Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A 183 TTC INDUSTRIAL AREA KHAIRANE MIDC THANE BELAPUR ROAD NAVI MUMBAI THANE MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
| 3 | Admitted-Finance 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Techno-commercially rejected |
Tender Value
Refer Docs
Closing Date
6 Sept 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Bhupendra Singh
6th floor Service block North yard Mazagon Dock Shipbuilders Ltd. Dockyard Road Mumbai 400010
Hiring of services for Shafting Engineering Jobs for Y 12652 Y 12653 and Y 12654 of P17A ships
2021_MDL_87036_1
8000001026
Open Tender
Miscellaneous Services
Service
1095 days
MDL, Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
29 Oct 2021
13 Aug 2021
7 Sept 2021
13 Aug 2021
6 Sept 2021
13 Aug 2021
120 days
Preliminary LoS (Line of Sight) (P&S) Re confirm the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For YD-12652
Measuring and marking (P&S) Measure and mark the longitudinal and transverse position of the respective reference points on the Shaft Line Theoretical Axis for the following item • Propeller Centre • A-Bracket • P-Bracket • Stern Tube • Thrust Block • Gear Box • Gas Turbine • Diesel Engine For YD-12652
First Line of Sight (LoS) (P&S) Establish Initial Line of Sight using Laser or optical telescope, with reference to target station of Propeller centre and at FR 49.5 target station. For YD-12652
Gear box seat installation in Diesel Engine room Compartment (P&S) Installation of gear box foundation (seat) with reference to the line of sight and as per mdl drawing , OEM and MSI documents For YD-12652
Thrust block seat installation in AMR-I compartment (P&S) Installation of Thrust block Foundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documents For YD-12652
Gas Turbine seat installation in GTR compartment (P&S) Installation of Gas Turbine Foundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documents For YD-12652
Diesel Engine seat installation in DER compartment (P&S) Installation of Diesel Engine Foundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documents For YD-12652
Re-confirmation of Propulsion Equipment Foundation seat before and after welding (P&S) Second line of sight to be carried out to reconfirm the position of Propulsion equipment Foundation seat before and after welding For YD-12652
Gear box foundation drilling and Shipping –inn Opening and Equipment lowering and securing (P&S) Shipping –inn Opening and Equipment lowering of propulsion related equipment such as CPP & Shafting items, Gear box, Diesel Engine, Gas Turbine and after securing of the same. For YD-12652
Re-confirmation of all Shafting Target Points (P&S) Second line of sight to be carried out to reconfirm the effect of welding and shipping in of equipment. For YD-12652
Conduct LoS (Line of Sight)with Stern Drop Measurement and errection of temporary shaft support (P&S) Re confirms the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For measurement of Stern Drop. Erection of temporary Shaft supports Position temporary supports and align on LoS as per MSI document. For YD-12652
Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-Bracket Initial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in opening For YD-12652
Control welding, NDT checks and thermal stress relieving of Stern tube, A- Bracket, P-Bracket (P&S) Controlled welding and thermal stress relieving of Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortion For YD-12652
Line of Sight using Optical / Laser (P&S) Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft line For YD-12652
Measurement of Chock height Measurement and analysis of Chock height for Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoS For YD-12652
Final LoS (P&S) Final LoS for Bearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear box For YD-12652
Resin Chocking of Bearings and bolting of bearing housing (P&S) Resin chocking is for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and bolting For YD-12652
Embarkation Outboard Shafting and Installation Embarkation of Stern tube shaft, deep sea seal, OKF Flange coupling, Emergency Pitch Setting Device (EPSD), OKC (Sleeve) coupling, Propeller shaft For YD-12652
Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling, Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling, For YD-12652
Measurement of Bearing clearances (P&S) Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearings For YD-12652
Installation of Deep sea seal and Testing (P&S) Installation of Deep sea seal, Air pressure test and Hydro test and run-in alignment For YD-12652
Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device. (P&S) Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device For YD-12652
Gap and Sag alignment (P&S) Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft Flange For YD-12652
Setting the size of Distance Ring (P&S) Measurement of final size of Distance Ring and to be machined For YD-12652
Gear box tooth contact checks (P&S) MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘Intermediate Shaft’ 2. With ‘MRG Output Shaft’ connected from ‘Intermediate Shaft’ For YD-12652
Final shaft coupling connection (P&S) Final connection of Shaft line to TB and MRG For YD-12652
Jack load test of Gear box, Thrust bearing and stern tube shaft (P&S) Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screws For YD-12652
Main reduction gear Chock fasting (P&S) Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactory and acceptance of OEM For YD-12652
Thrust bearing chocking (P&S) Final chocking of TB For YD-12652
Final Jack load checks and MRG tooth contact checks (P&S) Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with ‘Intermediate Shaft’ and Chocking to Foundation For YD-12652
Alignment and Installation of Gas Turbine (P&S) Alignment and Installation of Gas Turbine For YD-12652
Alignment and Installation of Diesel Engine (P&S) Alignment and Installation of Main Diesel Engine For YD-12652
Installation of Torsion meter, Oil distribution box, Earthing device. (P&S) Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’. For YD-12652
Bearing Jack load test after Propeller blade installation (P&S) Bearing Jack load test after Propeller blade installation and feathering checks of CPP System For YD-12652
Installation of Bulkhead Seals (P&S) Installation of Bulkhead Seals at Fr.#56 & Fr.#65 For YD-12652
Installation of Steering Gear system (P&S) Marking and structural opening as per reference MDL drawing for installation and welding of Rudder Cartridge with Hull plate. Installation of Rudder stock, Hydraulic power pack, tiller, and final alignment For YD-12652
Installation of Steering Gear Ram foundation Seat and Ram base bedding Installation of Ram Foundation seat bedding and Carryout separately Ram base bedding. For YD-12652
Alignment and calibration of Rudder with Tiller assembly arrangement. Alignment and calibration of Rudder with Tiller arrangement For YD-12652
Preliminary LoS (Line of Sight) (P&S) Re confirm the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For YD-12653
Measuring and marking (P&S) Measure and mark the longitudinal and transverse position of the respective reference points on the Shaft Line Theoretical Axis for the following item • Propeller Centre • A-Bracket • P-Bracket • Stern Tube • Thrust Block • Gear Box • Gas Turbine • Diesel Engine For YD-12653
First Line of Sight (LoS) (P&S) Establish Initial Line of Sight using Laser or optical telescope, with reference to target station of Propeller centre and at FR 49.5 target station. For YD-12653
Gear box seat installation in Diesel Engine room Compartment (P&S) Installation of gear box foundation (seat) with reference to the line of sight and as per mdl drawing , OEM and MSI documents For YD-12653
Thrust block seat installation in AMR-I compartment (P&S) Installation of Thrust block Foundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documents For YD-12653
Gas Turbine seat installation in GTR compartment (P&S) Installation of Gas Turbine Foundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documents For YD-12653
Diesel Engine seat installation in DER compartment (P&S) Installation of Diesel Engine Foundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documents For YD-12653
Re-confirmation of Propulsion Equipment Foundation seat before and after welding (P&S) Second line of sight to be carried out to reconfirm the position of Propulsion equipment Foundation seat before and after welding For YD-12653
Gear box foundation drilling and Shipping –inn Opening and Equipment lowering and securing (P&S) Shipping –inn Opening and Equipment lowering of propulsion related equipment such as CPP & Shafting items, Gear box, Diesel Engine, Gas Turbine and after securing of the same. For YD-12653
Re-confirmation of all Shafting Target Points (P&S) Second line of sight to be carried out to reconfirm the effect of welding and shipping in of equipment. For YD-12653
Conduct LoS (Line of Sight)with Stern Drop Measurement and errection of temporary shaft support (P&S) Re confirms the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For measurement of Stern Drop. Erection of temporary Shaft supports Position temporary supports and align on LoS as per MSI document. For YD-12653
Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-Bracket Initial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in opening For YD-12653
Control welding, NDT checks and thermal stress relieving of Stern tube, A- Bracket, P-Bracket (P&S) Controlled welding and thermal stress relieving of Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortion For YD-12653
Line of Sight using Optical / Laser (P&S) Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft line For YD-12653
Measurement of Chock height Measurement and analysis of Chock height for Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoS For YD-12653
Final LoS (P&S) Final LoS for Bearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear box For YD-12653
Resin Chocking of Bearings and bolting of bearing housing (P&S) Resin chocking is for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and bolting For YD-12653
Embarkation Outboard Shafting and Installation Embarkation of Stern tube shaft, deep sea seal, OKF Flange coupling, Emergency Pitch Setting Device (EPSD), OKC (Sleeve) coupling, Propeller shaft For YD-12653
Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling, Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling, For YD-12653
Measurement of Bearing clearances (P&S) Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearings For YD-12653
Installation of Deep sea seal and Testing (P&S) Installation of Deep sea seal, Air pressure test and Hydro test and run-in alignment For YD-12653
Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device. (P&S) Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device For YD-12653
Gap and Sag alignment (P&S) Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft Flange For YD-12653
Setting the size of Distance Ring (P&S) Measurement of final size of Distance Ring and to be machined For YD-12653
Gear box tooth contact checks (P&S) MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘Intermediate Shaft’ 2. With ‘MRG Output Shaft’ connected from ‘Intermediate Shaft’ For YD-12653
Final shaft coupling connection (P&S) Final connection of Shaft line to TB and MRG For YD-12653
Jack load test of Gear box, Thrust bearing and stern tube shaft (P&S) Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screws For YD-12653
Main reduction gear Chock fasting (P&S) Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactory and acceptance of OEM For YD-12653
Thrust bearing chocking (P&S) Final chocking of TB For YD-12653
Final Jack load checks and MRG tooth contact checks (P&S) Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with ‘Intermediate Shaft’ and Chocking to Foundation For YD-12653
Alignment and Installation of Gas Turbine (P&S) Alignment and Installation of Gas Turbine For YD-12653
Alignment and Installation of Diesel Engine (P&S) Alignment and Installation of Main Diesel Engine For YD-12653
Installation of Torsion meter, Oil distribution box, Earthing device. (P&S) Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’. For YD-12653
Bearing Jack load test after Propeller blade installation (P&S) Bearing Jack load test after Propeller blade installation and feathering checks of CPP System For YD-12653
Installation of Bulkhead Seals (P&S) Installation of Bulkhead Seals at Fr.#56 & Fr.#65 For YD-12653
Installation of Steering Gear system (P&S) Marking and structural opening as per reference MDL drawing for installation and welding of Rudder Cartridge with Hull plate. Installation of Rudder stock, Hydraulic power pack, tiller, and final alignment For YD-12653
Installation of Steering Gear Ram foundation Seat and Ram base bedding Installation of Ram Foundation seat bedding and Carryout separately Ram base bedding. For YD-12653
Alignment and calibration of Rudder with Tiller assembly arrangement. Alignment and calibration of Rudder with Tiller arrangement For YD-12653
Preliminary LoS (Line of Sight) (P&S) Re confirm the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For YD-12654
Measuring and marking (P&S) Measure and mark the longitudinal and transverse position of the respective reference points on the Shaft Line Theoretical Axis for the following item • Propeller Centre • A-Bracket • P-Bracket • Stern Tube • Thrust Block • Gear Box • Gas Turbine • Diesel Engine For YD-12654
First Line of Sight (LoS) (P&S) Establish Initial Line of Sight using Laser or optical telescope, with reference to target station of Propeller centre and at FR 49.5 target station. For YD-12654
Gear box seat installation in Diesel Engine room Compartment (P&S) Installation of gear box foundation (seat) with reference to the line of sight and as per mdl drawing , OEM and MSI documents For YD-12654
Thrust block seat installation in AMR-I compartment (P&S) Installation of Thrust block Foundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documents For YD-12654
Gas Turbine seat installation in GTR compartment (P&S) Installation of Gas Turbine Foundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documents For YD-12654
Diesel Engine seat installation in DER compartment (P&S) Installation of Diesel Engine Foundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documents For YD-12654
Re-confirmation of Propulsion Equipment Foundation seat before and after welding (P&S) Second line of sight to be carried out to reconfirm the position of Propulsion equipment Foundation seat before and after welding For YD-12654
Gear box foundation drilling and Shipping –inn Opening and Equipment lowering and securing (P&S) Shipping –inn Opening and Equipment lowering of propulsion related equipment such as CPP & Shafting items, Gear box, Diesel Engine, Gas Turbine and after securing of the same. For YD-12654
Re-confirmation of all Shafting Target Points (P&S) Second line of sight to be carried out to reconfirm the effect of welding and shipping in of equipment. For YD-12654
Conduct LoS (Line of Sight)with Stern Drop Measurement and errection of temporary shaft support (P&S) Re confirms the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For measurement of Stern Drop. Erection of temporary Shaft supports Position temporary supports and align on LoS as per MSI document. For YD-12654
Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-Bracket Initial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in opening For YD-12654
Control welding, NDT checks and thermal stress relieving of Stern tube, A- Bracket, P-Bracket (P&S) Controlled welding and thermal stress relieving of Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortion For YD-12654
Line of Sight using Optical / Laser (P&S) Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft line For YD-12654
Measurement of Chock height Measurement and analysis of Chock height for Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoS For YD-12654
Final LoS (P&S) Final LoS for Bearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear box For YD-12654
Resin Chocking of Bearings and bolting of bearing housing (P&S) Resin chocking is for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and bolting For YD-12654
Embarkation Outboard Shafting and Installation Embarkation of Stern tube shaft, deep sea seal, OKF Flange coupling, Emergency Pitch Setting Device (EPSD), OKC (Sleeve) coupling, Propeller shaft For YD-12654
Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling, Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling, For YD-12654
Measurement of Bearing clearances (P&S) Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearings For YD-12654
Installation of Deep sea seal and Testing (P&S) Installation of Deep sea seal, Air pressure test and Hydro test and run-in alignment For YD-12654
Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device. (P&S) Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device For YD-12654
Gap and Sag alignment (P&S) Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft Flange For YD-12654
Setting the size of Distance Ring (P&S) Measurement of final size of Distance Ring and to be machined For YD-12654
Gear box tooth contact checks (P&S) MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘Intermediate Shaft’ 2. With ‘MRG Output Shaft’ connected from ‘Intermediate Shaft’ For YD-12654
Final shaft coupling connection (P&S) Final connection of Shaft line to TB and MRG For YD-12654
Jack load test of Gear box, Thrust bearing and stern tube shaft (P&S) Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screws For YD-12654
Main reduction gear Chock fasting (P&S) Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactory and acceptance of OEM For YD-12654
Thrust bearing chocking (P&S) Final chocking of TB For YD-12654
Final Jack load checks and MRG tooth contact checks (P&S) Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with ‘Intermediate Shaft’ and Chocking to Foundation For YD-12654
Alignment and Installation of Gas Turbine (P&S) Alignment and Installation of Gas Turbine For YD-12654
Alignment and Installation of Diesel Engine (P&S) Alignment and Installation of Main Diesel Engine For YD-12654
Installation of Torsion meter, Oil distribution box, Earthing device. (P&S) Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’. For YD-12654
Bearing Jack load test after Propeller blade installation (P&S) Bearing Jack load test after Propeller blade installation and feathering checks of CPP System For YD-12654
Installation of Bulkhead Seals (P&S) Installation of Bulkhead Seals at Fr.#56 & Fr.#65 For YD-12654
Installation of Steering Gear system (P&S) Marking and structural opening as per reference MDL drawing for installation and welding of Rudder Cartridge with Hull plate. Installation of Rudder stock, Hydraulic power pack, tiller, and final alignment For YD-12654
Installation of Steering Gear Ram foundation Seat and Ram base bedding Installation of Ram Foundation seat bedding and Carryout separately Ram base bedding. For YD-12654
Alignment and calibration of Rudder with Tiller assembly arrangement. Alignment and calibration of Rudder with Tiller arrangement For YD-12654
Goltens India Private Limited
YEOMAN MARINE SERVICES PVT. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .