Loading…
Loading…
Tender Value
₹5.2 L
EMD Value
₹10,414
Closing Date
10 Jun 2026, 3:30 pm5d left
Executive Engineer, PWD, Barasat Division
O/o EE, PWD, Barasat Division, Champadalimore, Barasat, Kolkata-700124
Water proof treatment of the roof with some allied works at the Blood Bank at Basirhat District Hospital, Basirhat Health District.
2026_WBPWD_5014763_1
WBPWD/BSTD/EE/NIeT02/26-27
Open Tender
CIVIL WORKS
30 days
Basirhat Sub Division
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,414
1 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
10 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m.
as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 1 | m3 | 119.27 | ₹119.15 |
| 2 | A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 1 | m3 | 936.21 | ₹935.27 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 1 | m2 | 361 | ₹360.64 |
| 4 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 1 | m2 | 24 | ₹23.98 |
| 5 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering)
In ground floor
(A) [Pakur Variety]
(a) 1:3:6 proportion | 1 | m3 | 5,248.52 | ₹5,243.27 |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after
completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor
height shall be taken as 4 m and extra for works beyond the initial 4 m ht.
shall be allowed under 12 (e) for every 4 m or part thereof)
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of
Engineer-In-Charge. | 1 | m2 | 335 | ₹334.67 |
| 7 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per
direction of Engineer-in charge. Consumption of cement will not be less than
300 Kg of cement with Super plasticiser per cubic meter of controlled
concrete but actual consumption will be determined on the basis of
preliminary test and job mix foumula. In ground floor and foundation.[using
concrete mixture]
M 25 Grade
(i) Pakur Variety | 1 | m3 | 6,595 | ₹6,588.41 |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures
including distribution bars, stirrups, binders etc initial straightening and
removal of loose rust (if necessary), cutting to requisite length, hooking and
bending to correct shape, placing in proper position and binding with 16
gauge black annealed wire at every intersection, complete as per drawing
and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL | - | MT. | 54,940.3 | - |
| 9 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in
ground floor. | - | m2 | 728.53 | - |
| 10 | Labour for Chipping of concrete surface before taking up
Plastering work | - | m2 | 21 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
2911iiason01122019.pdf
Tender Documents • 0.46 MB
BOQ_5083141.xls
BOQ • 0.39 MB
AllNotificationason01072024.pdf
Tender Documents • 2.35 MB
Download all tender documents and submit your bid