Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹30.6 L
EMD Value
₹30,700
Closing Date
17 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
the Executive Engineer, R & B Division, Mehsana
Construction Of Lift in Court Building At Vijapur Dist. Mehsana
361734
7 FOR 2026-2027 SN-5
Open
Civil Works - Buildings
Works
Mehsana
7 documents required · 7 mandatory
₹1,500
Executive Engineer, R&B Division, Mehsana
₹30,700
2 Nov 2026
2 Nov 2026
2 Nov 2026
17 Nov 2026
2 Nov 2026
120 days
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
1 Dismantling tiled of stone floors laid in mortar including 52.00 Sq.Mt. 49.18 Rupees Forty Nine And
stacking of serviceable materials and disposal of Sq.Mt. Paise Eighteen Only
unserviceable materials with all lead and lift
2 Demolition including stacking of serviceable materials and 4.00 Cu.M. 1081.83 Rupees One Thousand
disposal of unserviceable materials with all lead and lift. Cu.M. Eighty One And Paise
Eighty Three Only
(i) R.C.C. work
3 Demolition and disposal of unserviceable materials with all 4.00 Cu.M. 622.36 Rupees Six Hundred
lead and lifts Cu.M. Twenty Two And Paise
Thirty Six Only
(ii) Unreinforced cement concrete
4 Excavation for foundation in sand, gravel, clay soft soils 258.00 Cu.M. 511.45 Rupees Five Hundred
and murrum etc. including shoring, strutting dewatering as Cu.M. Eleven And Paise Forty
necessary and disposing of the excavated stuff as directed.
(A) Depth upto 3.0 Mt.
5 Providing and installing in position 6 mm thick MS liner 2.60 M.T. 47323.73 Rupees Forty Seven
including cutting, bending, welding, fabricating, driving, M.T. Thousand Three Hundred
Twenty Three And Paise
applying protective coating etc. complete as per drawing Seventy Three Only
and specification excluding temporary liner if provided.
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
6 Filling available excavated Earth (Excluding Rock ) in 242.00 Cu.M. 136.92 Rupees One Hundred
trench plinth side of foundation . in layer not excluding 20 Cu.M. Thirty Six And Paise
Ninety Two Only
cm in depth consolidation each deposited layer by ramming
and watering etc. complete
7 Providing and laying controlled cement concrete M-150 and 0.70 Cu.M. 3788.24 Rupees Three Thousand
curing complete including the cost of form work but Cu.M. Seven Hundred Eighty
Eight And Paise Twenty
excluding cost of reinforcement for reinforced concrete Four Only
(a) Foundations, footings Bases of columns and the like
and Mass concrete.
8 Providing and laying controlled cement concrete M-250 and 8.70 Cu.M. 4459.15 Rupees Four Thousand
curing complete including the cost of form work but Cu.M. Four Hundred Fifty Nine
And Paise Fifteen Only
excluding the cost of reinforcement for reinforced concrete
in foundation footings, Raft, base of columns and mass
9 Providing and laying controlled cement concrete M-250 and 3.00 Cu.M. 7364.92 Rupees Seven Thousand
curing complete including the cost of form work but Cu.M. Three Hundred Sixty Four
And Paise Ninety Two
excluding the cost of reinforcement for reinforced concrete Only
in Walls upto Plinth
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
10 Providing and laying cement concrete 1:3:6 (1 cement : 3 3.50 Cu.M. 2968.91 Rupees Two Thousand
coarse sand : 6 Crushed stone aggregates 40 mm. nominal Cu.M. Nine Hundred Sixty Eight
And Paise Ninety One
size) and curing complete excluding cost of from work in : Only
(a) Foundation and plinth
11 Providing and laying controlled cement concrete M-200 and 19.00 Cu.M. 7390.79 Rupees Seven Thousand
curing complete including the cost of form work but Cu.M. Three Hundred Ninety
And Paise Seventy Nine
excluding the cost of reinforcement for reinforced concrete Only
in RCC Paradi All Floor Level
12 Providing and laying controlled cement concrete M-200 and 1.00 Cu.M. 6697.39 Rupees Six Thousand Six
curing complete including the cost of form work but Cu.M. Hundred Ninety Seven
And Paise Thirty Nine
excluding the cost of reinforcement for reinforced concrete Only
in SLABS for Fourth Floor
13 Providing T M T. bar reinforcement of Fe-500D for R.C.C. 2380.00 Kg. 78.81 Rupees Seventy Eight
work including bending binding and placing in position Kg. And Paise Eighty One
complete up to All floor Level
14 Providing and laying Brick work using common Brunt clay 1.60 Cu.M. 3740.39 Rupees Three Thousand
building bricks having crushing strength not less than 35 Cu.M. Seven Hundred Forty And
Paise Thirty Nine Only
Kg./Sq.cm. In super structure above floor two level in
cement mortar 1:6 (1cement : 6 fine sand)
(b) Conventional {Fourth Floor}
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
15 Providing and laying 60 cm x 60 cm Full Body Matt 13.00 Sq.Mt. 1467.72 Rupees One Thousand
Finished Vitrified 8 mm thick tile flooring over 20 mm Sq.Mt. Four Hundred Sixty
Seven And Paise Seventy
{average} base of cement mortar 1:6 { 1 cement : 6 coarse Two Only
sand} on new surface or fixing on existing flooring by
adhesive materials including dismantling of existing flooring
and jointed with colour cement slurry including finished with
flush pointing & cleaning the surface etc. complete for
shade & pattern as directed by Architect Office.
16 Providing and laying water proofing treatment with China 68.00 Sq.Mt. 1131.71 Rupees One Thousand
mosaic tiles flooring over avg 50 mm C.C. 1:2:4 {1 Cement Sq.Mt. One Hundred Thirty One
And Paise Seventy One
: 2 sand : 4 Kapachi / Grit 6 to 12 mm size} bedding for Only
maintaining slope for plain and curve surface & 12 mm to
20 mm of broken piece of ceramic / glazed tiles ( one for
more colour as directed ) to be laid over cement mortar
bedding of C M 1:3 (1 cement : 3 sand ) contain one Kg of
water proofing materials per bag of O P C at plain or / and
slops and to be tempered to bring mortar ceramic up to
surface with using white cement and colour pigment
including rounding of junctions and extending them up to
15 cm along the wall and curing with bends any patterns or
design as per drawing and cleaning by using oxalic acid etc
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
17 Providing and laying Mirror polished Granite stone slab 14- 16.00 Sq.Mt. 5115.65 Rupees Five Thousand
18 mm (Average) thick of approved colour with all exposed Sq.Mt. One Hundred Fifteen And
Paise Sixty Five Only
edges half round moulded & polished, fixing rear face of
granite shall be sanded using clean sand sieve No.
passed, 2 mm fixed with Araldite For Doors / Windows sill &
Jams Cladding as per design incl. on 10 mm thick cement
mortar 1:3 (1 -cement : 3 coarse sand ) jointed with grey
cement slurry including rubbing and polishing & G.I.
Fasteners as required, etc. complete.
18 Providing 10mm thick cement plaster in single coat on 231.00 Sq.Mt. 140.61 Rupees One Hundred
brick/concrete walls for interior plastering All floor level and Sq.Mt. Forty And Paise Sixty
finished even and smooth in
(i) Cement mortar 1:3 (1-cement:3-sand).
19 Providing 20 mm thick double coat mala cement plaster on 17.00 Sq.Mt. 393.41 Rupees Three Hundred
interior brick / concrete work for plastering comprising of Sq.Mt. Ninety Three And Paise
Forty One Only
base coat of 12 mm thick cement plaster in cement mortar
(1 Cement : 4 coarse sand) in rough finishing and 8 mm
thick top coat of cement mortar 1:2 (1 Cement : 2 Coarse
sand) finished with trovel including scaffolding curing etc.
Fourth FLOOR
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
20 Applying two coats of acrylic lappy (putty) and two coats of 116.00 Sq.Mt. 40.59 Rupees Forty And Paise
primer of approved brand and manufacture on new wall Sq.Mt. Fifty Nine Only
surface to give an even shade including thoroughly
brushing the surface free from mortar dropping and other
foreign matter and sand papered smooth.
21 Wall painting (Two coats) with plastic emulsion paint of 116.00 Sq.Mt. 82.97 Rupees Eighty Two And
approved brand and manufacture on wall surfaces to give Sq.Mt. Paise Ninety Seven Only
an even shade including thoroughly brushing the surface
free from mortar droppings and other foreign matter and
sand papered smooth
22 Finishing wall with weather proof exterior emulsion paint on 141.00 Sq.Mt. 73.75 Rupees Seventy Three
wall surface (two coats) to give an required even shade Sq.Mt. And Paise Seventy Five
after thoroughly brushing the surface to remove all dirt, and
remains of loose powdered materials etc complete
23 Providing and laying and fixing 25mm thick expansion joint 6.00 Sq.Mt. 1491.03 Rupees One Thousand
by hydro cell semi rigid UV resistance with high Sq.Mt. Four Hundred Ninety One
And Paise Three Only
performance laminated closed cell polythene foam joint
filler in sheet foam as directed, etc. complete
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
24 Providing and filling the expansion joint by polymer confirm 16.00 Rmt. 515.39 Rupees Five Hundred
to BS 4254-1983 as per required shade and specification Rmt. Fifteen And Paise Thirty
by making groove of 50 mm x 12.5 mm lather by cutting or
by repairing groove and removing mortar drop or any other
foreign materials including applying primer and filling
required size (oversize of joint PU foam etc. complete.
25 Providing and fixing 25 cm wide & 3mm thick exterior 8.00 Sq.Mt. 1054.34 Rupees One Thousand
composite panel on existing expansion joint horizontally & Sq.Mt. Fifty Four And Paise
Thirty Four Only
vertically with all material, hardware, accessories & fittings
etc completed.
26 Steel work, welded in built up sections framed work 28.00 Quintal 10074.70 Rupees Ten Thousand
including cutting, hoisting, fixing in position and applying a Quintal Seventy Four And Paise
Seventy Only
priming coat of red lead paint. (D) In trusses and trussed
purlins, upto 25 M. span and 15 M. overall height.
27 Providing and fixing hard drawn steel wire fabric 75 mm x 472.00 Sq.Mt. 660.54 Rupees Six Hundred
25 mm mesh of weight not less than 7.75 kg per Sq. M. to Sq.Mt. Sixty And Paise Fifty Four
Windows Grill etc. Including fixing with MS flats and
welding including painting two coats with red lead paint
28 Providing corrugated PPGL Sheets 0.62 mm thick / 1.5 mm 29.00 Sq.Mt. 929.20 Rupees Nine Hundred
thick Transparent Acrylic Sheet (70%/30%) roofing fixed Sq.Mt. Twenty Nine And Paise
Twenty Only
with Galvanized iron 'J' or 'L' hooks bolts and nuts 8 m.
diameter with bitumen and G. I. Limpet washers filled with
white lead complete including ridges, gutters etc. excluding
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
the cost of purlins, rafters and trusses.
Electrification Work
29 Supplying and laying UPVC cable trunking system 20.00 Mtr. 428.24 Rupees Four Hundred
comprising un-plasticised polyvinyl, chloride rigid material Mtr. Twenty Eight And Paise
Twenty Four Only
with ignition free and flame proof confirming BS with
necessary end caps Internal and external bend, flat bends,
coupler, tee etc.. All necessary accessories and measuring
of following sizes
(2) 100 mm x 50 mm trunking
30 Providing and erecting Approved make Four pole moulded 2 Ea. 7469.25 Rupees Seven Thousand
case circuit breaker having breaking capacity ICU of 25 KA. Nos. Four Hundred Sixty Nine
And Paise Twenty Five
at 415 V,h aving normal current rating up to 25 A to 100A. Only
with Fixed thermal & magnetic release suitable to work on
A.C. supply 50 Hz. with all internal connections, spreader
tinned copper & complete erected in existing 16 G.M.S.
housing. ICS=100% of ICU only Cat III
31 Providing and erecting metallic vitrified danger notice board 2 Ea. 69.69 Rupees Sixty Nine And
as per language suggested by engineer in charge for Nos. Paise Sixty Nine Only
MEDIUM VOLTAGE installation to be erected as per IS-
32 Providing and erecting Annealed bare Copper wire 15.00 Kg. 794.87 Rupees Seven Hundred
4.064mm to 1.626mm. No. Ninety Four And Paise
Eighty Seven Only
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
33 Supplying & erecting earth pit of minimum bore dia.150mm 1 Ea. 4591.46 Rupees Four Thousand
size approved make Earthing Electrode consisting Pipe-in- No. Five Hundred Ninety One
And Paise Forty Six Only
Pipe Technology as per IS 3043-1987 made of corrosion
free hot dipped G. I. Pipes having Outer pipe dia of 50mm
having 80-200 Micron galvanising, Inner pipe dia of 25 mm
having 200-250 Micron galvanising, connection terminal dia
of 12mm with constant ohmic value surrounded by highly
conductive compound with high charge dissipation suitable
for following type of applications with chamber and heavy
duty cover. (A)(approved make OEM has to submit test
certificate including value of earth resistance of installation
duly stamped and signed by agency and officer In charge
has to ensure the value of earthing resistance mentioned in
test Certificate) & having back filling compound of (B) Inner
chemical (CCM Compound)- Resistivity:- 0.2 ohm / meter
testing as per IEC 62561-2017, Voltage drop:- < 1 volt at
no load & dry form, Sulphar content:- <2%(C) Back fill
Compound :- Earthing compound should be capable to
retain moisture for long time Necessary test report must be
submitted by Agency.
(a) For Electrical Installation up to 440V in normal soil
Length of pipe - 1 Mtr
Back filling compound - 1 Nos Bag of 15 Kg
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
34 Providing and erecting FRLS-XLPE(IS:7098)(I)-88 ISI 80.00 Mtr. 1235.23 Rupees One Thousand
armoured cable multistrand Copper conductor for 1.1 kV. Mtr. Two Hundred Thirty Five
And Paise Twenty Three
to be laid on wall with necessary clamps or in existing Only
trench / pipe at road crossing or floor of following size of
cables.(B) 4 core 16 Sq. mm
35 Providing & laying approved make Double walled 70.00 Mtr. 62.62 Rupees Sixty Two And
corrugated pipes (DWC) of polyethylene(conforming to IS Mtr. Paise Sixty Two Only
14930 II )with necessary connecting accessories of same
material at required depth in existing trench for laying of
cable. below ground / road surface for enclosing cable
(A)50 mm dia
36 Providing and, fixing heavy duty flange type brass cable 2 Ea. 47.47 Rupees Forty Seven And
gland with rubber ring for PVC insulated armoured cable Nos. Paise Forty Seven Only
complete without going tails, insulating tape etc for
following size of cables.
(D) 2 to 4 core 16 Sq. mm
37 Solder less crimping type Copper lugs conforming to IS 8 Ea. 12.12 Rupees Twelve And
suitable for cable of following size evenly crimped with high Nos. Paise Twelve Only
pressure tool & connected to switchgear terminals with
brass/cadmium plated nut bolts in an approved manner.
38 Supplying, Erecting, Testing & Commissioning the passenger lift 1 Ea. 1317217.76 Rupees Thirteen Lakh(s)
having following main features: No. Seventeen Thousand
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
(A) GENERAL DESCRIPTION OF LIFTS. Two Hundred Seventeen
[1] GEAR LESS LIFT DRIVE (MRL) comprising of High Starting And Paise Seventy Six
torque Lift 3 phase 440 V A. C. Permanent Magnet Synchronous Only
motor of proper rating with high efficiency shall be used.
[2] Micro processor based / PLC, ACVVVF, vector control drive
with encoder feedback closed loop system shall be used for lift
operation hall call demand response, UP/DOWN hall stops,
Main, Up/ Down Contactor with overload and phase reversal
relay and safety controls.
[3] Car with M S platform with bracings of adequate size and to
sustain the impact load cabin + passenger with safety factor of
fire for steel and side panels of Stainless steel of sheet of grade
304 duty. Car ceiling will be S.S. finishes with aesthetic
appearance with LED ceiling lights. Car flooring shall be of s/s
304 chaker plate design suggested of engineer in charge. of
engineer in charge. Car doors shall be of stainless steel grade
304, hairline finish with centre opening / telescopic automatic
doors. Car panel will also be S.S. 304 finished with emergency
stop device, mechanical door safety device, facility of auto/
attended mode. All car panel buttons and all floor switches must
be with brail language as per lift act.
[4] All landing doors must be fire rated for 2 hour shall be fully
automatic centre opening/ telescopic opening made of hairline
finish steel grade of 304 with key holes and infrared curtains with
Unlocking facility from outside
[5] Appropriate battery operated emergency light in the car along
with alarm switch shall be provided. Also, Emergency Light &
Fan should start immediately without any Time Delay as soon as
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
power fails.
[6] Digital scrolling indicator system for up-down arrow along with
floor position indicator shall be provided inside the car and at all
[7] Full height infra red curtain with multiple cross / crossing light
beams shall be provided.
[8] Automatic Rescue Device (ARD) shall be provided
accordingly of passenger capacity with Manual Rescue
Operation ( Manual Cranking Facility).
[9] Audio visual indication in the lift car showing over loading
shall be provided such that doors kept open till excess load is
[10] Spring buffers/PU Buffers shall be provided.
[11] Car fan as per passenger capacity with automatic sleep
timer shall be provided.
[12] Voice annunciator with suitable music shall be provided in lift
[13] Self diagnostics system for operational and safety
parameters shall be provided in control panel.
[14] Mechanical over speed governor with governor calibration
as per actual site parameters and submission of calibration
certificate submission, door key holes in the floor doors, fireman
switch shall be provided.
[15] Lift machine hoisting arrangement in the lift machine room
and monkey ladder for lift pit should be provided by the lift
agency, along with the other steel structure works, foundations
for the machine etc…
[16] In the hoist way fascia plate shall be provided without any
extra cost, where ever required as / if directed by engineer in
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
[17] Permanent wiring with necessary safety devices like RCCB
in all circuit, Over Voltage Under Voltage protection and THD
eliminator in circuit for lift machine room and lift well with proper
numbers of light points, with fixtures, exhaust fan and plug points
shall be provided by the agency. Only 3 phase Power Supply
shall be made available by department in lift machine room.
Necessary Earthing as per Lift Act/Rules shall be arranged by
Lift Agency.
[18] Any civil/ electrical works for additional and alteration in lift
shaft and machine room related to erection of lift shall be made
by lift agency without any extra cost. (granite/marble fixing
around all landing door openings are not in lift agency’s scope.)
[19] Agency has to provide all working drawings and documents
and liaison services for obtaining all necessary permission from
lift inspector and other authorities.
[20] acrylic transparent licence/display A4 size holder in lift
car[20A] As per statutory requirement of Govt. Of Gujarat lift &
escalator act 2000, lift agency has to provide
1. Car top safety barricade
2. Push & talk communication system.
3. Fireman's switch operation at Ground Floor.
4.carrying out third party lift inspection during/after lift erection
and provide report by third party authorized by concern
licensing authority 5.agency has to provide third party
insurance up to completion of free maintenance period and
submit the document for the same.
[21] Car Panel Operating Buttons at an accessible height from
wheelchair for handicapped person and raised numbers with
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
brail mark with floor position indicator/buttons must be of Auto
Glow type clearly visible when view from inside cabin.
[22] For Physically Handicapped person Full Length Handrails of
hairline finish steel grade of 304 should be provided at
appropriate 900mm height on the Rear & Side Wall Panels in
[23] With Necessary kVA rating voltage controlled Stabilizer
suitable for your controller, drive and all equipments of lift.
[24] Necessary rating of DP Elcb and FP Elcb required for lift is
in scope of work which rating is suggested by CEICED
Department (electrical Inspector)
(B) SPECIAL FEATURES DESCRIPTION OF LIFTS for
PREMIUM category1
. Advanced control system dual 64 bit embedded
microprocessor with CANBUS Serial Communication mode
including Regenerative power efficient operation, on site
programming facility, Anti nuisance, Pte-opening, BMS/RMS with
necessary online real time monitoring system having necessary
connectivity for remote monitoring & other suitable supporting
hardware & software devices to fulfil the purpose.2. Floor
Indication LCD Display with call registration & brail mark with
arrival gong and hall lantern & TFT Screen in the car with MP3
Voice Announcer. 3. CAR Panel should be Scratch resistive SS
Moonrock finish / Hair Line / Honeycomb for car and all Doors,
All landing doors must have fire rating up to 2 hours and car door
must have multi-level crisscross beam door protection. 4. To &
fro communication system & wiring (i.e. car, control room &
guard room ) and Each elevator are equipped with remote
monitoring system. agency has to provide mobile app and user
Quantity Estimated Rate Total Amount
Quantity Estimated Rate Total Amount
Item According to
Description of Item (with brief specification) But may be Unit
No. In Figure Estimated
more or In words Quantity
less Rs. Ps.
id and password for monitoring
4/5/6 Passengers, Ground plus 3 upper floors with Rated
Speed of 1.0 m/sec.,
(C) With General PLUS ADDITIONAL SPECIAL FEATURES
attached herewith. Prem. Cat.
0 TOTAL AMOUNT PUT TO TENDER
0 TOTAL AMOUNT PUT TO TENDER
Rupees Thirty Lakh(s) Sixty One Thousand One Hundred Eight And Paise Forty One Only
I/am we/are willing to carry out the work at _____% above /below _____________ percent (should be written in figures and words)
of the estimated rates mentioned above. Amount of my/our tender works out as under.
* Estimated amount put to tender * Estimated amount put to tender
Deduct :_____ %below Rs.________________ Add :_____ %above Rs.________________
Net Rs. ______________________ Total Rs. ______________________
In words ___________________________ In words __________________________
{* Strike whichever is not applicable.}
Signature of Executive Engineer
contractor R. & B. Division
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original
item at the rate of input rate mentioned in all the tender.
Signature of Executive Engineer
contractor R. & B. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2.GR to be attached with DTP_SBD.pdf
BUILDINGSPECIFICATIONSBOOK(NEW) Amendment.pdf
06 Conditions For Lift.pdf
15 year lift amc GR.pdf
BOQ Vijapur Lift.pdf
condition of elec sub-contractor-PQ.pdf
Detailed Specifications Vijapur Court.pdf
General Specification.pdf
MOU Electrical Work.pdf
tender condition-PQ.pdf
Tsting Schedule.pdf
SBD BOOK 1_0001.pdf
SBD BOOK 2_0001.pdf
SBD BOOK 3_0001.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .