Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.8 Cr
EMD Value
₹2.6 L
Closing Date
2 May 2026, 3:00 pmClosed
THE CHIEF GENERAL MANAGER
AVNL Ordnance factory Medak, Yeddumailaram
Construction of Toilet blocks for Industrial employees in H and T, LMS, Foundry, SMS and TR buildings inside factory area at OFMK.
2026_AVNL_274368_1
73025/TE-02/OFMK/EO/2026-27
Open Tender
Civil Works
Item Rate
365 days
AVNL, ORDNANCE FACTORY MEDAK
As per tender Terms and conditions
2 documents required · 2 mandatory
₹0
₹2.6 L
11 May 2026
9 Apr 2026
4 May 2026
9 Apr 2026
2 May 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DEMOLITION OF BRICK WORK : Demolition of brick work or stone /boulder masonry built in cement mortal including all quoins, arches, pillars, etc. complete all as specified and directed by EIC | - | Cum | - | - |
| 2 | DEMOLITION OF RCC : Demolition of reinforced cement concrete in ground floors and
pavings n exc 15 cm thickness (below or above ground level) . Complete all as specified and directed by EIC | - | Cum | - | - |
| 3 | Surface excavation in hard/dense soil n.exc (not exceeding ) 30 cm deep and averaging 15CM deep and getting out inclulding all as specified and directed by EIC. | - | Sqm | - | - |
| 4 | EXCAVATION : Excavation over areas in hard/dense soil not exceeding 1.5 m depth and getting out, spreading/levelled, complete all as specified and directed. | - | Cum | - | - |
| 5 | EXCAVATION : Excavation over areas in hard rock not exceeding 1.5 m depth and getting out, spreading/levelled, complete all as specified and directed. | - | Cum | - | - |
| 6 | EXCAVATION: Excavation in trenches in hard rock not exceeding 1.5m width and 1.5m depth and getting out and carting the same to the location as shown by EIC/SIC | - | Cum | - | - |
| 7 | EXCAVATION: Excavation in trenches in in hard/dense soil not exceeding 1.5m width and 1.5m depth and getting out and carting the same to the location as shown by EIC/SIC | - | Cum | - | - |
| 8 | FELLING OF TREE: Felling of tree exc.30 cm and not exc.100 cm girth including cutting of trunk and branches and stacking of serviceable material and disposal of unserviceable material to a distance n exc. 50m and clearing site. | - | Each | - | - |
| 9 | GRUBBING UP TREE TRUNK : Grubbing up tree trunk of girth exceeding 100 mm and not exceeding 150 mm, including cutting of trunk portion protruding over ground, digging out roots, filling holes and levelling off ground, stacking of serviceable materials and removing of unserviceable materials to a distance n. exc. 50 m and clearing site. | - | Each | - | - |
| 10 | REMOVING OF EXCAVATED MATERIAL Removal of excavated material to a distance exceeding 500M but not exceding 1.0 KM and deposting where directed, complete all specified and directed. | - | Cum | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.33 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_320296.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .