Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.8 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹22.0 L+₹16,749 (0.77%)Rejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171002 | 2 | Rejected-Finance 2 | |
| 3 | 3₹22.5 L+₹70,103 (3.21%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | Not Admitted-Fee/PreQual/Technical R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹16.5 L
EMD Value
₹32,315
Closing Date
7 Aug 2023, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
AR and MO LWSS Khui Meathi in Tehsil Sadar District Bilaspur (SH Outsourcing of operation for pumping machinery for water supply scheme from sector storage tank to different habitations for one year).
2023_HPIPH_76707_1
BLP-BLP-00736-NIT No. 10104-203 dated 22/07/2023
Open Tender
Civil Works
Item Rate
365 days
Sub Division Jukhala Section Jamli
Please refer Tender documents.
8 documents required · 8 mandatory
₹400
Yes
₹32,315
Yes
15 Dec 2023
26 Jul 2023
7 Aug 2023
26 Jul 2023
7 Aug 2023
26 Jul 2023
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Khui Meathi whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 2 Nos pump house, storage tank 3 Nos, Sub stroage tank=23 Nos Rising main: Boost stage: 125mm dia=58 Rmt, 1st stage: 125mm dia=930 Rmt, 2nd stage 125mm dia 1090Rmt. Distribution system: 15mm dia to 65mm dia =213000Rmt. Pumping machinery:Booster stage:2x10=20 HP, 1st stage: 2x125=250HP, 2nd stge: 125x2=250 HP. No of main storage tanks: 3 Nos, Total working hours 102 per day : through , 13 Nos perons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 570850 ). Pumping hours per day ( 12 to14 ) and energy consumptoin per day Unit.
Shyam Lal
Parkash Chand Sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .