| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.0 Laccepted-aoc | ₹6.0 L | accepted-aoc |
Tender Value
₹8.1 L
EMD Value
₹8,077
Closing Date
25 Feb 2026, 4:30 pmClosed
Commissioner, MCT
Tilak Road Tirupati
Laying of CC Road, Drain and UDS from D.No. 17-1-35 and 17-1-108 to 17-1-10/1 and 16-1-169 and 16-1-179 Arava Palli Veedhi in Ward no. 25.
897306
404/TPT/25-26/GEN/TO, Dt. 09-02-2025
OPEN - NCB
Civil Engineering Works
TIRUPATHI
7 documents required · 6 mandatory · 1 optional
₹286
₹8,077
12 Mar 2026
11 Feb 2026
11 Feb 2026
Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, unloading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable.I.S.I Mark HD-35 With 560mm Dia Clear Opening
Raising of existing Manholes to Present Road level with CC (1:2:4) mix using 20mm HBG down graded metal including removing of low level manhole, raising to present road level with CC, fixing of SFRC frame and cover, labour charges for curing etc..complete
BLD-CSTN-12-1 Demolishing and disposal of unserceable materails within 100 Mts lead for Brick Walls
BLD-CSTN-12-1 Demolishing and disposal of unserceable materails within 100 Mts leadFor unreinfoced cement concrte Morethan 15 cm thickness
Providing Plain cement concrete 1:4:8 using 40 mm metal with hand mixing upto plinth level as approved by the department including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars and construction joints, plasticizer to attain proper workability as per IS 9103/99 & as approved, curing of concrete slabs for 14- days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. item RBR-CCPV-5 of standard data.
Cutting open CC road surface including labour charges, all leads, lifts and conveyance of all materials etc., complete as directed by the departmental officers for pipeline trenches.
Earthwork excavation by Manual means and depositing on the bank in all types of soils like black cotton soil, red earth and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock, hard disintegrated rock, Conglomerated rock, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures, existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas including diversion of the traffic, removal of stumps and other deleterious material and disposal upto a lead of 1000 m, dressing of sides and bottom and excluding backfilling for pipeline trenches including all incidental and operational charges etc.,complete.
Providing bedding with sand for pipelines wherever rocky and necessary areas as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge (as per SSR 14-15- Amendment)
Providing Plain cement concrete M15 grade nominal mix (1:2.:4) as approved by the department using 20 mm graded hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge (concrete machine mixing) Drain Bed
Providing Plain cement concrete M15 grade nominal mix (1:2.:4) as approved by the department using 20 mm graded hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge (concrete machine mixing) Drain walls
(BLD-CSTN 6-1) Plastering with CM (1:3) prop., 12 mm thick, with sponge finishing including cost and conveyance of all materials to site, tools and plants, labour charges, leads, lifts, curing, scaffolding and all other incidental and operational charges etc., complete for finished item of work
Cutting open CC road surface including labour charges, all leads, lifts and conveyance of all materials etc., complete as directed by the departmental officers for pipeline trenches.
Manufacture, supply, & delivery of (DWC) structured wall polyethylene/polypropylene piping system with nonsmooth external annular corrugated and smooth internal surface (Double Wall) for nonpressure sewage & Drainage application pipes of standard length 6 m, grade conforming to IS 16098 (part-II: 2013) including transportation to anywhere in A.P, excluding all taxes. 150 mm dia (8") SP-2 Class
Manufacture, supply, & delivery of fittings & accessories compatible with DWC pipe - non smooth External Annular Corrugated and smooth Internal Surfaces (Double Wall) for non-pressure or similar type of class SN8 Structured Wall polythelene piping systems including transportation to anywhere in A.P, excluding GST and other Government duties. (a) Coupler 150mm
Manufacture, supply, & delivery of fittings & accessories compatible with DWC pipe - non smooth External Annular Corrugated and smooth Internal Surfaces (Double Wall) for non-pressure or similar type of class SN8 Structured Wall polythelene piping systems including transportation to anywhere in A.P, excluding GST and other Government duties. (a) (b) Sealing Ring 150mm
Earthwork excavation by Manual means and depositing on the bank in all types of soils like black cotton soil, red earth and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock, hard disintegrated rock, Conglomerated rock, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures, existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas including diversion of the traffic, removal of stumps and other deleterious material and disposal upto a lead of 1000 m, dressing of sides and bottom and excluding backfilling for pipeline trenches including all incidental and operational charges etc.,complete
Providing bedding with sand for necessary areas as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge (as per SSR 14-15- Amendment)
Laying of SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge. (Payment to be made on the basis of actual finished length of pipe line). for 150mm dia Pipeline
Carting away the surplus excavated material i.e., Rock from the site to a suitable distance of about 5 kms including loading, unloading, conveyance, labour charges, all leads and lifts and other incidental and operational charges etc., complete.
Carting away the surplus excavated material i.e., earth from the site to a suitable distance of about 5 kms including loading, unloading, conveyance, labour charges, all leads and lifts and other incidental and operational charges etc., complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ No 404-25-26.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .