, neutral bus bar, earth bar, inter connections including earthing etc as required. (But without MCB/RCCB/Isolator)
6 Way double door ,
Supply and fixing of 5 A to 32 A, 240 V, 10 KA, C serious MCB suitable for inductive load of following pole in the existing MCB DB complete with connection, testing etc as required.
Supply and fixing of double pole, 240 V, isolator in the existing MCB DB complete with connection, testing etc as required.
Supply and fixing of 20 W LED tube light complete in all respect (Bajaj/Philips OR Equivalent make)
Supply in fixing of LED external lighting luminaries with mounting bracket etc. complete.
O & M of pumping plant for six months.
ZONE 2 TUBEWELL NO 2 Transportation of Rig Machine, Air Compressor, O P Unit and camp equipages, connected T&P and necessary material required for drilling up to site of work, including loading, unloading etc. complete.
Errection and leveling of rig machine and barricading at site of work `
Dismantling of rig machine and clearance of site after satisfactory completion of work
Drilling of borehole by Dual rotary/ DR/ DC-RC/Percussion Rig machine.
Drilling of 600 mm dia borehole from GL to required depth.
Preparing & lowering of tube well assembly starting from G.L to the required depth including cutting, welding as required at site complete with all T&P required.
Supply and lowering of 300 mm dia MSERW plain pipe, 7.9 mm thick as per IS code 4270
Supply and lowering of 300 mm dia MSERW slotted pipe, 7.9 mm thick as per IS code 4270
300 mm dia bail plug
300 mm dia MS tube-well cap
Supply & fixing of 300 mm dia M.S.D.I. housing clamp & girder set
Supply & shrouding of pea gravel in between bore & tube well assembly to the entire depth of tube well.
Development of TW by 350 PSI/1100 CFM Air compressor as below including Erection of compressor at site of work.
Running of compressor for development and testing of tube well.
Development of TW by suitable size of OP Unit as below including Erection of OP Unit and camp equipage at site of work.
Lowering of suitable size submersible pump motor set with column pipe and running of D.G. Set, running of OP Unit for development and yield test of tube well.
Geological survey of site
Chemical & bacteriological testing of water sample
Supply of submersible pump capable of delivering 1700 Lpm discharge at 55 mt. head with suitable electric motor to be operated on 415 volt (+\- 10% ), 3 phase,50 C\s AC supply with 5 Mtr. submersible cable.
Supply of spare pumping plant as above .
Smart electrical panel cum starter suitable for automation of 40 HP capacity .
Supply of 125 amp. 3 phase with neutral main switch with enclouser and HRC fuses.
Supply of submersible cable 1x3x25 sq.mm .
Supply of aluminum armored cable 70 sq.mm 3.5 core .
SUPPLY OF MAIN PIPING AND VALVE OF 150mm DIA HAVING FOLLOWING ITEM .
C class M S column pipe (confirming IS: 4270 or latest IS code) in 3 mt. length with interlocking arrangement (flanged/socketed) .
CI D\F PN-1.6 Sluice Valve with hand wheel .
CI D\F PN-1.6 Reflux Valve .
MS D\F pipe of 1.5 Mt. length- 2 Nos, MS D/F pipe of 1.0 Mt. length-1 No., Ventury - 1 No, Tee-1 No, CI D\F bend-2 Nos, TW Cap-1 No., Packing & nut bolt etc. - 1 Lot.
S/o 150 mm dia M.S.D.I. clamp set .
S/o Jointing material for wiring connection including lugs, thimble, insulation tapes etc.
S/o Pressure Gauges with control cock & fitting, nipple, pipe, elbow etc complete- 10Kg/Sq Cm.
Installation & testing of pumping plants and accessories.
SITC of dozing pump with all necessary connecting accessaries complete.
Testing of pumping plants at manufacture`s works.
Earthing with G.I Earth plate of 600mmx600mmx 6mm size including accessories and providing masonry enclosure with providing and fixing 25mmx5mm GI strip on surface or in recess for connections with charcoal, salt as required.
Supply of 3 ton capacity and 4.5 mt. lift chain pulley block .
Supply of rubber resistance insulated sheet 2M x 1M x 25mm thick .
Supply of three phase rolling contact servo voltage stabilizer 80 KVA capacity with input voltage range 300 to 480 with constant output of 415+/-1% complete in all respect ONAN Type.
Earthing with G.I Earth plate of 600mmx600mmx 6mm size including accessories and providing masonry enclosure with providing and fixing 25mmx5mm GI strip on surface or in recess for connections with charcoal, salt as required.
Installation, Testing & commissioning of Three phase servo voltage stabilizer.
Wiring for light point, fan point etc. with 1.5 sq mm FR PVC insulated copper conductor single core cable in surface PVC conduit with piano type switch, phenolic laminated sheet, suitable size GI box, with earth wire of 1.5 sq mm FR PVC insulated copper conductor single core cable etc as required.
Wiring for circuit/sub main along with earth wire with the following size of FR PVC insulated copper conductor single core cable in surface PVC conduit as required.
2x2.5 sq. mm + 1x2.5 sq. mm earth wire
2x4 sq. mm + 1x4 sq. mm earth wire
Supply and fixing of metal box of 180 rnmx100mmx160 mm deep on surface with suitable size phenolic laminated sheet cover in front including providing and fixing 6 pin 5/6 amp and 15x16 amp socket outlet and 15/16 amp piano type switch, connections, painting etc as required.
Supply and fixing of following way S.P.N. sheet steel, MCB DB, 240 V on surface complete with copper bus bar, neutral bus bar, earth bar, inter connections including earthing etc as required. (But without MCB/RCCB/Isolator)
6 Way double door ,
Supply and fixing of 5 A to 32 A, 240 V, 10 KA, C serious MCB suitable for inductive load of following pole in the existing MCB DB complete with connection, testing etc as required.
Supply and fixing of double pole, 240 V, isolator in the existing MCB DB complete with connection, testing etc as required.
Supply and fixing of 20 W LED tube light complete in all respect (Bajaj/Philips OR Equivalent make)
Supply in fixing of LED external lighting luminaries with mounting bracket etc. complete.
O & M of pumping plant for six months.
S. M. Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf