Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.9 CrAccepted-AOC | ₹40.9 Cr | L1 | Accepted-AOC Responsive |
| 2 | L2₹41.0 CrRejected-Finance | ₹41.0 Cr | L2 | Rejected-Finance Responsive |
| 3 | L3₹41.1 CrRejected-Finance 35 WARD NO 02 ISLAMNAGAR DISTT BUDAUN | BUDAUN | UTTAR PRADESH | 110025 | ₹41.1 Cr | L3 | Rejected-Finance Responsive |
Tender Value
₹32.3 Cr
EMD Value
₹64.6 L
Closing Date
21 Mar 2025, 3:00 pmClosed
SE Rampur Circle PWD Rampur
Office of SE Rampur Circle PWD Rampur
New construction of Moradabad Haridwar road (SH-49) km 55 to NH-734 via Nehar Patri bypass road (ODR) (Including 05 years maintenance)
2025_CEMBD_1017067_2
6340/E-Nivida-R.Circle/23-24 Dt. 11.12.2024
Open Tender
Civil Works - Roads
455 days
Office of SE Rampur Circle PWD Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹64.6 L
Office of SE Rampur Circle PWD Rampur
19 May 2025
12 Mar 2025
21 Mar 2025
12 Mar 2025
21 Mar 2025
12 Mar 2025
13 Mar 2025
Amount
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per Morth Specification clause 401 (4.1A). Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Morth Specification clause 406 (4.14B). Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. grade-I. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. grade-II. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per Morth Specification clause 503 (5.2(i) For BC. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 (5.5 B) complete in all respects. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Morth Specification Clause 305 (3.18). Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.. Ch-9.01,304. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Sand Filling in Foundation Trenches as per Drawing & Technical Specification Ch-12.3, 304. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Plain/Reinforced Cement Concrete M-15 in Open Foundation complete as per Drawing and Technical Specifications.Clause 9.14, 1500, 1700 & 2100. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
RCC Grade M25 in Foundation Plain/Reinforced Cement Concrete, in Foundation complete as per Drawing and Technical Specification. Clause 9.14 E Case II. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
RCC Grade M25 in Super structure Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications.Clause 9.15,B 1500, 1700 & 2100. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
HYSD in Foundation Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. Clauses 9.16, 1600. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications Clause 9.17, 2706 & 2200. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.Clause 15.1, 2503. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Clause 1502,.2503. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Clause 15.5, 2504. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Clause 15.4, 2504. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Cement concrete with 4 cm gauge approved stone aggregate, coarse sand and cement in proportion 6:3:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. S.I. 279 (a). Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
M-150 class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (S.I. No. 307). Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Struck pointing with cement mortar consisting of 1 part cement and 2 part of fine sand of 1.25 finess modulus on brick work including supply of all materials, labour and T&P etc. required for proper completion of work. (SI. No. 574). Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
12 mm thick plaster with 1 part of cement and 3 part ofcoarse sand over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. (SI. No. 584). Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M20 using batching plant transit mixer & manual placing. Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Laying Reinforced cement concrete pipe 1000 mm dia NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . Including Cost of all material, labour, T&P, Labour Cess, all taxes but excluding cost of GST.
Routine Maintenance of road after completion work (A) Carriageway/Pavement: (a) Potholes,cracks,other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC). (B) Road, Embankment, Cuttings, Shoulders, Trees & Plantation: (a) Roads Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficient slopes, rain cuts in embankments (E/W), (c) Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/disturbed boulder pitching, breast /toe wall retaining wall, apron flooring , guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-structures, (f) Any defects in superstructures, raillings, parapets., (g) wearing coat, (h) Approach slab, (i) Painting & lettering of No. plates, repairs. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC-1:2:4. (E) Road Furniture: (a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stones & sign boards., (b) 200 m stones, (c) Km stones, (d) 5th km stones,. Maintenance requirement as per above and Mentioned in Special Conditions of Contract for Maintenance. Payment of Maintenance work as Percentage of final Civil Construction Cost. For Ist Year @ 0.00 %
For Ist Year @ 0.00 %
For IInd Year @ 0.25 %
For IIIrd Year @ 0.50 %
For IVth Year @ 0.75 %
For Vth Year @ 1.00 %
Raj Shyama Constructions Pvt. Ltd. (BID ID -5050434)
M/S A B INFRAZONE PRIVATE LIMITED (BID ID -5053956)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid