CONSTRUCTION OF BREAST WALL AT SHAMSHAN GHAT CHANDOOSA SIKHPATI BARAMULLA
2023_SWCD_220981_2
e- NIT No. 06 of 2023-24
Open Tender
Civil Works
Item Rate
210 days
Chandoosa
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
District Soil Conservation Officer Division Bla
₹21,000
Yes
9 Aug 2023
1 Aug 2023
8 Aug 2023
1 Aug 2023
7 Aug 2023
1 Aug 2023
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil : 1m from cutting edge 1x50’-0”x 2’-6”x2’-0”= 250 cft 1x 100’-0”x 3’-6”x 3’-0” = 1050 cft Drain = 150’-0’x3’-0”x2’-0”= 900 cft T= 2200cft or 62.3 cum
Providing and laying soling stones in horizontal including ramming , watering & cost of stones complete 1x50’-0’x 2’-6”x 6”= 62.5 cft 1x100’-0’x 3’-6”x6”= 175cft Drain = 150’-0’x3’-0”x6”= 225cft t= 462.5 cft or 13.09 cum B/wall= 100’-0”x (4’-0”+1’-0”) x 10’-0”= 2500cft or 70.8 cum T= 83.89cum
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Qtty vide (2) = 85.96 sqm x 0.10m = 8.59 cum
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level with 1:3:6 (1 cement : 3 coarse sand : graded stone aggregate 40 mm nominal size) using vibertors 50’-0”x (1-3”’+2’-0”)x (4’-0”+8’-0”) = 487.5cft 2 2 100’-0”x(1’-3”+3’-0”) x (15’-0”+8’-0”) = 2762.5cft 2 2 Drain= 2x150’x 1’-6”x1’-0”= 450cft bed = 150’-0” x 1’-0”x4” = 49.5 cft T = 3749.5cft or 106.18cum
Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. 1x 50’-0”x(4’-0”+8’-0”) = 300sft 2 1x100’-0”x (8’-0”+15’-0”) = 1150sft 2 Drain = 2x 150’x1’-6”= 450sft T = 1900 sft or 176.57 sqm
Carriage of different materials from source to site of work a) Sand average 22 KM by MT & 300m by HL Qtty vide (3,4,6)= 51.64cum
b) Stone aggregate average 22 Km by MT & 300m by HL Qtty vide (3,4)= 103.29 cum
c) Cement average 22Km by MT & 300m by HL Qtty vide (3,4,6)= 24.81 MT
d) Stone average 22 KM by MT & 300m by HL Qtty vide (2) = 83.89 cum
MOHAMMAD ABBAS KHAN
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .