TENALI MUNICIPALITY
Tenali
Laying of balance CC Road from Ele. Transformer No.SS-693 to Ele. Pole No.226/A5 in Golidonka main road, in Ward No.2 of Tenali Municipality under 15th FC 2024-25 Untied Grant (2nd Instalment)
935867
06/2026-27/15th FC Grant-1
OPEN - NCB
Civil Works
GUNTUR
14 documents required · 12 mandatory · 2 optional
₹2,119
₹59,848
19 Jun 2026
20 May 2026
20 May 2026
Engaging of Tyre mounted machine like JCB/ Etachi on hire basis for dismantlling of old drain, steps, house side ramps, culverts slabs and approaches including hire charges of the machine, fuel charges, operetor wages and all types of incidental charges as directed by the departmental authorities etc., complete.
Earthwork in excavation for roads as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (Mechanical)
Carting away the surplus excavated earth from the work site with a lead of 2.00 Km beyond initial lead including loading, unloading and conveyance but exclding stacking charges etc., complete.
Manufacture, supply, delivery and laying of 300 mm dia. Cement Concrete Pipe NP3 on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet as per Tech Specification No. 1100 MORTH
Construction of granular sub-base by providing Well graded material for Grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.
Supply and laying of Integrated multi functioning woven polypropylene high modulus geosynthetics geotextile with the technical specification of tensile modulus at 2% strain (MD) 700 kN/m, tensile modulus at 2% strain (CD) 800 kN/m as per ISO10319, Elongation at break (MD) 12% as per ISO10319, Elongation at break (CD) 10% as per ISO 10319, CBR puncture strength 6 kN as per ISO 12236, Seam strength (MD) 30 kN/m as per ISO 10321, Seam strength (CD) 22.5 kN/m as per ISO 10321, Pore size 090 - 0.3mm as per ISO 12956, Water permeability Q(50mm head) -2000 1/m2/min as per ISO 11058, UV resistance (at 500 Hours) 90% retained strength as per ASTM D4355. the geotextile shall have monofilament(MD) and engineered tape(CD) yarns in accordance to the MORTH during execution of work and also as per directions of the Engineer-in- charge
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
10.Tender-Doc_-_Corrected.doc
TENDER_DOCUMENT • 0.31 MB
NIT.xls
TENDER_DOCUMENT • 0.20 MB
Road golidonka.xlsx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .