Loading…
Loading…
Tender Value
₹6.4 L
EMD Value
₹12,888
Closing Date
12 Jun 2026, 11:00 am7d left
THE REGIONAL MANAGER WBSEDCL
ROOM NO 501 5TH FLOOR DOOARSKANYA ALIPURDUAR 736122
Painting of Exterior Walls of the CRB, Roof Treatment, Sanitary Plumbing works other allied civil works at Gergenda Substation under Alipurduar Division.
2026_WBSED_1024968_4
RM/ARO/Civil/eTender/26-27/18
Open Tender
Miscellaneous Services
90 days
GERGENDA SUB STATION WBSEDCL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,888
28 May 2026
28 May 2026
15 Jun 2026
28 May 2026
12 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Civil Works: | ||||||
| 1.01 | Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety. In ground floor
(a) 1:3:6 proportion | 5 | CUM | 3,426.93 | ₹17,134.65 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).
(f) 25mm to 30mm thick shuttering without staging in foundation etc | 10 | SQM | 207.05 | ₹2,070.5 | BI01010001010000000000000515BI0100001114 |
| 1.03 | Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect. (only the area in contact with concrete to be measured) | 30 | SQM | 93.93 | ₹2,817.9 | BI01010001010000000000000515BI0100001115 |
| 1.04 | Screed concrete on roof with cement concrete (1:2:4 ) including admixture of damp proof materials as per manufactures specification laid in panels as directed including cleaning, chipping and applying cement slurry @ 1.75 kg/SQM. Providing ghoondies at junctions with parapet etc. Shapping and finishing at mouths of rain water pipes complete with top finishing with cement punning not more than 1.5 mm thick, curring complete as per direction of E.I.C. (Same as Artificial stone).[Artificial Stone Flooring (Sl. no. 4 at Page no. 22 3rd CORRI.) minus Neat Cement Punning (Sl. 8 at Page no. 166)= Rs. 330.00 - Rs. 34.00 = 296.00].
Average 35 mm thick. | 250 | SQM | 298.96 | ₹74,740 | BI01010001010000000000000515BI0100001116 |
| 1.05 | Taking out old damaged tarfelt from the roof, parapet etc. preparing the roof surfaces by removing all spoils, blisters, moss etc. from the working site and disposal of the same beyond the compound and cleaning the site in all respect as per direction of Engineer-in-Charge.
All floors. | 250 | SQM | 12.12 | ₹3,030 | BI01010001010000000000000515BI0100001117 |
| 1.06 | Application of priming coat for standard bituminous waterproofing treatment over flat roof with Bitumen primer of approved brand fufilling the provision of I.S.1346-1991 & 3384-1986 applied @ 0.27 Liters /SQM overcleanand prepared roof surface complete as per satisfaction of the Engineer - in - Charge. | 400 | SQM | 24.24 | ₹9,696 | BI01010001010000000000000515BI0100001118 |
| 1.07 | Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per SQM & both faces covered with thermo-fusible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/SQM of manufacturer's specification on smooth,clean dry surface prepared wherever required.Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage,complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials,labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point > 150 deg C, Cold Flexibility < -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N: 300 (longitudinal), 200 (transverse) | 400 | SQM | 411.07 | ₹1,64,428 | BI01010001010000000000000515BI0100001119 |
| 1.08 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation,basement and upto roof of ground floor/upto 4 m.
(i) Tor steel/Mild Steel.
II. JSW/JSPL/SHYAM/
SRMB/BMASL/ELECROSTEEL/SSL | 0.5 | MT | 64,885.43 | ₹32,442.72 | BI01010001010000000000000515BI0100001120 |
| 1.09 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no separate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for EACH additional floor or 4m. beyond initiial 8m. or part thereof.
I) For structural members of specified sections weighing less than 22.5 Kg./m | 0.25 | MT | 75,316.71 | ₹18,829.18 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_2518920.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid