Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC As per financial comparative statement and Final L1 | |
| 2 | L2₹2.0 L+₹12,825 (6.89%)Rejected-AOC | L2 | Rejected-AOC As per financial comparative statement | |
| 3 | L3₹2.3 L+₹43,812 (23.5%)Rejected-AOC | L3 | Rejected-AOC As per financial comparative statement |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
25 Mar 2020, 3:00 pmClosed
S K Mukhopadhyay
ERLDC, 14 Golf Club Road Tollygunge Kolkata 700033
NIT for Engagement of Civil Consultant for reconstruction of Drainage system and boundary wall along with concertina wire fencing at ERLDC, POSOCO
2020_POSOC_548067_1
ERLDC/CnM/1193/BWall Drain Consultant /2020/
Limited
Consultancy
Lump-sum
180 days
ERLDC POSOCO
As per QR in NIT
3 documents required · 3 mandatory
₹0
₹4,800
Yes
29 Jul 2020
27 Feb 2020
26 Mar 2020
27 Feb 2020
25 Mar 2020
28 Feb 2020
28 Feb 2020 - 13 Mar 2020
Amount
Consultancy charges for renovation of drainage system
Mobilization of Survey Instrument and Manpower for Conducting of Topographical survey with the (Total Station), visual inspection survey and preparation of site plan which covers the existing drainage system and cable trench layout system including taking of the existing level of drains, inspection pits and cable trenches at ERLDC. POSOCO.
Preparation and submission of drawing showing the water flow diagram, sewerage line, different section and plans of inspection pit, drain and making of structural design as per IS 456:2000 & the relevant estimate as per PWD schedule 2017 for re-construction of drainage system at ERLDC. POSOCO.
Verification of the Technical documents of the NIT and BOQ / Bidding schedule – for completeness of the documentation requirement along with QR, Test Certification to be submitted etc.
Technical support towards evaluation of Bid, verification of deviations and commercial implication thereof.
Supervision and quality management of job at the time of execution and certification for compliance with technical design & requirement. Making of a weekly report and checking of Bills against the completion of work.
Verification of quantity and conformity to Technical specification of the entire execution and certification for Taken Over.
Consultancy charges for reconstruction of boundary wall
Preparation and submission of drawing showing the section and plans of boundary wall approx. length(140.0 meter) and making of structural design as per IS 456:2000 & the relevant estimate as per PWD schedule 2017 for re-construction of drainage system at ERLDC. POSOCO.
Verification of the Technical documents of the NIT and BOQ / Bidding schedule – for completeness of the documentation requirement along with QR, Test Certification to be submitted etc.
Technical support towards evaluation of Bid, verification of deviations and commercial implication thereof.
Supervision and quality management of job at the time of execution and certification for compliance with technical design & requirement and checking of Bills against the completion of work.
Verification of quantity and conformity to Technical specification of the entire execution and certification for Taken Over.
Pace Consultants
SSK AND ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .