| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAdmitted-Fee/PreQual/Technical/Finance POTTAKKAL PADAM HOUSE METTUPALAYAM THATTAMANGALAM | METTUPALAYAM | KERALA | ₹24.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹25.6 LAdmitted-Fee/PreQual/Technical/Finance AVANAKKATT HOUSE KALADI P O MALAPPURAM KERALA 679582 | MALAPPURAM | MALAPPURAM | KERALA | 679582 | ₹25.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹25.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹25.8 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹26.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹26.2 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹26.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹26.6 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MOHANDAS C L7 | GIRIDAS K S L4 | VINOD V L1 | jamaludheen va L5 | RIJIN A L2 | V.P.JOJI L3 | UNNI L J L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00App I Cost of Materials | ||||||||||
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 712.8 | cum | 578 ₹4,11,998.4 | 400 ₹2,85,120 Lowest | 500 ₹3,56,400 | 540 ₹3,84,912 | 528 ₹3,76,358.4 | 450 ₹3,20,760 | 440 ₹3,13,632 |
| 1.00 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 79.2 | cum | 900.36 ₹71,308.51 | 600 ₹47,520 | 650 ₹51,480 | 540 ₹42,768 Lowest | 780 ₹61,776 | 600 ₹47,520 | 810 ₹64,152 |
| 1.00 | 100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes. | 1,584 | metre | 74 ₹1,17,216 | 65 ₹1,02,960 | 40 ₹63,360 Lowest | 60 ₹95,040 | 81 ₹1,28,304 | 75 ₹1,18,800 | 75 ₹1,18,800 |
| 1.00 | 100.98.212:Supply of PVC Pipe, 6kg/cm2, 75mm Dia. | 1,584 | metre | 100.41 ₹1,59,049.44 | 120 ₹1,90,080 | 90 ₹1,42,560 | 110 ₹1,74,240 | 78 ₹1,23,552 Lowest | 110 ₹1,74,240 | 99 ₹1,56,816 |
| 1.00 | OD61705/2026-2027:Supply of 75mm PVC Specials Class : 3 | 1,584 | metre | 3.01 ₹4,767.84 | 3.01 ₹4,767.84 | 2 ₹3,168 Lowest | 6 ₹9,504 | 2.3 ₹3,643.2 | 2 ₹3,168 Lowest | 3.01 ₹4,767.84 |
| 1.01 | 18.12.7:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work65 mm dia nominal bore | 2,340 | metre | 850 ₹19,89,000 | 800 ₹18,72,000 | 763 ₹17,85,420 | 800 ₹18,72,000 | 751 ₹17,57,340 Lowest | 780 ₹18,25,200 | 860 ₹20,12,400 |
| 1.01 | OD52961/2026-2027:Linking charges towards linking existing 110/90/75mm PVC or 100/80/65mm GI Line to newly laid 65mm GI pipeline including all other necessary specials and labour charges etc complete. | 18 | no | 1,800 ₹32,400 | 2,000 ₹36,000 | 1,500 ₹27,000 | 800 ₹14,400 Lowest | 1,643 ₹29,574 | 1,500 ₹27,000 | 1,900 ₹34,200 |
| 1.01 | OD52960/2026-2027:Linking charges towards linking existing 90mm PVC to newly laid 75mm PVC pipeline including all other necessary specials and labour charges etc complete. | 12 | no | 1,800 ₹21,600 | 2,000 ₹24,000 | 1,500 ₹18,000 | 800 ₹9,600 Lowest | 1,615 ₹19,380 | 1,500 ₹18,000 | 1,900 ₹22,800 |
| 1.01 | 18.17.5:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :65 mm nominal bore | 7 | each | 1,600 ₹11,200 | 1,800 ₹12,600 | 1,500 ₹10,500 | 3,000 ₹21,000 | 1,457 ₹10,199 Lowest | 1,600 ₹11,200 | 1,700 ₹11,900 |
Tender Value
₹32.8 L
EMD Value
₹50,000
Closing Date
21 Jul 2026, 3:00 pmClosed
Executive Engineer
EE,PH DIVISION OFFICE, KALMANDAPAM ,PALAKKAD
DEPOSIT-Deposit work in Elapully Grama Panchayath-Pipe line extension at various places in Elapully Grama Panchayath-General Civil Work
2026_KWA_860246_1
22/2026-2027/EE/PH/PKD
Open Tender
Civil Works - Water Works
Item Rate
360 days
Elapully
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
22 Jul 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
13 Jul 2026 - 20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1App I Cost of Materials | |||||
| 1.001 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1 | cum | - | - |
| 1.002 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | - | cum | - | - |
| 1.003 | 100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes. | - | metre | - | - |
| 1.004 | 100.98.212:Supply of PVC Pipe, 6kg/cm2, 75mm Dia. | - | metre | - | - |
| 1.005 | OD61705/2026-2027:Supply of 75mm PVC Specials Class : 3 | - | metre | - | - |
| 1.006 | 18.12.7:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work65 mm dia nominal bore | - | metre | - | - |
| 1.007 | OD52961/2026-2027:Linking charges towards linking existing 110/90/75mm PVC or 100/80/65mm GI Line to newly laid 65mm GI pipeline including all other necessary specials and labour charges etc complete. | - | no | - | - |
| 1.008 | OD52960/2026-2027:Linking charges towards linking existing 90mm PVC to newly laid 75mm PVC pipeline including all other necessary specials and labour charges etc complete. | - | no | - | - |
| 1.009 | 18.17.5:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :65 mm nominal bore | - | each | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
viewsbd22.pdf
Other Document • 1.64 MB
Specialconditions.pdf
Other Document • 0.51 MB
viewnit.pdf
Tender Documents • 0.04 MB
BOQ_1454717.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].