| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹59.6 L+₹4.4 L (8.01%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹69.1 L+₹13.9 L (25.1%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹69.1 L
EMD Value
₹50,000
Closing Date
19 Apr 2023, 3:00 pmClosed
Executive Engineer
KWA, PH Division, Shoranur
JJM-CWSS to Anakkara,,Pattithara _Kappur G.P-Additional Pipe laying works in Anakkara Grama Panchayath
2023_KWA_571827_1
WRD/KWA-CE(NR)/TR/4784/2023
Open Tender
Civil Works - Water Works
Item Rate
30 days
Anakkara
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
₹50,000
Yes
11 May 2023
13 Apr 2023
20 Apr 2023
13 Apr 2023
19 Apr 2023
13 Apr 2023
Amount
COST OF MATERIALS
100.98.154:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 90mm Outer Dia.
100.98.155:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 110mm Outer Dia.
OD234341/2022-2023:supply of HDPE Pipe PE specials (5%of cost of Pipes)
Working Charges
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
18.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore
100.10.1:Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 90mm Nominal Outer Diameter pipes.
100.10.2:Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 110mm Nominal Outer Diameter Pipes.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD234459/2022-2023:4.11.2. Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil
VISHNU VIJAYAN
LUKMAN.T
Bidder Name
LUKMAN.T
VISHNU VIJAYAN
UNNENKUTTY MACHINGAL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_844191.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .