Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 CrAccepted-AOC | ₹30.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹31.3 CrRejected-AOC 17 03 01 METRO CITY PAPER MILL COMPOUND LUCKNOW 226006 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226006 | ₹31.3 Cr | L2 | Rejected-AOC Rejected |
| 3 | L3₹31.5 CrRejected-AOC 3 310 VISHWAS KHAND GOMTINAGAR LUCKNOW | LUCKNOW | ₹31.5 Cr | L3 | Rejected-AOC Rejected |
| 4 | L4₹42.5 CrRejected-AOC D 1 1 GILLANDER HOUSE 8 N S ROAD KOLKATA 700 001 | KOLKATA | WEST BENGAL | 700001 | ₹42.5 Cr | L4 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | KISHORE ROY L1 | M/s Anmol Associates L3 | MVD INFRADEVELOPERS PVT LTD L2 | MACKINTOSH BURN LIMITED L4 |
|---|---|---|---|---|---|---|---|
| 1.00Land Development | |||||||
| 1.00 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.--All kinds of soil | 20,366.95 | sqm | 18 ₹3.7 L | 20 ₹4.1 L | 19.28 ₹3.9 L | 18.1 ₹3.7 L |
| 1.00 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201.By Mechanical Means
In area of non-thorny jungle | 0.22 | Hectare | 40,000 ₹8,800 | 43,000 ₹9,460 | 42,654.38 ₹9,383.96 | 90,047.3 ₹19,810.41 |
| 1.00 | Excavation in soil by manual means
Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300. | 14,551.33 | cum | 230 ₹33.5 L | 300 ₹43.7 L | 281.08 ₹40.9 L | 263.9 ₹38.4 L |
| 1.00 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRT&H Technical Specification clauses of section 300. | 47,649.5 | cum | 58 ₹27.6 L | 62 ₹29.5 L | 61.88 ₹29.5 L | 150 ₹71.5 L |
| 1.00 | Construction of Embankment with Material deposited from Roadway Cutting
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300.2 and as per MoRT&H Technical Specification clauses of section 300. | 9,588.49 | cum | 125 ₹12.0 L | 160 ₹15.3 L | 151.78 ₹14.6 L | 124 ₹11.9 L |
| 1.01 | Crushed stone aggregates of 40 mm nominal size
Supply of Stone boulders and crushing in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, conveyor belt and vibrating screens to obtain stone aggregates of 40 mm nominal size. | 656.17 | cum | 6,000 ₹39.4 L | 6,200 ₹40.7 L | 6,163.7 ₹40.4 L | 5,613.8 ₹36.8 L |
| 1.01 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.
I. Sand filling | 835.88 | cum | 1,200 ₹10.0 L | 1,600 ₹13.4 L | 1,567.27 ₹13.1 L | 1,168 ₹9.8 L |
| 1.01 | Supply at site of work well decayed farm yard manure, from any available source, approved by the engineer in charge including screening and stacking. | 338.48 | cum | 762 ₹2.6 L | 820 ₹2.8 L | 811.61 ₹2.7 L | 762 ₹2.6 L |
| 1.01 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per drawings & MoRT&H technical specifications Clauses 2100. (including centering, shuttering, staging etc. but excluding reinforcement) | 31.4 | cum | 10,500 ₹3.3 L | 12,000 ₹3.8 L | 11,617.75 ₹3.6 L | 9,983.7 ₹3.1 L |
Tender Value
Refer Docs
EMD Value
₹30.3 L
Closing Date
23 Jun 2025, 3:00 pmClosed
Project Director(ADB Project)
Office of the Managing Director, TIDC Ltd., Shilpa Nigam Bhawan, Khejurbagan, Agartala, West Tripura.
Land Development Landscaping Water Supply Common Infrastructure Industrial Safety and Security etc at Nagicherra Industrial Estate Tripura PACKAGE 22
2025_TIADB_61189_1
06/TIDC/ENGG/PNIeT/2025-26,
Open Tender
Civil Works - Others
3288 days
Nagicherra IE
Please refer Tender Documents
8 documents required · 8 mandatory
₹10,000
₹30.3 L
TIDC Conference Hall
5 Nov 2025
8 May 2025
23 Jun 2025
8 May 2025
23 Jun 2025
21 May 2025
8 May 2025 - 20 May 2025
19 May 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid