| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹46.3 L+₹2,000 (0.04%)Rejected-AOC BTC KOKRAJHAR ASSAM | L2 | Rejected-AOC L2 | |
| 3 | L3₹47.0 L+₹79,363.63 (1.72%)Rejected-AOC ASSAM AS | KAMRUP | ASSAM | 781030 | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Sri Bishnu Basumatary L2 | Jamidar Narzary L3 | MAHESWAR BRAHMA L1 |
|---|---|---|---|---|---|---|
| 1.00 | 1.Construction of Office Building
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 94.53 | Cum | 300 ₹28,360.5 Lowest | 303 ₹28,644.11 | 304.25 ₹28,762.27 |
| 2.00 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 288.54 | Sqm | 644.15 ₹1,85,863.04 | 650.59 ₹1,87,721.24 | 644.04 ₹1,85,831.3 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.25 | Cum | 7,260 ₹59,880.48 | 7,332.6 ₹60,479.28 | 7,247.91 ₹59,780.76 Lowest |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 2,167.9 | Kg | 95.09 ₹2,06,145.61 | 96.04 ₹2,08,205.12 | 95.08 ₹2,06,123.93 Lowest |
| 5.00 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 2,112.57 | Kg | 95.09 ₹2,00,884.28 | 96.04 ₹2,02,891.22 | 95.08 ₹2,00,863.16 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 94.36 | Sqm | 326.66 ₹30,823.64 | 329.93 ₹31,132.19 | 326.63 ₹30,820.81 Lowest |
| 7.00 | 5.9.6 Coloumns, Pillars,Piers,Abutments,Posts and struts | 95.16 | Sqm | 853.12 ₹81,182.9 | 861.65 ₹81,994.61 | 853.03 ₹81,174.33 Lowest |
| 8.00 | 5.9.5 Lintels, Beams,Plinth beams girders, bressuemers and cantilevers | 100.45 | Sqm | 645.31 ₹64,821.39 | 651.76 ₹65,469.29 | 645.25 ₹64,815.36 Lowest |
| 9.00 | 5.9.3 Suspended floors, roofs, landings, balconies and access platform | 3.4 | Sqm | 813.13 ₹2,764.64 | 821.26 ₹2,792.28 | 813.05 ₹2,764.37 Lowest |
| 10.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 31.98 | Cum | 8,428.47 ₹2,69,550.9 | 8,512.75 ₹2,72,246.26 | 8,427.63 ₹2,69,524.04 Lowest |
Tender Value
₹46.3 L
EMD Value
₹92,555
Closing Date
21 Feb 2026, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sri J.M. Basumatary
O/o the Addl. Chief Engineer-cum-Director, PWD, BTC, Kokrajhar.
Construction of Cultural stage at Olongbar High School Field, Delaisri and Gwjwnpwthar (Bhimajuli), Udalguri District under undivided Biswanath District under SOPD Bodoland Welfare Department, 2025-26. TN_108_06
2026_BTC_50969_1
No.ACE-133/PWD/G.79/2025-26/66
Open Tender
Civil Works - Building
Item Rate
180 days
Kokrajhar
Refer to Tender Documents
4 documents required · 4 mandatory
₹1,000
₹92,555
Yes
12 May 2026
9 Feb 2026
21 Feb 2026
9 Feb 2026
21 Feb 2026
9 Feb 2026
9 Feb 2026 - 21 Feb 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of Office Building
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 94.54 | Cum | - | - |
| 2 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 288.54 | Sqm | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.25 | Cum | - | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 2,167.9 | Kg | - | - |
| 5 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 2,112.57 | Kg | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 94.36 | Sqm | - | - |
| 7 | 5.9.6 Coloumns, Pillars,Piers,Abutments,Posts and struts | 95.16 | Sqm | - | - |
| 8 | 5.9.5 Lintels, Beams,Plinth beams girders, bressuemers and cantilevers | 100.45 | Sqm | - | - |
| 9 | 5.9.3 Suspended floors, roofs, landings, balconies and access platform | 3.4 | Sqm | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 31.98 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
BOQ_81105.xls
BOQ • 0.29 MB
FOB.pdf
Additional Documents • 0.26 MB
SBD.pdf
Tender Documents • 3.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .