| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAdmitted-Finance NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | L1 | Admitted-Finance | |
| 2 | L2₹38.3 L+₹2.3 L (6.43%)Admitted-Finance 0 DHULJI KI DHANI DESURIYAN VISHNOIYAN SURPURA JODHPUR JODHPUR RAJASTHAN 342304 | JODHPUR | RAJASTHAN | 342304 | L2 | Admitted-Finance | |
| 3 | L3₹42.6 L+₹6.6 L (18.3%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical 86 7 CONVENT ROAD MITTAPUDUR SALEM DISTRICT TAMIL NADU 636016 | MITTAPUDUR | SALEM | TAMIL NADU | 636016 | - | Rejected-Technical Technical eligibility criteria not satisfied as Form 7 is not submitted |
| Sl No | Description | Qty | Unit | M/s MSK Construction L1 | Rajendran Contractor L3 | D K SOLUTIONS L2 |
|---|---|---|---|---|---|---|
| 1.01 | Earthwork excavation in hard gravel soil upto depth 45cm by manually and disposal the debris to a far off place including cost of all materials, labour charges and other charges etc complete. | 12.1 | CUM | 300 ₹3,630 Lowest | 1,100 ₹13,310 | 950 ₹11,495 |
| 2.01 | Laying dry river sand for strengthening the base for providing Jelly concrete including cost of all materials, labour and other charges etc complete. | 1.51 | CUM | 3,000 ₹4,530 | 3,500 ₹5,285 | 2,000 ₹3,020 Lowest |
| 3.01 | Laying stone jelly concrete 1:2:4 using 20mm size stone aggregate for fixing the kerb stone at Fort gateway area including cost of all materials, labour and other charges etc complete. | 10.21 | CUM | 9,000 ₹91,890 | 4,500 ₹45,945 Lowest | 8,000 ₹81,680 |
| 4.01 | Providing kerb stone at northern and western side at Fort gateway by using Granite stone slab of size 0.60m to 1.20m length and 0.45m height, 100mm thickness for kerb including cost of all materials, labour charges and other fixing charges etc., complete. | 107 | RMT | 2,500 ₹2,67,500 | 1,700 ₹1,81,900 Lowest | 3,100 ₹3,31,700 |
| 5.01 | Making, supplying and fixing of MS grill fencing by using with MS L angle 50x50x6mm as horizontal and vertical section end to end and the horizontal section of post 50x6mm MS flat and equal interval of 16mm dia MS round rods in vertical section each 10cm to 10cm and fixing the round emblem of ASI logo in the middle of the MS grills including fabricating, bending, welding charges and other fixing charges and applying painting etc. complete (as per the attached design). | 98.28 | SQM | 3,300 ₹3,24,324 Lowest | 5,200 ₹5,11,056 | 5,700 ₹5,60,196 |
| 6.01 | Removing the existing undulated stone flooring for resetting the stones properly at western side of the Fort gateway area including conveying, stacking the stones and other charges etc complete. | 201 | SQM | 1,200 ₹2,41,200 | 2,500 ₹5,02,500 | 250 ₹50,250 Lowest |
| 7.01 | Resetting the undulated stone flooring with proper alignment and pointing the stone joints using with cement mortar 1:2 at western side of the Fort Gateway area including cost of all conveying charges, labour and material charges etc.,complete. | 101.1 | SQM | 1,600 ₹1,61,760 | 3,100 ₹3,13,410 | 1,000 ₹1,01,100 Lowest |
| 8.01 | Providing stone slab at drainage area 0.90m width upto 1.00m width as cover slab for avoiding the fallen leaves, wastages and the purpose for easy flow out of drainage water including cost of all materials, labours and other charges etc., complete. | 5.13 | SQM | 4,000 ₹20,520 | 5,500 ₹28,215 | 2,000 ₹10,260 Lowest |
| 9.01 | Removal of earth/debris at southern side of the monument area including conveying the debris by manually for disposal to a far off place during night times due to the monument is situated at heavy crowd area including cost of all labour charges, material and other charges etc complete. | 225.29 | CUM | 1,400 ₹3,15,406 | 1,500 ₹3,37,935 | 1,000 ₹2,25,290 Lowest |
| 10.01 | Filling the earth at middle and bottom area for raise the surface level including conveying the earth by manually (slow nature of work) including cost of all materials, labour and other charges etc complete | 222.07 | CUM | 1,000 ₹2,22,070 Lowest | 2,000 ₹4,44,140 | 1,100 ₹2,44,277 |
Tender Value
₹40.1 L
EMD Value
₹1.0 L
Closing Date
18 Feb 2026, 3:30 pmClosed
SA,ASI, Trichy circle
O/o SA,ASI, Trichy circle, Trichy-620002
UPHA TO FORT GATEWAY (DEVELOPMENT OF VISITOR AMENITIES AND MS GRILL FENCING) FOR THE YEAR 2025-26
2026_ASI_897077_1
T-15/17/2026-TRICHY CIRCLE
Open Tender
Civil Works
Works
120 days
Main Guard gate, Trichy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.0 L
Yes
20 Feb 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
18 Feb 2026
4 Feb 2026
4 Feb 2026 - 18 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Archaeological Survey of India, Trichy Circle, MainGuard Gate,Trichy-2
Name of Work: UPHA TO FORT GATEWAY (DEVELOPMENT OF VISITOR AMENITIES & MS GRILL FENCING) FOR THE YEAR 2025-26
Contact No: 0431-2711258 (Rates should be quoted inclusive of GST )
Name of the Bidder/ Bidding Firm / Company :
Item No Description and specification of items of work to be executed Item Code / Make Specification / Quantities to be executed Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1.01 Earthwork excavation in hard gravel soil upto depth 45cm by manually and disposal the debris to a far off place including cost of all materials, labour charges and other charges etc complete. Item1 12.1 CUM Excess(+) Full Conversion INR
2.01 Laying dry river sand for strengthening the base for providing Jelly concrete including cost of all materials, labour and other charges etc complete. Item2 1.51 CUM Excess(+) Full Conversion INR
3.01 Laying stone jelly concrete 1:2:4 using 20mm size stone aggregate for fixing the kerb stone at Fort gateway area including cost of all materials, labour and other charges etc complete. Item3 10.21 CUM Excess(+) Full Conversion INR
4.01 Providing kerb stone at northern and western side at Fort gateway by using Granite stone slab of size 0.60m to 1.20m length and 0.45m height, 100mm thickness for kerb including cost of all materials, labour charges and other fixing charges etc., complete. Item4 107 RMT Excess(+) Full Conversion INR
5.01 Making, supplying and fixing of MS grill fencing by using with MS L angle 50x50x6mm as horizontal and vertical section end to end and the horizontal section of post 50x6mm MS flat and equal interval of 16mm dia MS round rods in vertical section each 10cm to 10cm and fixing the round emblem of ASI logo in the middle of the MS grills including fabricating, bending, welding charges and other fixing charges and applying painting etc. complete (as per the attached design). Item5 98.28 SQM Excess(+) Full Conversion INR
6.01 Removing the existing undulated stone flooring for resetting the stones properly at western side of the Fort gateway area including conveying, stacking the stones and other charges etc complete. Item6 201 SQM Excess(+) Full Conversion INR
7.01 Resetting the undulated stone flooring with proper alignment and pointing the stone joints using with cement mortar 1:2 at western side of the Fort Gateway area including cost of all conveying charges, labour and material charges etc.,complete. Item7 101.1 SQM Excess(+) Full Conversion INR
8.01 Providing stone slab at drainage area 0.90m width upto 1.00m width as cover slab for avoiding the fallen leaves, wastages and the purpose for easy flow out of drainage water including cost of all materials, labours and other charges etc., complete. Item8 5.13 SQM Excess(+) Full Conversion INR
9.01 Removal of earth/debris at southern side of the monument area including conveying the debris by manually for disposal to a far off place during night times due to the monument is situated at heavy crowd area including cost of all labour charges, material and other charges etc complete. Item9 225.29 CUM Excess(+) Full Conversion INR
10.01 Filling the earth at middle and bottom area for raise the surface level including conveying the earth by manually (slow nature of work) including cost of all materials, labour and other charges etc complete Item10 222.07 CUM Excess(+) Full Conversion INR
11.01 Earthwork excavation for laying the stone jelly concrete for revetment wall including disposal the same to a far off place and labour and other charges etc, complete. Item11 77.66 CUM Excess(+) Full Conversion INR
12.01 Filling the river sand at the base concrete for strengthening to the construction of revetment walls including cost of all materials, labours and other charges etc complete. Item12 4.39 CUM Excess(+) Full Conversion INR
13.01 Laying stone jelly concrete 1:3:6 using 40mm Stone aggregate for strengthening the base to the construction of revetment wall at Fort gateway area (eastern side area) including cost of all materials, labour and other charges etc complete. Item13 11.8 CUM Excess(+) Full Conversion INR
14.01 Construction of CR masonry wall in cement mortar 1:6 including cost of all materials, labour charges, curing and other charges etc., complete. Item14 179.99 CUM Excess(+) Full Conversion INR
15.01 Providing stone flooring/apron with stone slab having size of 0.60m width and a length varying from 0.60 to 1.50m fixing with CM 1:4 on 1st stage top of the eastern side Fort gateway area for better maintenance to the monument with necessary pointing to the stone joints including cost of conveying the materials, labour charges and other charges etc., complete. Item15 30.45 SQM Excess(+) Full Conversion INR
16.01 Removing the old chain linked fencing for providing MS grill fencing for better safety and security of the monument including cost and conveyance charges, labour charges and other charges ete complete Item16 33.1 RMT Excess(+) Full Conversion INR
17.01 Making, supplying and fixing of MS grill fencing by using with MS L angle 50x50x6mm as horizontal and vertical section end to end and the horizontal section of post 50x6mm MS flat and equal interval of 16mm dia MS round rods in vertical section each 10cm to 10cm and fixing the round emblem of ASI logo in the middle of the MS grills including fabricating, bending, welding charges and other fixing charges and applying painting etc complete (as per the attached design). Item17 39.72 SQM Excess(+) Full Conversion INR
18.01 Providing stone steps at southern side of the Fort gateway slope area for easy approach including cost of all materials, dressing, labour charges and other charges etc., complete. Item18 10.8 SQM Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
RFP1.pdf
Tender Documents • 16.16 MB
BOQ_942921.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .