Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24,000Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24,900+₹900 (3.75%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹28,600+₹4,600 (19.2%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹31,450+₹7,450 (31.0%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹34,000+₹10,000 (41.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI RAJARAJESWARI ENTERPRISES L8 | DEVI STRUCTURALS L2 | GKFAB WORK L1 | KALIN ENGINEERING INDUSTRIES L3 | OPALMETALLICS L7 | JJ FABRICATORS L4 | Divya Enco L9 | SRI ENGINEERING INDUSTRIES L6 | VISHNU ENGINEERING COMPANY L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | R&M DUCT ASSEMBLY ONVOLVING FULL STIFFENER WELDING | 277 | MT | 59,000 ₹59,000 | 24,900 ₹24,900 | 24,000 ₹24,000 Lowest | 28,600 ₹28,600 | 39,500 ₹39,500 | 31,450 ₹31,450 | 72,000 ₹72,000 | 35,000 ₹35,000 | 34,000 ₹34,000 |
Tender Value
Refer Docs
Closing Date
26 Mar 2026, 11:00 amClosed
DINESHKUMAR T
OS CONTRACTS, BHEL TRICHY
RATE CONTRACT FOR FABRICATION OF RM DUCT ASSEMBLY WITH FULL STIFFERENER WELDING THROUGH OSB
2026_BHEL_59461_1
2025OSB076
Limited
Miscellaneous Goods
Supply
90 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
28 Mar 2026
18 Mar 2026
26 Mar 2026
18 Mar 2026
26 Mar 2026
18 Mar 2026
Select, Excess (+), Less (-)
Tender Inviting Authority: Dinesh kumar T - Engineer , Contracts, Outsourcing Department- BHEL Trichy-620014
Name of Work: Rate contract finalization for Fabrication and supply of RM Duct Assembly with full stiffener welding with BHEL’s Material through OSB
Enquiry No: 2025OSB076
Name of the Bidder/ Bidding Firm / Company :
SL. No. Rate Schedule Description Rate Schedule Quantity (UoM) Unit of Measurement (UoM) Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR Quoted RATE In Rs. per UoM [In Figures] (Exclusive of GST) (To be entered by the Bidder) Excise Duty in Rs. P GST in Rs. P Freight Charges ( Unloading & Stacking) in Rs. P Any Other Taxes/Duties/Levies in Rs. P Other Taxes 2 in Rs. P IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax in Rs. P Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category in Rs. P
1 R&M DUCT ASSEMBLY ONVOLVING FULL STIFFENER WELDING RS01 MT Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select %
Quoted Rate in Words
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
TenderDoc.rar
Tender Documents • 3.83 MB
BOQ_64357.xls
BOQ • 0.26 MB
Drawings.rar
Additional Documents • 12.77 MB
QualityDoc.rar
Additional Documents • 6.19 MB
AnnexA.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .