Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹8.4 Cr
Closing Date
20 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Contracts & Procurement
Solar Energy Corporation of India Limited, 6th Floor, Plate-B, NBCC Office Block Tower-2, East Kidwai Nagar, New Delhi - 110023
Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and Maintenance of 45.6 MW ISTS Connected Wind Power Project at Ramagiri, Sri Sathya Sai District, Andhra Pradesh (Packge-2: Wind)
SECI-2026-TN000017
SECI/C&P/OP/11/0003/26-27
Open
Services
Single Stage Two Envelope followed by e-ReverseAuction
New Delhi
₹25,000
Buyer organization (processing fee)
₹8.4 Cr
Solar Energy Corporation of India Limited, 6th Floor, Plate-B, NBCC Office Block Tower-2, East Kidwai Nagar, New Delhi - 110023
16 Jul 2026
16 Jul 2026
25 Nov 2026
16 Jul 2026
20 Nov 2026
27 Jul 2026
3 Aug 2026
The payment of GST by the Employer shall only be at the CEILING of GST as mentioned by the Bidder in the Schedule No 1 at the time of bidding. Bidders are required to quote the applicable GST with due diligence & appropriate financial prudence, as afterwards bidders will not be able to change or claim the GST charges already quoted during the bid.
Bidders are required to fill the relevant portion/Parts/Line items/scope of the respective Price Schedules only. In case, any line item is left blank by the bidder, it will be deemed assumed by the Employer that such portion/Parts/line item/Scope has been considered by the bidder suitably somewhere else in the Price schedules.
In case the bidder don't want to mention any quantity/price in any particular line item, then he has to put zero (0) against that particular line item.
Description of Item
Total Charges (INR)
The payment of GST/Taxation by the Employer shall only be at the CEILING of GST/Taxation as mentioned by the Bidder in the Schedule No 2 at the time of bidding. Bidders are required to quote the applicable GST/Taxation with due diligence & appropriate financial prudence, as afterwards bidders will not be able to change or claim the GST charges already quoted during the bid.
Bidders are required to fill the relevant portion/Parts/Line items/scope of the respective Price Schedules only. In case, any line item is left blank by the bidder, it will be deemed assumed by the Employer that such portion/Parts/line item/Scope has been considered by the bidder suitably somewhere else in the Price schedules..
In case the bidder don't want to mention any quantity/price in any particular line item, then he has to mandatorily put zero (0) against that particular line item.
Description of Item
Total value of Applicable GST (in figures)
Operation and Maintenance of the Solar PV Project with BESS for FIRST YEAR
Operation and Maintenance of the Solar PV Project with BESS for SECOND YEAR
Operation and Maintenance of the Solar PV Project with BESS for THIRD YEAR
Operation and Maintenance of the Solar PV Project with BESS for FOURTH YEAR
Operation and Maintenance of the Solar PV Project with BESS for FIFTH YEAR
Operation and Maintenance of the Solar PV Project with BESS for SIXTH YEAR
Operation and Maintenance of the Solar PV Project with BESS for SEVENTH YEAR
Operation and Maintenance of the Solar PV Project with BESS for EIGHT YEAR
Operation and Maintenance of the Solar PV Project with BESS for NINTH YEAR
Operation and Maintenance of the Solar PV Project with BESS for TENTH YEAR
The payment of GST/Taxation by the Employer shall only be at the CEILING of GST/Taxation as mentioned by the Bidder in the Schedule No 3 at the time of bidding. Bidders are required to quote the applicable GST/Taxation with due diligence & appropriate financial prudence, as afterwards bidders will not be able to change or claim the GST charges already quoted during the bid.
Bidders are required to fill the relevant portion/Parts/Line items/scope of the respective Price Schedules only. In case, any line item is left blank by the bidder, it will be deemed assumed by the Employer that such portion/Parts/line item/Scope has been considered by the bidder suitably somewhere else in the Price schedules..
In case the bidder don't want to mention any quantity/price in any particular line item, then he has to mandatorily put zero (0) against that particular line item.
Bidders are required to mention the GST amount ( Column I) on the actual O&M cost of the yearly basis & not on the NPV of O&M cost.
O & M Charges on YoY basis must be in equal or in ascending order only.
Dated:
Documents
Dated: 10.09.2026
Documents
Technical package - 2: Sub-Section C: General Annexure E: Page No.: 89
Technical package - 2: Sub-Section C: General Annexure E: Page No.: 89
Technical package - 2: Sub-Section C: General Annexure E: Page No.: 89
Technical package - 2: Sub-Section C: General Annexure E: Page No.: 90
Technical package - 2: Sub-Section C: General Annexure E: Page No.: 90
Technical package - 2: Sub-Section C: General Annexure E: Page No.: 90
Technical package - 2: Sub-Section C: General Annexure E: Page No.: 91
Technical package - 2: Sub-Section C: General Annexure E: Page No.: 91
Technical Package 2: Page No.: 4
Technical Package 2
Technical Package 2
Technical Package 2
Technical Package 2
Technical Package 2
Technical Package 2
Section-VII, Sub-Section B (TS-Electrical) - Technical
Technical Package 2
Technical Package 2
Technical_package-2
Technical_package-2
Technical_package-2
Section VII – Scope of Work
Section VII – Scope of Work
Technical Pacakage-2 2. Project particulars
Technical Package 2: Page:52
Section-VII, Sub-Section F (O&M Agreement) - Technical: Page: 162
Section-VII, Sub-Section B (TS-Electrical) - Technical: Page: 58
Section-VII, Sub-Section B (TS-Electrical) - Technical: Page: 31
Section-VII, Sub-Section B (TS-Electrical) - Technical: Page: 32
Section-VII, Sub-Section D / GA-E (Plant Commissioning & PG Test Procedure) - Technical: Page: 92
Section-VII, Sub-Section D / GA-E (Plant Commissioning & PG Test Procedure) - Technical: Page: 93
Section-VII, Sub-Section D / GA-E (Plant Commissioning & PG Test Procedure) - Technical: Page: 94
Technical Package 2: Page: 163
Technical Package 2: Page: 54
Technical Package 2: Page: 82
Sub section F, O&M Agreement, Section VII: Page: 152
Sub section F, O&M Agreement, Section VII: Page: 154
Sub section C, Plant Documentation, Commissioning and Test Procedure, Section VII: Page: 91
Sub section C, Plant Documentation, Commissioning and Test Procedure, Section VII: Page: 92
Sub section C, Plant Documentation, Commissioning and Test Procedure, Section VII: Page: 94
Section VII, Sub section F: Page: 162
Section VII, Sub section F: Page: 162
Technical Package-2
Technical Package-2
Technical Package-2: Page: 56
Technical Package-2
Technical Package-2
Technical Package-2
02_Technical_package-2
Technical Package-2
Technical Package-2
Technical Package-2
Technical Package-2
Technical Package-2
Technical Package-2
Technical Package-2
Technical Package-2
Technical Package-2
Technical package
Technical package
Technical package
Technical package
Technical Package-2: Wind
Sec. -VII / Sub-Sec. A: Scope of Works / Page 4 of 19
Sec. -VII /Sub Sec. – D Specific Annex. (SA): Page: 125
Sec. -VII / Sub-Sec. A: Scope of Works / Page 4 of 19: Page: 8
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 23 of 45: Page: 46
Sec. -VII /Sub Sec. – D Specific Annex. (SA): Page: 124
Sec. -VII / Sub-Sec. A: Scope of Works / Page 5 of 19: Page: 9
Sec. -VII / Sub-Sec. A: Scope of Works / Page 5 of 19: Page: 9
Sec. -VII / Sub-Sec. A: Scope of Works / Page 5 of 19: Page: 9
Sec. -VII / Sub-Sec. A: Scope of Works / Page 4 of 19: Page: 8
Sec. -VII / Sub-Sec. A: Scope of Works / Page 5 & 6 of 19: Page: 9
Sec. -VII / Sub-Sec. A: Scope of Works / Page 6 of 19: Page: 10
Sec. -VII / Sub-Sec. A: Scope of Works / Page 6 & 7 of 19: Page: 10
Sec. -VII / Sub-Sec. A: Scope of Works / Page 11 of 19: Page: 15
Sec. -VII / Sub-Sec. A: Scope of Works / Page 12 of 19: Page: 16
Sec. -VII / Sub-Sec. A: Scope of Works / Page 13 of 19: Page: 17
Sec. -VII / Sub-Sec. A: Scope of Works / Page 13 of 19: Page: 17
Sec. -VII / Sub-Sec. A: Scope of Works / Page 13 of 19: Page: 17
Sec. -VII / Sub-Sec. A: Scope of Works / Page 14 of 19: Page: 18
Sec. -VII / Sub-Sec. A: Scope of Works / Page 16 of 19: Page: 20
Sec. -VII / Sub-Sec. A: Scope of Works / Page 17 of 19: Page: 21
Sec. -VII / Sub-Sec. A: Scope of Works / Page 18 of 19: Page: 22
Sec. -VII / Sub-Sec. A: Scope of Works / Page 18 of 19: Pgae: 22
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 8 of 45: Page: 31
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 8 of 45: Page: 31
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 14 of 45: Page: 37
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 18 & 19 of 45: Page: 14
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 21 & 22 of 45: Page: 44
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 22 of 45: Page: 45
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 27 of 45: Page: 50
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 29 & 30 of 45: Page: 52
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 31 & 32 of 45: Page: 54
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 33 of 45: Page: 56
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 35 of 45: Page: 59
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 36 of 45: Page: 59
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 36 & 37 of 45
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 37 of 45
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 39 of 45
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 39 of 45: Page: 62
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 41 of 45: Page: 62
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 41 to 43 of 45: Page: 66
Sec. -VII / Sub-Sec. B: TS-Electrical / Page 43 to 44 of 45: Page: 67
Sec. -VII / Sub-Sec. C: General Annex. D: Mandatory Spares / Page 2 of 4: Page: 82
Sec. -VII / Sub-Sec. C: General Annex. D: Mandatory Spares / Page 2 of 4: Page: 82
Sec. -VII / Sub-Sec. C: General Annex. D: Mandatory Spares / Page 2 & 3 of 4: Page: 82
Sec. -VII / Sub-Sec. C: General Annex. E: Plant Documentation, Commissioning and Test Procedure / Page 3 & 4 of 11: Page: 86
Sec. -VII / Sub-Sec. C: General Annex. E: Plant Documentation, Commissioning and Test Procedure / Page 5 of 11: Page: 88
Sec. -VII / Sub-Sec. C: General Annex. E: Plant Documentation, Commissioning and Test Procedure / Page 5 of 11: Page: 88
Sec. -VII / Sub-Sec. C: General Annex. E: Plant Documentation, Commissioning and Test Procedure / Page 5 of 11: Page: 88
Sec. -VII / Sub-Sec. C: General Annex. E: Plant Documentation, Commissioning and Test Procedure / Page 7 of 11: Page: 90
Sec. -VII / Sub-Sec. C: General Annex. E: Plant Documentation, Commissioning and Test Procedure / Page 8 of 11: Page: 91
Sec. -VII / Sub-Sec. C: General Annex. E: Plant Documentation, Commissioning and Test Procedure / Page 9 of 11: Page: 92
Sec. -VII / Sub-Sec. C: General Annex. E: Plant Documentation, Commissioning and Test Procedure / Page 11 of 11: Page: 94
Sec. -VII / Sub-Sec. F: O&M Agreement / Page 5 of 43: Page: 130
Sec. -VII / Sub-Sec. F: O&M Agreement / Page 7 & 8 of 43: Page: 133
Sec. -VII / Sub-Sec. F: O&M Agreement / Page 23 of 43: Page: 148
Sec. -VII / Sub-Sec. F: O&M Agreement / Page 27 of 43: Page: 152
Sec. -VII / Sub-Sec. F: O&M Agreement / Page 29 & 30 of 43: Page: 154
Sec. -VII / Sub-Sec. F: O&M Agreement / Annexure-1: Scope of Work for O&M/ Page 32 & 33 of 43: Page: 157
Sec. -VII / Sub-Sec. F: O&M Agreement / Annexure-2: Functional Guarantees/ Page 37 of 43: Page: 162
Sec. -VII / Sub-Sec. F: O&M Agreement / Annexure-2: Functional Guarantees/ Page 37 of 43: Page: 162
SECTION - VII SUB-SECTION A Scope of Works
Technical
Technical
Technical
Technical
Technical
Technical
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
nit.html
html • 0.09 MB
Commercial_Package-2.pdf
NIT • 3.57 MB
Technical_package-2.pdf
NIT • 1.87 MB
Format_for_Schedule_of_Rates_Package-2.xlsx
NIT • 0.02 MB
Integrity_Pact.pdf
NIT • 2.99 MB
Format_for_seeking_clarifications_.xlsx
NIT • 0.01 MB
Site Visit and Prebid Meeting Notice Package 2 wind ramagiri.pdf
NIT • 0.11 MB
Amendment-1_Clarification-1_dwgFile_KML_File_SA-A_SA-B_SA-C_Amendment-1 Clarification-1 dwgFile KML File SA-A SA-B SA-C_Amendment-01Package-2Wind10092026.pdf
NIT • 0.55 MB
Amendment-1_Clarification-1_dwgFile_KML_File_SA-A_SA-B_SA-C_Amendment-1 Clarification-1 dwgFile KML File SA-A SA-B SA-C_Clarifications-1.pdf
NIT • 0.55 MB
Amendment-1_Clarification-1_dwgFile_KML_File_SA-A_SA-B_SA-C_Amendment-1 Clarification-1 dwgFile KML File SA-A SA-B SA-C_CONSOLIDATED QUARIES CLARIFICATION AMENDMENT_1.xlsx
NIT • 0.66 MB
Amendment-1_Clarification-1_dwgFile_KML_File_SA-A_SA-B_SA-C_Amendment-1 Clarification-1 dwgFile KML File SA-A SA-B SA-C_NDMC Ramagiri (08-09-26).kml
NIT • 0.29 MB
Amendment-1_Clarification-1_dwgFile_KML_File_SA-A_SA-B_SA-C_Amendment-1 Clarification-1 dwgFile KML File SA-A SA-B SA-C_SA-A (Revised) Indicative SLD - Plant Pooling Sub-Statio.pdf
NIT • 0.72 MB
Amendment-1_Clarification-1_dwgFile_KML_File_SA-A_SA-B_SA-C_Amendment-1 Clarification-1 dwgFile KML File SA-A SA-B SA-C_SA-B (Revised) Tentative Land Layout (With Micrositing .dwg
NIT • 0.31 MB
Amendment-1_Clarification-1_dwgFile_KML_File_SA-A_SA-B_SA-C_Amendment-1 Clarification-1 dwgFile KML File SA-A SA-B SA-C_SA-B (Revised) Tentative Land Layout (With Micrositing .pdf
NIT • 1.04 MB
Amendment-1_Clarification-1_dwgFile_KML_File_SA-A_SA-B_SA-C_Amendment-1 Clarification-1 dwgFile KML File SA-A SA-B SA-C_SA-C_Geotech Investigation Report (Adjacent Site for Ref.pdf
NIT • 0.13 MB
Amendment-2 and Format for NDA.pdf
NIT • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .